What kind of transportation is available to the Olympic Park Hockey Stadium?

Olympic Park Hockey Stadium Transportation Guide: By Air

Beijing Capital International Airport is located in Shunyi District, northeast of the city, about 30 kilometers away from the city. The Capital Airport is the first airport in China to have three terminals, three runways and two towers in operation at the same time. Among them, Terminal 3 is currently the world's largest single terminal and the first non-competitive Olympic venue to be put into operation.

Taxi: Taxis operating at the Capital Airport start at 10 yuan/3 kilometers, then 2 yuan/kilometer, and after 15 kilometers of driving, a 50% air fare is added for each kilometer. A taxi from downtown to the airport costs about 80 yuan.

Airport buses: Line 2, 3, and 4 depart at 15-minute intervals in both directions, while other lines depart in no more than 30 minutes, and at any time when full. Tickets are available at the airport and at various stops in the city, and the fare is a flat 16 yuan.

Airport Line 1: Capital Airport - Fangzhuang (Guiyou Building), via Liangmaqiao, Baijiazhuang, Dabeiyao (China World Trade Center), Panjiayuan, Shilihe (Jingrui Mansion), the first bus at 6:00, the last bus at 19:30; Fangzhuang-Capital Airport, via Dabeiyao

(China Southern Airlines Hotel), the first bus at 7:30, the last bus at 19:30. 7:30, last bus 22:30.

Airport Line 2: Beijing Capital Airport - Xidan (Civil Aviation Business Building), via Sanyuan Bridge, Dongzhimen, Dongsishitiao Bridge, first bus 7:00, last bus until end of flights on the same day; Xidan - Beijing Capital Airport, via Dongzhimen (50 meters east of the bridge), first bus 5:30, last bus 21:00.

Airport Line 3: Beijing Capital Airport-Beijing Railway Station, via Yuyang Hotel, Dongdaqiao (not stopping after 22:30), Chaoyangmen, Yabao Road, first bus at 7:30, last bus until the end of flights on the same day; Beijing Railway Station-Beijing Capital Airport, via the International Hotel (West Gate), Dongzhimen (50 meters east of the bridge), Jingxin Mansion (50 meters east of the bridge), and Beijing International Airport. 50 meters), Jingxin Mansion (West Gate), first bus 5:30, last bus 21:00.

Airport Line 4: Beijing Capital Airport - Gongzhufen (Xinxing Hotel), via International Exhibition Center, Xibahe, Anzhen Bridge, Madian Bridge, Beitai Pingzhuang, Jimen Bridge, Friendship Hotel, Beijing TV, Zizhu Bridge, first bus 7:00, last bus 23:00; Gongzhufen - Beijing Capital Airport, first bus 7:00, last bus 23:00; Gongzhufen - Beijing Capital Airport, first bus 7:00, last bus 23:00 00; Princess Tomb - Capital Airport, via Friendship Hotel (North Gate Airline Ticket Office), Beitaipingzhuang, Anzhen Mansion, Aerospace Bridge, first bus 5:30, last bus 21:00.

Airport Line 5: Capital Airport - Zhongguancun (Bridge No. 4), via Wangjing (Huajiadi), Xiaoying, Asian Games Village (Anhuiqiao) Bridge No. 4, the first bus is at 8:30 and the last bus is at 21:30; Zhongguancun-Capital Airport, via Beihang (North Gate), Huixin West Street (Anhui Mansion), Huixin East Street (Sinopec Group), the first bus is at 6:00 and the last bus is at 19:30.

Airport Line 6: Nanyuan Airport - Xidan, via Fuhai Park, the departure time is adjusted according to the flight time.

Wangjing Line: Capital Airport-Wangjing (Civil Aviation Cadre Management Institute), via Huajiadi Beili, Nanhuqu, Wangjing Street West Exit, Wangjing Garden West, the first bus leaves at 7:00, the last bus leaves at 23:00; Wangjing-Capital Airport, via Wangjing Garden West, Wangjing Street West Exit, Guangshun Street North Exit, the first bus leaves at 5:45, the last bus leaves at 19:30. :45, last bus 20:45.

Tianjin direction: Beijing Capital Airport departs from 7:00 to 23:00, every 30 minutes after 7:00, 8:00 and 9:00, the place of taking the bus is opposite to the No.15 exit port; Tianjin departs from 4:00 to 18:00, every 30 minutes after 4:00, 5:00 and 6:00, the place of taking the bus is at the intersection of Nanjing Road and Shanxi Road. Nanjing Road and Shanxi Road intersection. The fare is 70 yuan.

Nanyuan Airport is located in Fengtai District, the southern suburb of Beijing, 15 kilometers from Tiananmen Square, with a 4C runway, the first large-scale dual-use airport in Beijing. Currently the navigable cities are Wuxi, Jiamusi, Jingdezhen, Dalian, Harbin, Hailar, Chengdu and Hohhot.

Transportation: Take No. 13, No. 62, No. 115, No. 610, No. 369, No. 353, No. 953 and get off at Xinhua Road South Exit.

Railway

Beijing is the hub of the national railroad, ****there are 6 passenger train stations.

Beijing Railway Station is located at No. 13, A, Maojiawan Hutong, Dongcheng District, and can be reached by subway or many buses. Beijing Station is a national railroad passenger station of special class, mainly taking charge of passenger transportation on the Jingshan, Jingqin, Beijing-Shanghai, Jingcheng, Jingyuan, and Jingbao lines, as well as international and international intermodal passenger trains to Pyongyang, Ulan Bator, and Moscow.

Beijing West Railway Station is located at No. 19 Guanglian Road, Fengtai District, and can be accessed from the city by taking Subway Line 1 and getting off at the Military Museum Station. Beijing West Railway Station is also a special class station, and trains departing from here cover major cities in South China, Southwest China and Northwest China.

Beijing South Railway Station is located at No.12 Yongwai, Chongwen District, and has been put into operation in August 08. The new South Railway Station has become the most modern railway station in Beijing, and has become the starting station of Beijing-Shanghai High-speed Railway.

Beijing North Railway Station is Xizhimen Railway Station, which can be reached by taking subway line 2 and getting off at Xizhimen Station. The station was designed and built by Zhan Tianyou and has been listed as a first-class cultural relics protection building in Beijing. The station is mainly used to transport tourists to Badaling and Kanxi grassland in the suburbs of Beijing.

Beijing East Railway Station is located at No.7 Baiziwan Road, Chaoyang District.

Fengtai Railway Station is located at No. 4, Zhengyang Street, Fengtai District, and is a comprehensive special station integrating passenger, cargo, transportation and loading.

Highway

There are 12 national highways*** radiating in all directions with Beijing as the center, which can reach Shenyang, Tianjin, Harbin, Guangzhou, Zhuhai, Nanjing, Fuzhou and Kunming.

Beijing has 9 expressways: Badaling Expressway, Capital Airport Expressway, Jing-Shen Expressway, Jing-Jin-Tang Expressway, Jing-Shi Expressway, Jing-Zhang Expressway, Jing-Cheng Expressway, Jing-Ha Expressway and Jing-Kai Expressway.

Beijing*** has 19 long-distance bus stations.

Beijing has now opened high-speed direct passenger transportation to Benxi and Liaoyang. Both routes travel on the Beijing-Shenyang Expressway, with free meals provided on the way. The Benxi route is 820 kilometers long, with a fare of 195 yuan, and a daily departure at 10:30 a.m. from the Bawangfen Long-distance Bus Terminal (with some departures from the Sihui Station), and a return departure from the Benxi Bus Terminal at 20:00 p.m. The Benxi route is 700 kilometers long, with a fare of 195 yuan. The Liaoyang line is 700 kilometers long, with a fare of 170 yuan, also daily, departing from Bawangfen Long Distance Bus Terminal at 11:00 a.m., and returning at 22:00 a.m. from Liaoyang Bus Terminal.

Bus

Bus fares in the city are a flat RMB 1 yuan, suburban buses start at RMB 1 yuan, with additional fares in units of RMB 0.5 yuan or RMB 1 yuan depending on the distance traveled, and air-conditioned buses are more expensive than regular vehicles. It is recommended to apply for a public transportation card, which offers a large discount and is easy to use.

Bus card: The Beijing municipal government stipulates that anyone who uses a card to ride the bus will get a 40% discount on the bus ticket, and students can apply for a student card with a student ID card, which gives them a 20% discount on the bus fare. Students can apply for a student card with a student ID card, which gives them a 20% discount on fares. You can apply for a student card at subway stations and some bus hubs and big shopping malls, with a deposit of 20 yuan. (Beijing Station subway window and Beijing West Station bus hubs can be handled, acceptance point at 7:00 p.m. after work)

Time ticket card: 3-day card fare 10 yuan, limited to 18 times within 3 days; 7-day card fare 20 yuan, limited to 42 times within 7 days; 15-day card fare 40 yuan, limited to 90 times within 15 days of the day use. It can be used on all urban bus routes except the "9" bus, excluding the subway. The deposit is 20 yuan.

Specialized Tourist Lines

There are many kinds of specialized tourist buses in Beijing, one of which is the special tourist buses starting with the word "tour", and the fare varies according to the length of the journey, and the limousine and air-conditioned buses, generally ranging from 30 yuan to 70 yuan, of which the buses from Tour 1 to Tour 5 depart every day, and Tour 6 to Tour 18 and Tour 18 are all on Saturdays and Sundays. Special buses are available on Saturdays, Sundays and legal holidays; in addition, there are "9" buses (20% discount with a card) and one-day tour buses.

Man-powered pedicabs

Beijing's pedicabs are usually found in the center of the city, at traffic junctions and tourist hotspots, and on holidays, because of the serious traffic jams with cabs, people go for pedicabs that go through the small hutongs. Plus, it's easy to see the street from a pedicab, so pedicabs cost slightly more than cabs.

Bicycles

Bicycles are available for rent in many of Beijing's major hotels for around 20 to 30 yuan a day. For a more thorough understanding of Beijing, rent a semi-new bike and then you'll be able to navigate the hutongs and alleyways of the city center to your heart's content.

Other special tourist trains

There are special tourist trains departing from several train stations in Beijing at regular intervals every day to attractions on the outskirts of the capital. Tickets for holiday excursion trains can be purchased at Beijing Railway Station, Beijing North Railway Station, Beijing South Railway Station and Beijing Railway International Travel Agency. Tourists can buy tickets for tourist attractions at the designated ticketing locations of the railroad, and there is no need to buy tickets again when they arrive at the scenic spots. With the tickets, they can take free rides on excursion trains departing from Beijing Railway Station, Beijing North Railway Station and Beijing South Railway Station.

Subway

Beijing currently has Subway Line 1, Subway Line 2, Subway Line 5, Subway Batong Line, and Subway Line 13 (light rail). Line 1 starts from Apple Park in the west and goes to Sihui East Station in the east; Line 2 passes through Xizhimen, Fuxingmen, Hepingmen, Qianmen, and Beijing Railway Station; and the Batong Line runs from Sihui to Tuqiao. The first train is usually at 5:00 a.m., and the last one is around 23:00 p.m. Fares are a flat 739 yuan, with no discount on the one-card.

The three competition venues in the Olympic Forest Park are the Olympic Park Tennis Courts, the Olympic Park Hockey Stadium and the Olympic Park Archery Range. Among them, the field hockey and archery fields belong to the temporary construction venues, after the 2008 Beijing Olympic Games, artificial grass and other parts of the park will be utilized in other ways.

Location and area

The field hockey stadium, located in the southern part of the Olympic Forest Park, has a total floor area of 15,546 square meters and is mainly composed of the final venue, the preliminaries, 14 ancillary buildings, grandstands, and a variety of auxiliary parking lots and road facilities. The final venue is located in the west of the center of the site, with 12,000 seats; the preliminaries are located in the east of the center of the site, with 5,000 seats. Of the 14 annexes built around the site, six are for backyard functions and eight are for spectator services.

Related information

1. Hockey field has high requirements for water permeability and retention

The field hockey field and archery range were also built in the Olympic Park, and the two fields echoed the tennis center in the park. Field hockey field construction in Beijing's dry soil environment to study both effective water permeability at the same time can also be the right amount of water retention turf, which is a test of the project attack. The turf for the field hockey rink has been finalized, and the design of the entire grass layer is to be determined next month as the best option.

Hockey field construction responsible person said: as the Olympic field hockey game field, in the field of water seepage, water retention performance, the ball's rebound performance, the field of friction underfoot, the ball's rolling performance as well as rolling bias and so on have clear requirements. Among them, the court both to seepage and water retention of the dual requirements to the construction of a new test, in accordance with the requirements of the court in the sprinkler 35 minutes, the surface of the average retention of 3 mm of water, and the amount of water in any one place shall not be less than 2 mm. To this end, the construction staff used two gray soil, coarse asphalt, asphalt, lawn shock-absorbing layer, artificial lawn of the five-layer paving method, so as to pass the assessment of the International Quarterback League, to achieve the highest level of certification standards. It is reported that after the completion of the venue, it will become the highest level of field hockey venues in China.

2. Green Olympics: green before, during and after the game

The 15,546-square-meter Olympic Park Hockey Stadium mainly consists of Hockey A, Hockey B, 14 ancillary buildings, grandstands, and a variety of auxiliary parking lots, roads and facilities. Field hockey A is located in the west of the center of the site for the final match, with a capacity of 12,000 spectators; Hockey B is located in the east of the center of the site for the preliminaries, with a capacity of 5,000 spectators. During the Olympic Games, it will be used to host the Olympic men's field hockey (12 teams) and women's field hockey (10 teams) competitions; during the Paralympic Games, it will be used to host the Paralympic 5-a-side and 7-a-side soccer competitions. As the venue for field hockey at the 29th Olympic Games in 2008, it will produce two gold medals in men's and women's field hockey.

3. Pre-match garden site interprets the green Olympic concept

During the construction process, the construction unit paid close attention to the site's tidiness. Site blue enclosure neat and unified, publicity columns arranged in a staggered manner. The road surface is clean and tidy, all kinds of materials, finished products, semi-finished products, waste products, etc. partitioned into stacks and hanging signs marked. Inside the construction site, there are material identification signs, floor access signs and safety warning signs everywhere. Inside the living area of the workers, there are sunbathing area, reading room, shower room and so on.

Subsequently, according to the first is a clear division of labor, the implementation of responsibility. Then, the implementation of the assessment. The approach to keep the garden site: throwing cigarette fines; not wearing a helmet fine; site site every day someone special cleaning, morning, noon and night statutory three times, once can not be less; site of the fire equipment can not be dust; construction site can not be left with broad beans big lumps

After a period of time, the work is completed, the end of the material, the site clearing gradually become the last process of construction every day, the construction workers Will consciously put the garbage, waste materials consciously to the designated location, gradually, we have become accustomed to nature, the site has become a green site.

4. Paving and greening of the site during the tournament, and the Olympic Forest Park after the tournament

The field hockey and archery fields in the Olympic Park are temporary venues, and will be restored to the green space of the Olympic Forest Park after the tournament.

In addition, in order to reflect the concept of Green Olympics, the archery range function rooms and ancillary rooms of the sewage, into the self-built sewage treatment station, generating water, used for green watering and other recycling, to achieve a zero-discharge of sewage; air-conditioning system, all the use of non-fluorine environmentally friendly refrigerant, does not destroy the ozone layer, to achieve the Beijing Organizing Committee for the Olympic Games of the environmental protection commitment; the choice of energy-saving and environmentally friendly solar energy as athletes and officials bathing water heaters, both saving electricity, but also to save energy, and to save energy. The use of energy-saving and environmentally friendly solar energy for the baths of athletes and officials not only saves electricity, but can also be recycled after use. Meanwhile, permeable tiles have been installed on the sidewalks of the stadium and the ground of the plaza so that the rainwater can seep into the ground and be recycled directly.

5. Scientific and technological Olympics: emphasizing the use of science and technology and insisting on independent innovation

In the design and construction of the Olympic field hockey stadium and the archery range, the relevant parties have actively implemented the concept of scientific and technological Olympics. In addition to a series of steel structure, solar energy and other designs, the construction party, Beijing Sumitomo Group II, has set up a science and technology research group by deploying the best and brightest, and has successfully adopted new materials and technologies such as heat preservation and decorative integrated finished panels, exterior insulation technology, waterproofing technology for grandstands, and artificial lawn technology for the outdoor training ground in the construction of the project, not only to improve the technological content of the project but also to speed up the progress of the project and to ensure that the project is completed in a timely and efficient manner. Moreover, it accelerated the project progress and ensured the construction quality of the Olympic field hockey training ground renovation and expansion project.

The project department actively cooperates with the design unit, promotes the application of new materials and new technology, seals the intersection of steel plates with weather-resistant adhesive, and makes indoor waterproofing materials with one-component polyurethane from Bayer, Germany, solving the technical difficulties of waterproofing at the intersection of the sloping surface of the grandstand and the function room. At the same time, in order to make the grandstand board reduce vibration and noise, the project department innovated independently and changed the original design of the long direction lap joint between the partition board and the grandstand board to short direction lap joint. After testing, this small change not only reduces welding points and saves cost, but also has the good effect of reducing noise. The steel structure construction of the field hockey rink won the Beijing Great Wall Cup Award.

The field hockey arena project is a temporary arena, but Sumitomo Group requires the project to be done in accordance with the standard requirements of an official arena, to ensure the use of the function, and to ensure the completion of the project. Attached to the room color steel plate maintenance and water and electricity installation contradictions, in the tile prism iron hole, installation of electrical switches, safety sinks, mirrors, etc. is very difficult, but also not neat, affecting the aesthetics. Technicians brainstorming, in the node at the hole cleverly installed stainless steel mat board, a better solution to the problem of aesthetics.

Environmental solar shower equipment, the original design for the centralized supply of the whole site together, the pipeline is long, poor insulation. The technicians adopted the recommendations of the chairman of the board of directors of the company to live two Qin Yunshan, redesigned, the solar energy decentralized settings, both to solve the problem of heat preservation, but also to save the delivery of water pipes. Selection of fireproof board instead of fireproof paint, to meet the fire requirements, fireproof board can be recycled, fully embodies the idea of running the Olympic Games diligently and thriftily.

Additionally, the field hockey rink is equipped with artificial turf of Australia's international brand, which has the three major characteristics of flatness, water retention and water permeability, better reflecting the concept of scientific and technological Olympics.

6. From design to construction, the field hockey venue is interpreting the Humanistic Olympics

At the beginning of the design process, the field hockey venue was decorated with two-way ramps for the disabled in each grandstand, chic showers and 110 restrooms. During the construction period, the schedule is very tight, the construction side of the field hockey field width of 1.2 meters of the audience evacuation port to 1.8 meters, etc., but also a good interpretation of the humanistic Olympic construction concept.

In addition, due to go to the field hockey project for the operation mode of multi-specialty, multi-specialty, multi-team, interspersed operations, which gives the site commander-in-chief general coordination has increased the difficulty, but also to the logistical services put forward a serious test. As the saying goes, before the troops and horses move, food and grass first. The construction party, Sumitomo Corporation, the second company of the Olympic Project Department, strictly fulfills all kinds of rules and regulations, high standards and strict requirements for the accommodation of migrant workers, to maximize the improvement of the living conditions of migrant workers, to provide a solid guarantee for the front battle. Firstly, it sets up standard living areas, sanitary rooms, activity rooms and solar bathrooms, and sets up specialized personnel to clean and clear them every day. The bathrooms are sprayed with disinfectant every day; secondly, we care for the health of migrant workers and hold large-scale medical clinics; thirdly, we set up night schools for migrant workers and insist on twice-monthly study and training; fourthly, we formulate and implement the "Measures for the Management of Living Areas of Outside Construction Personnel", "Measures for the Management of Living Wastes", and "Food Hygiene and the Prevention of Food Poisoning Rules"; fifthly, we implement the system of real-name registration for all the migrant workers, and we have the badges, the temporary residence cards and the worker's grade card, to achieve standardization and institutionalization.