Comprehensive acceptance mainly includes: 1 construction project file pre-acceptance? 2, construction project completion acceptance record 3, residential industrialization technology implementation, 4, public **** facilities and roads, greening and other infrastructure completion verification 5, drainage permit 6, construction project planning verification 7, water supply facilities, heating works, gas works, such as acceptance of proof of 8, pre-permanent property management completion verification 9, the property warranty deposit proof 10, acceptance of the power supply facilities, and so on.
And the completion of the acceptance that is the second
Completion of the acceptance refers to the completion of the project after the completion of a comprehensive acceptance of all projects.
Completion acceptance is a construction project after the completion of the development and construction units together with the design, construction, equipment supply units and project quality supervision departments, the project is in line with the planning and design requirements as well as the quality of building construction and equipment installation for a comprehensive inspection, to obtain the completion of the qualifying information, data and vouchers. Completion acceptance, is a comprehensive assessment of the construction work, check whether it meets the design requirements and the quality of the project is an important link, to promote the construction project (project) timely put into operation, to play the effect of investment, summarize the construction experience has an important role.
It should be noted that the completion of the acceptance is based on a phased acceptance, the previous has been completed acceptance of the project is generally in the housing completion of the acceptance of the acceptance is no longer re-acceptance.
Acceptance is based on:
Approved design task book, preliminary design or expanded preliminary design, construction drawings and equipment technical specifications and the current construction technical acceptance specifications and the competent authorities (companies) relevant approval, modification, adjustment documents.
Projects that introduce new technologies or complete sets of equipment from abroad as well as Sino-foreign joint venture construction projects should also be accepted in accordance with the signed contract and design documents and other information provided by foreign countries.