What costs are included in the unit price measure item cost?
03 Specification General Measures Item List includes:\x0d\1.Environmental Protection\x0d\2.Civilized Construction\x0d\3.Safe Construction\x0d\4.Temporary Construction\x0d\5.Night-time Moving\x0d\6.Secondary Moving\x0d\7.Large-scale Machinery and Equipment Entry, Exit and Dismantling\x0d\8.Concrete, Reinforced Concrete Formwork and Brackets\x0d\9. Scaffolding\x0d\10. Protection of Played Works and Equipment\x0d\11. Construction Drainage, Precipitation\x0d\\x0d\08 Specification The list of General Measures Items include\x0d\1.Safety and Civilization Construction Costs\x0d\2.Night Work\x0d\3.Secondary Handling\x0d\4.Winter and Rainy Season Construction\x0d\5.Large Scale Machinery Entry, Exit, and Installation and Dismantling\x0d\4.Construction Drainage\x0d\5. 6. Construction Drainage\x0d\7. Construction Precipitation\x0d\8. Temporary Protection Facilities for Above and Below Ground Facilities and Buildings\x0d\9. Protection of Completed Works and Equipment.