Personal work summary of water treatment (General 5)
Time flies, a period of work has come to an end, review this period of time, I believe that you have a lot of feelings about it, write a good job summarizing the lessons learned, to guide the future work. But how to write a work summary to be outstanding? The following is my personal work summary for you to organize the water treatment (General 5), only for reference, I hope to help you.
Water treatment of the individual work summary 1
Time like a shuttle, in the blink of an eye 20xx year-end approaching, my water treatment team in the workshop under the correct leadership and help to triumphantly complete the company under the production of various tasks. 20xx is the water treatment section of the year is not ordinary, the class staff unity of mind, struggling to fight with our sweat and efforts to continue to open up a new chapter. In this year colleagues out of every solid step to the company's innovative development goals for the landing point. We are working diligently, hard-working, better fulfill the job responsibilities within the provisions of the various work indicators. A year of hard work of colleagues let me feel gratified, the implementation of the company's management strategy makes me the future of the company's continuous development, pioneering and enterprising full of confidence. The following is my personal work and the combination of water treatment work experience as follows:
First, sewage treatment work and consumption
In the past 20xx, I sewage class 1-11 end of the month *** counting treatment of 321,259 tons of water, electricity 76,661 degrees, 6-11 end of the month biogas power generation 62,341 degrees. At the end of the month biogas power generation 62341 degrees, 3.1 tons of kerosene, hydrochloric acid 2.75 tons, urea 275kg, COD annual *** discharge 13.89 tons, COD annual average of 43.78mg / l, ammonia nitrogen annual average of 1.413mg / l annual tons, wine consumption of electricity 0.74 degrees.
The main work:
(1) the use of May Day and the 11 holiday period to organize sewage class cleanup alkali storage pool, pre-settlement tank, regulator pool sludge each time, each time the regulator pool mud is to the summer rotten smell thick, deep area of the pool with the pump is difficult to clean up thoroughly, it must be manually cleaned up the bottom of the pool auxiliary, as a team leader I have to be the first to take the lead and set an example of the dirty work to do, sometimes impeller churned to the impeller of the water pump is difficult to clean up thoroughly, it is necessary to manually clean up the bottom of the pool. Sometimes the impeller of the pump stirred to the foreign matter, you must put your hand into the stinking silt to clean out the foreign matter, in order to make the pump run normally, the other employees do not show weakness, with a homemade rake a little bit of silt pushed to the pump, no one employee is afraid of being dirty and tired, I think that only we can unite to do the best work.
(2) water recycling and sludge filtration project acceptance, from civil engineering to equipment installation and commissioning took more than three months to complete, I check the construction of electricity and site safety every day, to prevent safety accidents and make good records, and may happen to do so beforehand to arrange for a precautionary approach. The sewage discharged to meet the standards after dosing - Inclined plate sedimentation - intermediate precipitation - filtration - disinfection and other processes, tested by the quality control department COD is COD is below 40mg/l and suspended solids are greatly reduced, which can meet the requirement of greening water. The sludge filter press has greatly improved the dewatering effect of sludge through the control of dosage and the adjustment of pneumatic diaphragm pump. Through the training of the staff, every employee has reached the level of independent operation.
(3) biogas power generation project lasted more than 2 months on the generator set, water seal tank, steam separator, desulfurization tanks, positive and negative pressure protector, Roots fan, biogas storage bladder installation is completed, but due to the generator set and equipment commissioning personnel for various reasons, until June generator set to run formally, the generator is measured with 18.5 kilowatts of pumps 18-19 cubic meters of biogas per hour, with 37 kilowatts of pumps per hour, with 37 kilograms of biogas, the generator with the 18.5 kilowatt pumps per hour. Measured generator with 18.5 kW pump consumes 18-19 cubic meters of biogas per hour, with 37 kW fan consumes 29-30 cubic meters of biogas per hour, and with 18.5+37 biogas consumes 30.5-32 cubic meters of biogas. According to the anaerobic COD removal rate to calculate the amount of gas production, every 700 tons of water, (gas production of 22x cubic meters or so, within 5 hours of water intake), the amount of gas per cycle in 240-260 cubic meters or so, an average of 1 cubic meters of biogas hair 1.17 degrees of electricity. Since June, the power consumption of sewage tons of wine has been at a record low, and in November, we accomplished the achievement of 0.06 degrees of power consumption per ton of wine. We will not be proud or complacent, and we think about how to develop and innovate the biogas power generation in the development. We determine the standardized operation of biogas power generation, adjust the operation according to the actual biogas production, maximize the use of biogas, and determine the solutions for the main factors affecting the generation of biogas. Peak and valley power consumption is strictly controlled, and the peak power generation rate reaches 100%.
Second, strict quality control of sewage discharge qualification rate
Sewage treatment seems to be simple or not, no hard technical experience and professional responsibility is not complete the work, sewage treatment operation is not to other mechanical operations have certain rules, the quality of sewage water intake directly affects the quality of the later processing, so we are in the When dealing with each batch of water, we should strictly control the PH value of the sewage in the regulating pool, and any slight negligence will bring troubles and unnecessary losses to the post-treatment. In terms of quality control, we take the measure of timely storage or recovery of waste lye according to the water intake to realize the adjustment of PH value of the conditioning tank. According to the laboratory data timely adjustments to the treatment process control, requiring strict implementation of each class, in the section of the staff *** with the efforts to make the annual COD online pass rate of more than 95%.
Three, the technical condition of equipment operation and routine maintenance.
In the daily maintenance of equipment, we always adhere to the workshop equipment maintenance system, there is no major man-made accidents throughout the year, but at present the anaerobic outlet pipe is not optimistic, the problem lies in the corrosion of the anaerobic outlet pipe is serious, greatly increasing the difficulty of maintenance. Due to the increasingly severe requirements of environmental protection, the company's management level is constantly improving, in the maintenance of equipment, the technical level of my team is obviously weak, and the staffing is a little short. But I firmly believe that as long as we work hard, there is no such thing as an unwinnable battle.
Four, enhance the learning atmosphere, create a six-type team
According to the experience accumulated in the daily work, I often organize to analyze the problem, improve their own technical level. In order to better grasp the work of the sewage treatment site. In the workshop with the cooperation of the frequent organization of education and training, so that everyone has increased knowledge, improve the safety awareness, and be able to work in civilized production, safe operation, strict compliance with operating procedures and all relevant rules and regulations. In the future, we will actively explore and innovate, identify gaps and shortcomings, seriously improve, and truly integrate the six-type team building into the work.
V. Sewage crew work outlook and goals
20xx is a new beginning of a new journey, in the new year I sewage crew to develop the following work objectives:
(a) to create a "learning" crew. Firmly establish the concept of "lifelong learning" to improve the overall quality of staff, training of skilled personnel as the goal, to carry out the "creation of learning team, knowledge-based staff" activities as a carrier, and constantly improve the team learning environment, and strive to create a learning atmosphere; Establish and improve the learning system and incentive mechanism to promote and stimulate the enthusiasm of employees to learn; widely carry out job training and technical competition activities to improve job competitiveness and employees' operating skills. Efforts to build the team as employees study hard, enhance skills, improve the quality of the "cradle of talent".
(B) to create a "safety and health" team. Firmly establish the concept of "safety first, environmental protection first, people-oriented" to achieve the "zero accident" as the goal, seriously implement the work team job responsibility system, strict compliance with labor discipline, strong "three bases "(grass-roots team building, basic work, basic skills training), anti-"three violations" (illegal command, illegal operation, violation of labor discipline); strict implementation of technical standards, work procedures and operating procedures, to strengthen the execution of the team; effectively strengthen risk management, full participation in hazard identification, risk assessment, development and implementation of control measures, and improve the quality of work. , formulate and take control measures, and improve emergency response and disposal capability; carry out safety education and training for all staff, improve safety operation skills and safety awareness, and realize safe production. Efforts to build the team to become a special responsibility of all people, everything has someone to control, shift security "controlled cell".
(C) create a "skill-based" team. Focus on technological innovation, improve quality, reduce costs, improve quality service, to do the big picture, small, thrifty, good efficiency, adhere to the old, improve the utilization of equipment and facilities. The organization guides the staff to learn and master new technologies, and the operation skills and business quality have been improved. Firmly establish the concept of "clean production", to promote the coordination between the work team and the environment, realize the clean production of the work team as the goal, strictly fulfill the target responsibility of environmental protection, to prevent environmental pollution and ecological damage; to strengthen the management of pollution sources, and continue to carry out clean production, to eliminate pollution at the source; to strengthen the prevention and control of environmental pollution, to carry out self-control, mutual control and joint control, to achieve the goal of environmental pollution. , mutual control, joint control, to achieve the whole process of civilization, clean production. Efforts to build the team into a post clean, equipment clean, environmental clean `"green class station".
Individual work summary of water treatment 2In 20xx, XX city sewage treatment plant in the municipal party committee, under the correct leadership of the municipal government, in the Housing and Urban Renewal Bureau and other competent authorities of the higher level of support, in the whole plant workers with the cooperation and *** with the efforts to carry out all aspects of the work in a comprehensive manner. Inspiration, upward mobility, and carry forward the spirit of continuous struggle, so that the sewage treatment plant has been a great technological progress, both process control and personnel management, are in a steady progress and growth. Under the care and support of leaders at all levels, the treatment plant staff with a high sense of responsibility and a strong sense of mission, careful and solid work, the successful completion of various tasks, and achieved remarkable results. Now the completion of the work is summarized as follows:
First, the realization of excess production, the successful completion of the production plan
According to the sewage inlet and outlet water capacity and sewage debugging requirements, 20xx sewage treatment plant Chemical Oxygen Demand (COD) reduction target value of 95.36 tons, ammonia nitrogen reduction target value of 10.16 tons. Designed daily treatment of 10,000 tons of water, the actual daily treatment of 7,000 to 7,500 tons of water, the daily reduction of chemical oxygen demand value of about 1.12 to 1.15 tons, ammonia nitrogen reduction of 0.11 to 0.16 tons. Up to now our plant has completed the chemical oxygen demand reduction of 400 tons, ammonia nitrogen reduction of 40 tons, has exceeded the target of my plant, for the city and even the Heihe region's energy saving and emission reduction work has made an outstanding contribution; strict control of a variety of process operating parameters, based on XX environmental protection department testing and quality monitoring of the plant's laboratory, to strengthen the post inspection efforts and frequency of the implementation of the whole process of control of the production, always To achieve quality and quantity to complete the sewage treatment tasks. The average value of each compulsory index of effluent water quality is as follows: codcr23mg/l (standard value ≤ 60mg/l), ss17mg/l (standard value ≤ 20mg/l), total phosphorus 0.7mg/l (standard value ≤ 1.0mg/l), ammonia nitrogen 3.5mg/l (standard value ≤ 15mg/l), which is in line with the "municipal wastewater treatment plant pollutant discharge standards" at the national level. Standard provisions; backflow sludge to achieve normal dewatering throughout the year sludge, mud cake moisture content ≤ 70%, in line with the relevant national standards.
Second, the establishment of a distinctive culture, to create a humanistic management atmosphere
I plant adhere to the "pollution control and water purification, green humanities," the quality of the environmental policy, the scientific development of cultivation of human resources strategy, the establishment of a comprehensive and systematic training program, the use of a variety of forms of learning and exchange methods, each operating position to establish cross-worker training programs. method, each operating position to establish a cross-species composite technology, skills training. Make good use of the staff's light age structure, active thinking, strong innovation ability, accept new things quickly, etc., and flexibly consider a variety of comprehensive factors, through the written, on-site, oral presentation and other ways to detect the effect of training, optimize human resources. The ultimate realization of everyone understands the technology, everything has a special responsibility, to understand the basic knowledge of sewage treatment, understand the role of the building and management of the field, understand the distribution of pipelines and the use of methods, understand the meaning of the technical and economic indicators and methods of calculation, understand the meaning of the laboratory indicators and the application of the reasonable distribution of gas and mud, and will eliminate the operation of the faults of the technical and comprehensive team of professionals for the sewage plant to provide a strong safeguard for the safe operation of the sewage plant.
Three, promote public utilities, welcome "three for two" work conference
In order to further promote the province's "three for two" project construction, the provincial Department of Housing and Construction, the Provincial Development and Reform Commission, the Provincial Department of Finance, the Provincial Department of Environmental Protection and the Provincial Department of Health, the Provincial Department of Health, the Provincial Department of Health and the Provincial Department of Health. Department of Finance, the provincial environmental protection department and the provincial land department jointly held in our city, the province's "three for two" work conference and successfully completed. I plant because of the achievements, outstanding performance, led by the Housing and Urban Development Bureau, the organization of all participants to my unit to visit the inspection. Inspection team of my unit of sewage treatment work fully affirmed, commended my plant for the city's people to create a clean, civilized, orderly and safe living environment made a positive contribution. Fully embodies the city's scientific and strict implementation of the construction process, strengthen the quality of work management, and effectively improve the city's taste, improve the quality of life of residents, the "three for two" work to the letter.
Four, strengthen the awareness of saving, cost control is effective
In order to respond positively to the state put forward to create a saving society, I plant combined with the actual situation, in the whole plant within the scope of a series of "saving sewage plant" activities.
All the staff of the plant to recognize the place, measures in place, responsibility in place for the principle of cohesion, the formation of vitality, the spirit of full participation as a driving force, focusing on the plant's daily production, management process, pay attention to the effectiveness of the practice of savings. In order to ensure the comprehensive performance of equipment and facilities, improve the utilization rate, we according to the operating conditions of equipment and facilities, the establishment of various types of equipment basic accounts, the development of scientific and reasonable maintenance plan, in order to ensure that the production operation at the same time to reduce the loss of equipment. At the same time, the entire plant staff in the ideological concept of education, the entire length of the staff to seriously study and discuss the organization, extensive publicity and mobilization, fully aware of the "savings" activities to comply with the overall situation, the fulfillment of the responsibility of the specific performance is to achieve the plant's inevitable requirements for sustainable development. Each section to play to their strengths, to carry out a variety of forms, enjoyable publicity activities, mobilize the whole plant staff brainstorming, collective efforts, and strive for excellence, in the "saving" activities to do the example, to contribute, advocate saving, and comprehensively set up a plant for the concept of home, focusing on saving every drop of water, every one of the electricity, so that sewage treatment plant since its operation since the cost investment in the Heihe region and the province. Since the operation of the sewage plant cost investment in the Heihe region and the province at a lower level, to promote the plant's "thrifty and frugal, reduce costs and increase efficiency," the establishment and improvement of long-term mechanism.
Water treatment of personal work summary 3Light like an arrow, time like a shuttle. In the blink of an eye to work has been a year, looking back at the past year, I can not help but a thousand. In the leadership of the help of the leadership, as well as colleagues *** with the struggle, and after their own positive efforts, I successfully do their jobs, which is also considered to have experienced a period of extraordinary trials and tribulations. Thank you very much for the company to give me this platform for growth, so that I continue to learn at work, continuous progress, and slowly improve their own quality and talent. I was honored to be an intern employee of the company in xxxx. At the same time I also embarked on the journey north of the internship, in March 25, xxxx after three levels of safety education, I was assigned to the power plant sewage treatment post internship, in the Department of internship in this period of time, in the workshop under the leadership of the care of the leaders, in the team leader and the team teacher under the specific guidance of the masters, I quickly familiarize with the work of the sewage treatment in the Department of internship is very attentive to learning, and hard-working I have won the workshop leadership and team masters have been praised.
In July 20xx, I went to xx company officially work, the first to the company, I came to the post with curiosity and excitement, due to xx company is a new company, the process, equipment and the Department of a big difference, so I learned from scratch, I soon familiar with the process and equipment. From the Department of internship to the present has been nearly a year, now nearly a year's work is summarized as follows:
First, the daily work
1, strengthen the study, improve their own quality. Over the past year I have been able to study the company's systems, to participate in the company's various learning and training, and constantly improve their theoretical quality and operational skills.
2, diligent and pragmatic, for the development of my plant to do their duty. Over the past year, I have XX, XX and other different positions, regardless of which position to work, I can be based on their own duties, dedication and selfless dedication.
3, proactive, do their best to complete the work undertaken. In a year, I have always been strict with themselves, diligent efforts in their ordinary positions, do their jobs.
4, strengthen safety education, improve safety awareness. In practice, I always adhere to the concept of safety first. First confirmed after the operation, can be over serious about each piece of work.
Second, the future direction of the work
1, strengthen the safety education and learning and various skills training. Improve their business ability.
2, proactive, solid work.
3, unremittingly continue to add bricks and mortar to the branch and xx company.
Looking back, looking forward. For the past gains and losses, I will absorb the favorable factors to strengthen their ability to work, the unfavorable factors in their own work in the future to exclude, a year's work so that I have become a qualified worker on the road to move forward, I believe that through my efforts and cooperation with colleagues, as well as the guidance of the leaders, I will become an excellent employee, give full play to my personal capabilities. Thanks to the leadership to give me this a suitable work position, so that I can make their own contribution to the company. A year I did not do enough to the best, but I believe that in the future work, I will continue to continue to work hard, I believe that as long as I'm in the post a day, I will make their best efforts, all their energy and ability to use in the work, I believe that I will be able to do a good job!
Personal work summary of water treatment 4XXX wastewater treatment plant at all levels of leadership care and guidance, the hard work of all groups of workers, under the cooperation, to ensure the completion of the wastewater treatment plant's stable and standardized operation. Now in 20XX, XXX sewage treatment plant operation is reported as follows:
First, XXX sewage treatment plant energy saving and emission reduction completed
XXX sewage treatment plant strictly according to the company and the higher construction, environmental protection, finance, water conservancy, discipline inspection and other departments, strict management, always pay attention to ensure that the sewage treatment plant is stable and up to the standard operation. Keqi wastewater treatment plant since January 1, 20XX to the end of December 20XX, **** treatment of 4.23 million tons of wastewater, the treatment load rate of 77.3%, the average daily capacity of 11,600 tons, the average concentration of influent COD 450.4 mg / L, the average concentration of effluent COD 65.0 mg / L, to achieve a reduction of 1630 tons of COD; influent ammonia concentration of 58.2 mg / L, the average concentration of ammonia nitrogen, the average concentration of 58.2 mg / L, the average concentration of 58.2 mg / L, the average concentration of water, water, water and other departments of discipline inspection. 58.2mg/L, the average concentration of ammonia nitrogen in the influent water is 24.8mg/L, realizing the reduction of ammonia nitrogen by 151.3 tons; the effluent indexes all meet the national secondary standards for urban sewage discharge.
XXX sewage treatment plant online monitoring data and Chifeng City Environmental Protection Bureau monitoring platform real-time connection, regularly to the higher environmental protection departments, construction departments, development and reform departments to submit daily, weekly, monthly, quarterly, annual verification and other materials; to meet the State Ministry of Environmental Protection verification team, autonomous regions and the Office of Environmental Protection Inspection Team, the Eastern Supervisory Center Inspection Team, the Chifeng Municipal Bureau of Environmental Protection Inspection Team, the Chifeng City Environmental Protection Supervision Team, Chifeng Environmental Monitoring Station, the flag government, flag authorities and other inspections. Successful completion of all levels of environmental protection, construction and other departments to arrange the tasks assigned.
Second, Keqi sewage treatment plant workshop equipment operation
Keqi sewage treatment plant after five years of operation, due to equipment aging, winter frost, unstable water quality, sediment, etc., the frequency of equipment failures, wear and tear. For example: the influent grille room and a pump room due to unstable influent water quality, instantaneous flow is not easy to control, sediment, debris and other reasons lead to the grille can not operate normally, has affected the normal and stable operation of the sewage treatment plant, resulting in a reduction in the effect of sewage treatment. In order to ensure that the sewage is stable and meet the standards, for the equipment failure, especially inlet grille failure, sewage lifting pump failure, fan failure, etc. I plant many times to organize personnel to carry out desilting, maintenance. Ensure the normal operation of the equipment. Installed COD online monitoring equipment, ammonia nitrogen online monitoring equipment, all compared to the monitoring acceptance, compared to the results in line with relevant laws and regulations, and through the Chifeng Environmental Protection Bureau acceptance.
Third, the laboratory
Keqi Water Company water quality laboratory according to the company's requirements for domestic drinking water, sewage laboratory. *** on drinking water wells, fresh water plant water, pipe network end water test 58 times; complete the sewage self-test project 7 (water temperature, PH, COD, ammonia nitrogen, SS, dissolved oxygen), and on the sewage online monitoring system malfunctioning manually after the test data. The test results are in line with national standards.
Fourth, the sewage treatment plant upgrading and pipe network expansion project, water reuse and sludge treatment project progress.
Kesh XXX wastewater treatment plant upgrading project with a total investment of 99.4640 million yuan, 20XX completed upgrading project comprehensive equipment room, integrated water workshop, MBBR pool renovation, composite hydrolysis pool, sludge pumping room and other construction projects, complete cable laying, equipment procurement and installation work. Entering the commissioning stage, and by the end of the year to complete the environmental acceptance.
Water reuse and sludge treatment project plans to complete the pre-project procedures, plans to start construction in September 20XX.
V. 20XX work plan
According to the 20XX workshop equipment operation, in 20XX I plan to part of the running time, high failure rate of the equipment (such as: blowers, grills, pumps) to carry out professional repair and maintenance work; plans for two times a year (once in May after the warming of the temperatures, and once in winter) on the influent grids. October once a year (after the warming of the temperature in May, before the winter) on the influent grille room, influent pump room, biofilter, the second pump room sediment sediment cleanup, in order to ensure that the grille, sewage lifting pumps for normal operation; to strengthen the management of the laboratory, increase the testing program, testing frequency, to ensure the quality of experiments; efforts to learn, the sewage treatment process, the country's new standards, new methods, and sewage laws and regulations, such as learning. Efforts to enhance the professional quality of staff, improve the staff's personal ability to ensure that the sewage treatment plant is stable and up to standard operation. According to the company and the higher authorities to ensure the stable operation of sewage treatment plant, for the energy saving and emission reduction of Keqi contribute their own strength.
Water treatment of personal work summary 520xx year will soon be over, looking back on the past year, in the company's correct leadership and close cooperation with the relevant departments, I always adhere to the scientific guidance, the implementation of the scientific concept of development, "want to officer, will officer, do a job" as the goal, to conscientiously fulfill their duties, and successfully complete all the tasks. Successful completion of various tasks. In order to do a better job of production in the future, summarize experience, improve working methods and efficiency, and overcome shortcomings. Now the 20xx work completed report as follows:
First, focus on theoretical learning, constantly improve their own quality, and strive to enhance the ability to work.
The basis for improving their own quality is to learn, enhance the ability to work or the source of learning. In the last year, due to the lack of work experience, I exposed a number of problems in practice, with these lack of experience, now I work will obviously feel more than ever smooth, in fact, the so-called twice as much as half as much, that is, every day as far as possible, cumulative progress, even if it is just a few "insignificant" details, the day long down the road is a sum of money, but also a lot of money. The day long down is a wealth that can greatly help the work.
I adhere to the study in an important position, and constantly improve the management level and theoretical level. Always do self-esteem, self-reflection, self-quality and constantly improve, better adapted to the needs of the work task. Along with the development of enterprises and social progress, environmental protection to meet the standard has been a *** knowledge and requirements, our sewage treatment operation post also planned for the future of environmental protection development plan, we will summarize the past results, draw on, learn from external successful experience, and constantly improve the image of environmental protection of enterprises, and respond positively to the national policy, with the environmental protection departments at all levels to step up their efforts, and pragmatic grasp of the enterprise's economic development at the same time, and grasp the Environmental protection governance, always pay attention to unremittingly, to create a more brilliant tomorrow, environmental protection enterprises.
Second, love and dedication, conscientiously fulfill their duties, and strive to improve the quality of work
Continue to carry forward the work, love the work style, with a high sense of responsibility, sense of mission and enthusiasm for the work, and actively responsible for the work. Efforts to familiarize themselves with the work. In constantly improving their own quality at the same time to improve the overall skills of the staff, to facilitate better completion of the various production tasks. I always adhere to the serious, responsible, meticulous for the purpose of work, seriously complete the work given by the superiors, so as to live up to the trust of the leadership, not ashamed of the support of colleagues respect.
As the saying goes, "The train runs fast, all depends on the front end. In production, often in the workshop, on-site inspection, found that the problem is dealt with in a timely manner to improve work efficiency. Equipment failure, I and extremely time to repair the external reason, before the vacation, I led the whole class to do a good job of leadership to the work, whether it is to clean up the site hygiene or in the machine maintenance, I am the first to actively participate in, and employees with the sweet **** bitter.
Third, play the leading role of the team leader
The work of the team leader directly affects the quality of the work of the workshop. Therefore, the workshop from time to time held a meeting of the team leader, will be found in the problem and the situation for detailed analysis and discussion, so that employees are skilled in mastering the correct production operation skills, on the other hand, but also for the occurrence of accidents or the occurrence of abnormalities, the emergency measures to be taken to guide, and strive to improve the team leader's safety and technical level of accidents and emergency response processing capacity. Requirements for the team leader to continue to strengthen learning, improve their own quality, require the team leader not only to do a good job in the workshop production work, but also skilled in the use of workshop machinery and equipment, and master the principles of the equipment, to master a certain repair skills, and really play the role of the workshop model.
Fourth, grasp the safety work
Emphasize that the construction of the team should adhere to the people-oriented, in order to establish the team team as the core, in order to strengthen the management of the team as the focus to create the main line of security, and put forward a number of closely related to the safety of the production of the requirements:
1, set up a sense of responsibility for safety production. Put safety in the heart, the past mouth to talk about safety into the heart now want to safety. The formation of safety work every day, everyone grasp the good situation.
2, effectively do a good job in the class tour inspection work, the operation of production equipment, production equipment, each system tour inspection, in order to find abnormalities in a timely manner, take measures to eliminate hidden dangers, troubleshooting, to prevent accidents.
3, the strict implementation of the shift handover system, the requirements of the shift handover personnel must be face-to-face production, safety and other situations clearly, so that not clear on the shift, to prevent the production of a crisis due to the shift handover is not clear safety.
4, strictly wear the company's labor protection products, to protect their own safety and health. Through our efforts, the production workshop in 20xx no production safety accidents occurred, to ensure safe production.
Thank you for the support of the leadership and the help of comrades, I would like to express my heartfelt thanks to the workshop leadership and class members! The above is a summary of my thoughts and work over the year, incomplete and inaccurate places, please leadership and comrades to criticize and correct. In the future work, I will do a good job of personal work plan, set goals, make their work better, live up to the expectations of colleagues, live up to the trust of the leadership.
;