Time flies too fast, the old year is about to finish, I think you should be preparing the annual work summary of the project manager! By constantly thinking and analyzing the past year proactively, you can keep moving forward in the coming year. There is no better way to make their own project manager annual summary of work has a certain depth? After searching and organizing, of I present to you "2022 annual project manager work summary report sample 6", for your reference, I hope to help you.
2022 annual project manager work summary report model 6 (Part I)Over the past year, in the support of the higher leadership and the help of colleagues, I strive to strengthen their own moral character cultivation, so that the ideological and political quality of the staff of my project department continue to improve the management of the work continues to progress, and better to complete the construction of all phases of production tasks. The following is a summary of this year's work:
First, actively take measures to carefully organize and manage
1, further improve the safety and quality of the rules and regulations, improve the management system
Through the years of construction and production of the actual construction, to further improve the safety, quality and other management systems, the establishment of safety and quality Monthly, daily, daily inspection system and rectification system. In addition to the establishment of a full-time safety officer in the project department, each work area has also set up a full-time safety officer at all levels. Raise the safety work to an unprecedented height. Quality, never relax, strengthen the strong construction process control, adhere to the construction quality inspection system, strict implementation of the "self-inspection, mutual inspection, handover inspection" of the three inspection system, so that the quality of the problem in each process operation can be effectively controlled.
2, improve the incentive mechanism, mobilize staff production enthusiasm
By improving the internal contracting mechanism, the development of cyclic incentives and monthly target task assessment awards and other means, greatly improving the staff's enthusiasm for labor, part of the alleviation of the negative impact of financial constraints.
3, improve production efficiency, reduce production costs
By constantly improving the construction process, rationalize the arrangement of personnel, careful organization, careful construction, in the efforts of all employees, construction production continues to improve, efficiency continues to improve.
4, strengthen cost control, strengthen data management, to ensure data authenticity
The project department held a regular cost analysis meeting on the 9th of each month, seriously analyze the problems that existed in the previous month, to find out the shortcomings of the implementation of the layers, and improve the next month, the requirements of the various comparisons to achieve the data, the data must be true and reliable, every link in the construction site, the control of the layers, and every process to do the evidence. In order to ensure the accuracy of the data, to do every shift quality control engineers and foremen for on-site receipt of mutual review and signing, to ensure the authenticity of the data. Into the field of all materials, no matter how late, are signed by the material clerk, to ensure that the full amount of inventory.
5, civilized site construction
Continue to add civilized construction management, according to the actual establishment of the first civilized construction class and the second civilized construction class, the total number of 8 people. Dedicated to civilized site construction related work, to maintain site hygiene and cleanliness, so that the road is clean and smooth, to minimize the impact on the surrounding residents and the environment. All kinds of equipment and materials are well labeled and stacked in an orderly manner.
6, seriously engage in environmental protection, water conservation work
Actively contact with the owner and the local water, water conservation authorities, and take the initiative to invite them to the site inspection, to seek advice, and gradually improve the sewage, water conservation programs, measures.
7, concerned about the lives of employees, thinking about the plight of employees everywhere, into the winter, the weather is cold, try to raise funds as soon as possible to pay wages, bonuses.
Second, timely summary, timely adjustment
The project department regularly organizes safety, quality, environment and water protection and other related aspects of the inspection and summary, summing up the success of the experience and the shortcomings, success to be promoted, insufficient to take measures to prevent recidivism, so that the work of the good cycle in a state of progress.
To quality security, safety and progress, comprehensive and meticulous, humane management, people-oriented, systematic, implementation, everyone attaches importance to safety and quality, everyone to implement safety and quality.
Focus on self-cultivation, and strive to be a good example. The action of the leadership is a silent order, "its body is positive, not order and behavior". Therefore, I will strengthen their own cultivation, and strive to do a good example, as an important way to realize the leadership. First, constantly enrich the knowledge, improve working ability. The second is to conscientiously fulfill the duties of the post, carefully do their jobs. The third is to strictly restrain themselves, and strive to be fair and impartial.
Consciously abide by the rules and regulations, do not engage in specialization, pay attention to hard work and thrift, do not engage in high-consumption entertainment activities. The office conditions are simple, control of luxury and waste. The work of the implementation of the "not to the person", "physical workload assessment" principle.
The above is my experience, in the new year I have to continue to learn new knowledge and new ways to update their knowledge structure, do a project manager to keep up with the times.
2022 annual summary report of the work of the project manager 6 (Part II)In the branch of the leadership of the trust and cultivation, I was appointed in xx in xx months for the project manager has been ten months, in the branch of the strong support and concern for the work of the project department is progressing smoothly, is now nearly a year's work summarized as follows:
a. Work Aspects:
Work, I everywhere to do the responsibility, everywhere strict requirements for themselves, to do the role of the model. Due to the owner's request to enter the field as soon as possible after the holiday, I on January 28 (the fourth day of the first month of the lunar calendar) on the organization of equipment and personnel rushed to the power station to start the work. In the pre-burial stage, the power station is geographically remote, the transportation and communication is extremely inconvenient, which brings a lot of inconvenience to the procurement of power plant materials and power plant installation work. In overcoming the factory equipment defects and incomplete design and construction drawings, I led the project department members to successfully complete the preliminary pre-burial work, and got the owner's affirmation.
Since entering the straight period, due to the delayed delivery of the plant equipment and equipment design, manufacturing defects exist, which brings greater difficulties to the installation work, and cause delays in the installation schedule. In order not to affect the owner's power generation plan, so that the plant equipment defects in a short period of time to be resolved, I organized the project department of the existing human resources, the orderly start of the work: consulting the plant technical experts, the organization of the backbone of the staff research to deal with the problem of the best plan, and make full use of the effective use of time to organize the staff overtime work. With the efforts of all colleagues, the installation of the booster station has been completed, the 1# machine convergence installation, and the 2# machine generator pre-installation has been completed.
Two, project management:
In personnel management, I always adhere to the people-oriented management concept, according to the needs of the work and climatic characteristics, after soliciting a wide range of views, the development of work and rest time: the maximum solution and improve the living, lodging, health care and construction conditions, to solve the staff to worry about, so that we all Full dedication to the work: according to each person's technical level and work characteristics of the construction team with reasonable, give full play to each person's strengths, so as to achieve the purpose of improving work efficiency.
In terms of quality and safety management, set up a full-time safety officer and construction team three inspection system, adhere to the safety first, quality-oriented construction management concept. The lifting of large pieces of equipment, are safe technical briefing, the development of a reliable construction program: all construction personnel into the construction site must be correctly wearing labor protection products, high-altitude work requirements must be fastened with a seat belt: construction power and other sources of danger are set up conspicuous signs. Installation work in strict accordance with the drawings, design documents, construction, work before the technical briefing to ensure the quality of construction.
In terms of construction coordination, and the construction units to get along with each other, and improve the relationship with the owner and supervision units, to solve the problems within the project department, to create a unity, harmony, mutual assistance construction team. And coordinate with the owner in accordance with the construction progress, timely organization of equipment and materials into the field, to do a good job of all kinds of delay information related procedures.
Financial management, strict control of construction costs in all phases, in accordance with the provisions of the company to do a good job of cash flow accounts and general ledger, and financial reimbursement on schedule. In view of the inconvenient transportation situation of the Kesikou power station, try to do less times and more quantities, for auxiliary materials and equipment, tools are managed by a person, to eliminate all kinds of waste phenomenon, so as to achieve the purpose of reducing costs.
Three, learning:
Through nearly 1 year of work, let me y appreciate, as a project manager there are many things to learn, especially in the project overall construction planning is still a lack of experience. Only after mastering a wealth of theoretical knowledge, accumulate rich experience in the installation, in order to be more comfortable in the practical work. I am well aware of their own many shortcomings and the need to improve the place, I will work hard in the future to learn, constantly summarize, and avoid the shortcomings.
2022 annual summary report of the work of the project manager 6 (Part III)20xx year is coming to an end, looking back on the work of the year, under the correct leadership of leaders at all levels, especially in the company and the strong support of the departments, through all the workers of my project department **** with the same efforts to more successfully complete the current year's economic and technical indicators, and is now on the work of the year 20xx to Now on the work of the year 20xx to the leaders report as follows.
1, organization and management
I was transferred to the xxx project department work in early February 20xx, when it was during the Spring Festival, faced with operating losses, lack of personnel and equipment damage and other serious difficulties, leading the project department; first, the equipment for maintenance, adjustments to the track, unqualified roadway rectification; second, the establishment of sound rules and regulations, the project department management Gradually on track; three is the organization of workers into the field, has been into the field of workers to organize learning and training. early March held a staff mobilization meeting, encouraging workers to work together, carry forward the spirit of Ma Wanshui, and the work of the year 20xx made arrangements.
2, construction and production
-- Completed the installation of the 4 # wind well finishing works and a year of operation;
3, operation and management
-- Achieved benefits of about more than 1.2 million yuan. Contained the loss. Renewed the project for the next year;
--The revenue rate of project payment reached 105% (before including the warranty deposit);
Due to the difference in station, the pressure of construction tasks and low contract unit price, the loss in 2012, etc., which led to some disputes between me and the company in coordination and cooperation, I would like to apologize here I would like to apologize. In the future work to pay attention to ways and means, strengthen communication, enhance understanding to the overall situation, for the development of our company and xxxx years of work and work hard.
2022 annual project manager work summary report model 6 (Part IV)Since the beginning of the year, in the company's leadership and the support and help of colleagues, I better complete the work of the year's tasks, has served as a Cheng Yu Plaza bar renovation project, the Flood Prevention Office renovation project, the Evergreen Security Company renovation project, the supervision of Longnan bookstore renovation project and project manager of the renovation of the Hongwei Park,. Now the work is briefly summarized as follows.
1, strengthen learning, improve their own quality. As a new recruit in the decoration industry, I know that my professional knowledge and business quality are far from the company's requirements. Therefore, I focus on the daily work of the decorative industry and the knowledge of the study, has read and studied the "decorative construction manual", "engineering acceptance standards" and "project manager management manual" and other books. While learning from books, I also humbly learn from colleagues around the high level of business, so that I do not know how to ask, accumulation, step by step, and gradually improve their theoretical and business level, and now basically able to adapt to the requirements of the work.
2, extensive publicity, set up the company's image. I work with their own extensive contact with the outside world, the advantages of each site, I have to the leadership of the A party and the surrounding staff to introduce the company's strength, quality of personnel, the company's performance and the company's development trend, as far as possible, so that they can have a comprehensive understanding of the company, and at the same time, to obtain their trust, the establishment of a long-term contact, and vigorously promote the smooth progress of the work. As a project manager, I started from strict self-discipline, asking subordinates and construction workers to pay attention to their own image at all times, reminding them that everyone's words and deeds represent the company, and that they can't win their personal interests at the expense of the company's interests, and that even if they are aggrieved, they have to be patient and can't bump into the A party. Through a series of work, the company's good image is maintained, leaving a deep impression on customers.
3, improve the system, strengthened construction management. There are no rules, not a circle, for the magnificent park site system is not perfect, the management of the actual loose, I have developed after careful investigation and research, "morning meeting system", "rewards and punishments system" and "material management system", standardize the site order. Iron still needs its own hard, I always adhere to the requirements of others to do, they should be the first to do, and to do better, for example, every day I come to the site in advance according to the work time, the first comprehensive inspection once for the discovery of this information belongs to the moon boat is strictly prohibited from copying plagiarized problems, in the morning meeting to make timely and appropriate arrangements and deal with the next step in the work provides the time and space to build up their own credibility. The work of the good performance of the personnel, I have praised and rewarded, do not meet the norms, and repeat offenders, resolutely punished, refused to anyone to intercede, thus prompting the workers to develop good working habits, consciously abide by the rules and regulations, improve the standard of work, and comprehensively complete their own work tasks.
4, in-depth coordination, advancing the work process. In just entered the magnificent park site, a lot of affairs and relations are not straightened out, bringing great difficulty to the work. I first started from the coordination of the relationship with the A party, a comprehensive coordination work. In order to solve the problem that the drawings did not match with the actual situation on site, and there was no color steel plate, water supply detailed drawing, air conditioning circuit, exhaust vent and other sub-engineering drawings, I repeatedly negotiated with the Design Department, and moved by my sincerity, they finally agreed to change the original design by our company, and then reported to the Party for approval, and after a careful work on the Party, the Design Department finally signed the changed drawings to make the new drawings to be implemented. The new drawings were implemented. Party A on our procurement of floor tiles, wall tiles and other materials to intervene a lot, the requirements must be in accordance with the budget price of procurement, and then after a number of positive coordination, Party A made great concessions for the company to win the difference in profit; at first the supervisory side of the very strict requirements, the provisions of each incoming materials to the Daqing testing station for the second inspection, electricians and other special types of work to have a certificate of competency, and to provide us with the qualification of the subcontracting. In the face of these problems, I always do not affect the progress and quality of the project for the purpose of coordinating efforts, these problems are solved, to avoid a lot of unnecessary trouble, but also with the supervision party to enhance the feelings, give us a lot of support, such as: take the initiative to help us plan the water, electricity changes, which places can be reduced, reduce the work, which changes in our favor, and so on, and to help us to make the internal data. So that we save money nearly 10,000 yuan, such as cable tray according to the design to reduce the 60, width reduced by 50mm, closed door on the bright channel steel to reduce by half, the facade of the horizontal gray bar to reduce by half, the original 12 pairs of solid wood door to the fire door.
Although the work has made certain achievements, but at the same time also found some problems. First, the company's management system is not sound, especially in the field management of the project appears to be very lack of; Second, the staff's authority is unclear, resulting in some shirking phenomenon; Third, specific staff sometimes comprehend the general manager's intentions, delaying the work; Fourth, the company undertakes large-scale projects, the pre-production plan is not comprehensive, not detailed on the profit, construction program, infrastructure investment, the consideration of the still incomplete, the work is sometimes caught unprepared. Work sometimes caught off guard. For the actual situation of the company, I have the following suggestions: First, the establishment of a sound company's management system and constitution, clear job responsibilities of the staff, and really do have a chapter to follow when the problem arises; Secondly, the treatment of large-scale projects, we must analyze the difficulties and problems that may arise to make a few sets of foresight, detailed work program, the right remedy to ensure that the company is invincible; Thirdly, the sound project team management personnel. Project safety officer, construction workers, materials, custodians and many other positions can not be compressed, these people can be part-time, but must be competent, although on the surface of the cost increase, but the quality of the project improved, the company will have a reputation, security guarantees, the company has the greatest benefit.
2022 annual summary report of the work of the project manager 6 (Part V)Time flies, time like a shuttle, winking 20xx year has passed. Without realizing it, the New Year is also over. Only 7 days of vacation, too short too short, not enough rest. The annual summary has not yet begun to write, the New Year is over. Well, the following words back to the main story, summarize the 20xx year, this year I have done something.
First, what did
20xx November to join the new company, but also try to do a brand new position: software project manager (pure management). I used to be mainly engaged in technical management work, and now I am engaged in project manager work. 20xx end of the year into the company, the company gave me a small project A (MIS system developed in Java), so that I can adapt to the first, this project is an internal project, the business is relatively simple, and there is no use of any new technology, the leader of the instructions to me is to let go of Agile development Agile approach to management! This project is an internal project, the business is relatively simple, there is no new technology, the leadership instructions to me is to let go of Agile development Agile method to manage the project, as a test bed for Agile. I'm not sure if I'm going to be able to do that, but I'm going to be able to do it in a way that I'm not going to be able to do it.
Then came my "nightmare", the company developed a new product line, cloud computing. The leader talked to me and asked me to finish all the cases I was working on, and then devote myself to the cloud computing product line. There are a lot of projects under this product line, and there are four projects running at present, three of which are under my responsibility and the other one is under the responsibility of one of my colleagues. It's my "nightmare", but it's also a challenge for me, because cloud computing projects are very technical, with relatively few business aspects. So it was a big challenge for me as a technical layman. Secondly, the technology of cloud computing is also relatively cutting-edge, and the number of pending/unresolved issues is particularly high, so I will encounter a lot of obstacles in the process of development. Again, it's a challenge for me to work on three projects at the same time when I used to work on only one. But I am also very happy to have such an opportunity to accept the challenge, without which there will be no progress.
Second, the harvest
1, completed a big transition in my life, from the technical position to the successful transition to the management position.
2, participated in the PMP examination, and once through, obtained the PMP certificate.
Third, shortcomings
1, although the project are stumbling through the completion of the case. But always feel that there are a lot of shortcomings, can be improved. The end of the project is too hasty, there is not much time to think, to summarize the experience and stick to it, off and on, always say there is no time.
2, spare time is not grasping, too playful.
3, come to the new company more than 1 year, there is no pay raise, a little disappointed.
2022 annual summary report of the work of the project manager 6 (Part VI)First, the measures taken actively, carefully organized, carefully managed
1, to further improve the safety and quality of the rules and regulations, and improve the management system
Through the years of construction and production of the actual construction, to further improve the safety and quality of other Management system, the establishment of safety and quality of monthly, ten-day inspection, daily inspection system and rectification system. In addition to the establishment of a full-time safety officer in the project department, each work area has also set up a full-time safety officer at all levels. Raise the safety work to an unprecedented height. Quality, never relax, strengthen the strong construction process control, adhere to the construction quality inspection system, strict implementation of the "self-inspection, mutual inspection, handover inspection" of the three inspection system, so that the quality of the problem in each process operation can be effectively controlled.
2, improve the incentive mechanism, mobilize staff production enthusiasm
By improving the internal contracting mechanism, the development of cyclic incentives and monthly target task assessment awards and other means, greatly improving the staff's enthusiasm for labor, part of the alleviation of the negative impact of financial constraints.
3, improve production efficiency, reduce production costs
By constantly improving the construction process, rationalize the arrangement of personnel, careful organization, careful construction, in the efforts of all employees, the construction output continues to improve, the efficiency of continuous improvement.
4, strengthen cost control, strengthen data management, to ensure data authenticity
The project department held a regular cost analysis meeting on the 9th of each month, seriously analyze the problems that existed in the previous month, to find out the shortcomings of the implementation of the layers, and improve the next month, the requirements of the various comparisons to achieve the data, the data must be true and reliable, every link in the construction site, the control of the layers, and each process to do the evidence. In order to ensure the accuracy of the data, to do every shift quality control engineers and foremen for on-site receipt of mutual review and signing, to ensure the authenticity of the data. Into the field of all materials, no matter how late, are signed by the material clerk, to ensure that the full amount of inventory.
5, civilized site construction
Continue to add civilized construction management, according to the actual establishment of the first civilized construction class and the second civilized construction class, the total number of 8 people. Dedicated to civilized site construction related work, to maintain site hygiene and cleanliness, so that the road is clean and smooth, to minimize the impact on the surrounding residents and the environment. All kinds of equipment and materials are well labeled and stacked in an orderly manner.
6, seriously engage in environmental protection, water conservation work
Actively contact with the owner and the local water, water conservation authorities, and take the initiative to invite them to the site inspection, to seek advice, and gradually improve the sewage, water conservation programs, measures.
7, care for the lives of employees, everywhere thinking about the plight of employees
Into the winter, the weather is cold, try to raise funds as soon as possible to pay wages, bonuses.
Second, timely summary, timely adjustment
The project department regularly organizes safety, quality, environment and water protection and other related aspects of the inspection and summary, summing up the success of the experience and the shortcomings, success to be promoted, insufficient to take measures to prevent recidivism, so that the work of a good cycle of state forward.
To quality security, safety and progress, comprehensive and detailed, humanized management, people-oriented, system, implementation, everyone attaches importance to safety and quality, everyone to implement safety and quality.
Third, focus on their own cultivation, and strive to be a good example.
The action of the leadership is a silent order, "its body is positive, not order and behavior". Therefore, I put to strengthen their own cultivation, and strive to do a good example, as an important way to realize the leadership.
First, constantly enrich the knowledge, improve the ability to work.
The second is to conscientiously fulfill the duties of the post, carefully do their jobs.
The third is to strictly restrain themselves, and strive to be fair and just.
Consciously abide by the rules and regulations, do not engage in specialization, pay attention to hard work and thrift, do not engage in high-consumption entertainment activities. The office conditions are simple, control of luxury and waste. In the work of the implementation of the "not to the person", "physical workload assessment" principle.
In short, last year is our harvest year, in the leadership at all levels of great concern and support, our Department of carefully organized and rational arrangements, to overcome the tight schedule, heavy task, the appearance of the quality requirements of a variety of unfavorable factors, in strict accordance with the design drawings, technical requirements for the construction and construction of the relevant procedures and norms for construction, quality and quantity to complete the construction of the project. The construction was done without any safety and quality accidents. At the same time, the owner, design and general contracting, quality supervision station and supervision unit of the construction of my project department/gave a lot of help and guidance, here we express our most sincere thanks! We will also work harder and more seriously to complete the follow-up work of the project.