What are the contents of the simultaneous review of project three?

the safety review of a project includes the whole process from the feasibility study to the design, construction and final acceptance. 1. Review of feasibility study report The review of feasibility study report is to comprehensively analyze and demonstrate the occupational safety and health technology and engineering of the project according to the requirements of short-term and long-term planning, regional planning and operation planning of national economic development, mainly including the qualitative and quantitative preliminary analysis of technical advancement, economic rationality, production feasibility and various indicators, so as to determine whether the occupational safety and health measures of the project are feasible. The contents of the review report mainly include the main occupational hazards that may occur in the production process, the expected degree of hazards, the factors causing hazards and their locations or regions, the number of employees who may be exposed to occupational hazards, and the names and quantities of the main toxic and harmful substances and flammable and explosive substances used and produced; The scheme of occupational hazard control and its feasibility demonstration; Estimation of special investment in occupational safety and health measures; Realize the expected effect of governance measures; Problems and solutions in technology and investment. 2. Preliminary design review The preliminary design review is based on the feasibility study report, in accordance with the contents and requirements of the Special Chapter on Occupational Safety and Health in the Interim Provisions on Occupational Safety and Health Supervision of Productive Construction Projects of the Ministry of Labor, and in accordance with the relevant standards and norms, to conduct a comprehensive and in-depth analysis of the Special Chapter and put forward concluding opinions on occupational safety and health in construction projects. The tone of the preliminary design review should be practical. Review the Occupational Safety and Health Special Chapter in the preliminary design, which mainly includes the following contents. 1) Design basis (1) Relevant regulations of the state, local governments and competent departments. ? (2) the main technical specifications, procedures, standards and other basis. 2) Overview of the project (1) The tasks and scope of this project design. ? (2) Engineering nature, geographical location and special requirements. ? (3) General situation of occupational safety and health before reconstruction and expansion. ? (4) Overview of main processes, raw materials, semi-finished products, finished products, equipment and main hazards. 3) Building and site layout (1) Main risk factors and preventive measures predicted according to meteorological, geological, lightning, rainstorm, flood and earthquake conditions in the site. ? (2) The influence of the neighboring conditions of the factory on the occupational safety and health of the factory and the preventive measures. ? (3) The influence of the general layout of the factory on the occupational safety and health of the whole factory, such as boiler room, oxygen station and acetylene station, and the warehouses of inflammable, explosive and toxic substances, and the preventive measures. ? (4) Occupational safety and health of passages and transportation in the factory area. ? (5) The safety distance, lighting, ventilation and sun exposure of the building in the general layout design, and the relationship between the main harmful gases and the main wind direction. ? (6) Auxiliary rooms include ambulance room, medical room, bathroom, dressing room, lounge, nursing room and women workers' clinic.

for more information about the engineering/service/procurement bidding, and to improve the winning rate, you can click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd