Departments such as development reform, natural resources planning, finance, housing and urban-rural construction, public security, etc., are responsible for the supervision and management of people's air defense projects in accordance with their respective duties. Chapter II Planning and Construction Article IV city and county (city) people's air defense department shall, in conjunction with the competent department of natural resources planning at the same level, according to the overall urban planning and people's air defense requirements, combined with the special planning for the development and utilization of underground space, the preparation of people's air defense special planning, clear scope of protection of the city, the division of air defense zone, important economic objectives protection, regional integration and near- and long-term key construction projects and other content. Article 5 cities, towns, detailed control planning shall implement the people's air defense special planning content, dedicated chapter of the people's air defense facilities, the people's air defense project construction control requirements.
The competent department of natural resources planning department shall seek the opinion of the people's air defense department at the same level before issuing prequalification for land use and site selection for construction projects or when preparing planning conditions. In accordance with the provisions of the people's air defense project should be built on the construction site, the people's air defense departments to put forward the wartime function, level of protection, scale of construction, interconnection and interoperability, or easy to build and other engineering setup requirements, and by the competent department of natural resources planning in the land use of the pre-trial and siting opinion or land transfer program to be clear. Article VI of the city, town master plan to determine the following urban construction land within the scope of the new (including alteration, expansion, the same below) ground civil buildings, in accordance with the total floor area (hereinafter referred to as the area of the floor area) and the required proportion of the approved people's air defense projects should be built 6 area (hereinafter referred to as the area to be built):
(a) Ningbo City, the central urban area: the proportion of 11% of the new residential housing; For new construction of other civil buildings (with a total area of more than 2,000 square meters, the same below), the ratio is 8%.
(2) Ningbo city center outside the urban areas established by law, development zones, industrial parks, bonded (port) zones, counties (cities) and important economic goals and other areas: new residential housing, the proportion of 8%; new construction of other civil buildings, the proportion of 5%.
(C) key towns of people's air defense: the proportion of new residential housing, 7%; new construction of other civil buildings, the proportion of 4%.
Construction of medical rescue works, works of professional people's air defense teams or level 5 personnel sheltering works can be offset against the area to be built in accordance with the ratio determined in Article 4, Paragraph 2 of the Measures for the Administration of Air Defense Basement in Zhejiang Province. The connecting passage that meets the protection requirements can be counted into the area of the people's air defense project according to the actual construction area. Article 7 The construction of urban underground transportation arteries and comprehensive pipeline corridors should take into account the needs of people's air defense; combined with urban plazas, green space and other separate construction of underground space, taking into account the needs of the people's air defense shall not be less than 30% of the total area of the underground. Article VIII of the people's air defense project layout should be combined with wartime use, sheltering the number of people, the spatial environment and other factors reasonably determined, and in accordance with the requirements of the interconnection or reserved connectivity port.
People's air defense works in the air defense zone and along the rail transit line can be set up in accordance with the requirements of the people's air defense special planning, comprehensive utilization. Article 9 The people's air defense command works and public people's air defense works shall be organized and constructed by the competent department of people's air defense.
Professional people's air defense team works, medical rescue works and other special works shall be organized and constructed by the relevant departments.
People's air defense works used for sheltering personnel or materials in new ground civil building projects shall be constructed by the relevant units in accordance with the law. Article 10 The civil buildings which should be constructed with people's air defense works, their construction units shall organize the construction plan design of the people's air defense works in accordance with the requirements of the project set up as determined in Article 5 to Article 7 of these Measures.
Conforming to one of the following circumstances, the construction unit may submit an application for easy construction to the competent department of people's air defense, and the competent department of people's air defense shall verify the application within five working days from the date of its receipt:
(1) the location of which is prohibited or restricted from exploiting the underground space;
(2) the restriction of the geologic conditions due to the quicksand, the dark river, the bedrock with a shallow burial depth, etc.;
The construction unit may apply to the competent department of people's air defense for easy construction. (c) It is difficult to take measures to ensure construction safety due to the limitation of buildings or underground pipeline facilities around the construction site;
(d) It is difficult to meet the requirements of people's air defense engineering technology for the net height of the basement;
(e) The area to be constructed is less than 1,000 square meters, or the designed area of the people's air defense project is less than that to be constructed, and the structural and foundation treatment is difficult, and the economy is not reasonable. Structure, foundation processing difficulties, economic unreasonable;
(F) control detailed planning to determine the plot of land, the people's air defense works have been built to meet the requirements of the people's air defense special planning;
(VII) the state or provincial regulations can be not built or less construction of other cases.