Sample work request report

1. Sample work request report

Due to the start of branch line project of Ying County-Zhangjiakou gas pipeline project in ____ and daily inspection tasks, the workload is very huge. The current personnel, vehicles, instruments and equipment in the piping room cannot meet the current inspection tasks and can no longer adapt to existing work needs. Hereby apply to the leader for the purchase of personnel, vehicles, and inspection equipment.

1. In ____, *** received 67 pipeline installation notifications, and 40 notifications were not issued in time. Most of them were caused by the fact that the project had been completed and the construction unit failed to submit completion data in time. Reports cannot be issued in a timely manner. Therefore, I hope that the leaders can develop an effective plan to deal with the above problems.

2. Since the Yingxian-Zhangjiakou gas pipeline project branch project sections were started at the same time in ____, this means that inspections need to be carried out at the same time, and daily inspection tasks cannot be delayed. At present, the pipeline Office 1*** only has 5 inspectors and two inspection vehicles, which cannot be used at the same time, so it is necessary to apply to the office for 2 inspectors and one inspection vehicle.

3. Due to the huge inspection workload, the instruments are used frequently, and there is only one frequently used inspection instrument, such as electrostatic grounding, flange resistance, spark detector, and ultrasonic flaw detector, and the same Time cannot be used in different locations. So I applied to the institute for one of each of the above instruments. Currently, there are only 2 desktop computers in the pipeline room and a lot of reports are issued, which is no longer enough. We hereby apply for 2 desktop computers.

4. Since there are relatively few large-scale pipeline installation projects in Zhangjiakou and lack of practical inspection experience, it is necessary to inspect advanced inspection units to learn from their advanced inspection experience and apply it. At the same time, pipeline ultrasonic testing also requires systematic learning, so personnel should be arranged to learn pipeline ultrasonic testing.

5. Since the establishment of the pipeline laboratory, all inspection records and reports have been compiled by ourselves in accordance with relevant regulations and standards. The format and content of the reports and records are not completely unified. We hope that the leaders will negotiate and unify the reports and records. Format, content.

In order to fully mobilize the enthusiasm of the inspection personnel, conscientiously perform their duties and increase the inspection income of our institute, we have formulated corresponding incentive measures, which not only increases the income within the institute but also improves the welfare benefits of the inspection personnel.

2. Sample work request report

District Education Bureau:

This winter heating period is approaching, and our school is making preparations for winter heating. Except for the heating coal which was not in place due to the school's financial difficulties, all other preparations have been completed. According to the rules of school winter heating in previous years, this year’s school heating requires 50 tons of standard coal. Based on the current market price of 300 yuan per ton, the total amount of funds required is 15,000 yuan. We sincerely hope that the bureau will solve it.

Please comment if it is appropriate or not.

 __School

 _Year_Month_Day

3. Sample work request report

Municipal People's Government:

On April 7 this year, the __ Municipal Party Committee and Municipal Government’s “Decision on Accelerating the Development of Tourism” (No. __ [__] 8) agreed to establish special funds for tourism construction and development, part of which will come from transportation construction The allocation of surcharges will be increased from the original 5% to 10%. In this regard, our committee believes that this measure will undoubtedly help raise funds and promote the development of tourism. However, the original purpose of levying tourism and transportation construction surcharges was mainly to raise subway funds. Now we need to increase the proportion of tourism special funds allocated to transportation construction surcharges, which will inevitably lead to a larger gap in the source of local funds and the need to open up more sources. Source of funding. Therefore, any reduction in raising subway funds will prolong the construction period and increase investment, which is not conducive to project construction.

In view of this, our committee recommends that during the subway construction period, we postpone the increase in the allocation ratio of special tourism funds in transportation construction surcharges, and still implement the ratio of special tourism funds accounting for 5% of transportation construction surcharges. The distribution ratio remains unchanged.

Please give me your approval.

__Municipal Planning Commission

4. Sample work request report

Municipal Development and Reform Commission:

In order to build both qualified and A distinctive higher vocational college, the college has been upgraded to a higher vocational college since it was approved by the provincial government in 2008. Efforts should be made to improve various school conditions.

According to the arrangement of the Provincial Department of Education, our college will conduct an evaluation of the "talent training work of higher vocational colleges" within the year. The results will be used as the main basis for verifying our college's enrollment plan, development scale, professional settings, etc. This will inevitably have a positive impact on our college's have an important impact on survival and development.

With the care and support of the Provincial Forestry Department and the Municipal Government, the institute will continue to work for a long time. Various undertakings have achieved rapid development, and nearly 20,000 professional and technical talents of various types have been trained for the forestry undertakings and regional economic development of our province. However, the existing school land is only 198 acres (including the back mountain forest land), which seriously restricts the development of the college. There is a large gap with the relevant provisions of the National Ministry of Education's "Indicators for Basic School Running Conditions of General Colleges of Higher Education (Trial)". After our college's application, the city's executive meeting decided on 2018-01-06 that 300 acres of land in the vocational school campus of the city's new district will be allocated for a fee, and another 300 acres of land will be controlled as teaching and construction land for our college to build the college's new campus.

The college has fully researched and demonstrated the above. It is planned to invest in the construction of a new campus. The total investment in the construction project is 88.33 million yuan, of which the total investment in the first phase of the campus project is 38.83 million yuan, and the second phase of the project construction will be organized in 2018 with a total investment of 49.5 million yuan. The required construction funds will be financed by loans from financial institutions and other channels. and self-financed solutions. After the first phase of the new campus is completed, the number of full-time students will reach 1,500-__x0. According to the relevant regulations of project construction, I would like to apply to your committee for project approval.

Please reply. Is the above request appropriate?

College

Date

5. Sample work request report

____ Group Company:

Accepted by the Group Entrusted by the company, our company undertook the asset disposal work of ____ Building in July __x2. For more than a year, under the correct instructions of the group company, our company has carefully studied, carefully organized, and made solid progress from top to bottom, overcoming difficulties at all levels, and completed all transfers at a price of...10,000 yuan in July XX At the same time, we overfulfilled the task of withdrawing funds of RMB .

Here, our company formally submits an application, hoping that the group company will give our company a special reward for the ____ Building asset disposal project as an incentive.

Can you please give me your feedback.

Attachment: ____Project Work Report

____Company

____Year__Month__Day