A lot of famous masters of life resume with us as ordinary, but why they can become a master, only because they know how to summarize, in the process of summarizing to find good, avoid bad, every day in progress. The following is a few pieces of factory machinery and equipment maintenance workers personal work summary, for your reference.
Factory machinery and equipment maintenance worker personal work summary 1
20 years of the equipment department's work is nearly over, looking back at the past year, in the department manager and supervisor of the guidance of the help of my business skills by leaps and bounds, at the same time in the manager and supervisor of the direct leadership of the work carried out is also relatively smooth as the Department of equipment. As a device first improve their skills to work better, in order to make their skills more on a ladder, now summarize the work of individuals over the year in order to better carry out next year's work.
A daily inspection
In the face of 24-hour non-stop operation of the equipment, only to strengthen the inspection in order to better understand the health of the equipment, the failure of the hidden danger will occur in advance to remove, in order to prevent the problem before it occurs. I go to work every day to carry out the work before, will patrol the paint line of each wind machine operation, check the fan motor and the machine shaft has no abnormal noise, fixed seat and bolts have no loose off; check the EN into the wind system heat exchanger has no cracks leakage phenomenon; check the water cooler work with or without alarms; check the incinerator gas pressure, water pressure, the working temperature is normal, the motor noise; check the dewatering machine pressure difference is within the range, with or without alarms (the). range, there is no alarm (if there is an alarm according to the fault resolution); check the dehydration area of the motor is running normally (now dehydration area of a motor running abnormally I have been monitoring); check whether the chain line is running normally; check the air pressure room within the four air compressors and two dryers pressure, temperature and operation of the work; check the steam room, the softened water room, water temperature, water pressure and check the operation of the motor Check the operation of water temperature and pressure in the steam room and water softening room, and check whether the motor and water pump are running normally. After the whole process of spraying line equipment inspection so that I always grasp the operating conditions of each piece of equipment, and according to the actual situation of each piece of equipment to carry out maintenance work, so as to extend the service life of the equipment, reduce production and maintenance costs, and ultimately maximize the efficiency of the enterprise.
Second, equipment operation and maintenance records
In addition to the inspection of equipment, I also advocate good interaction between equipment maintenance personnel and production operators, and strive to achieve the early discovery of equipment defects, timely overhaul, and fully understand the temperament and foci of each piece of equipment, in order to facilitate rapid, predictive equipment maintenance work, and focus on tracking of wearable and consumable parts and spare parts inventory. The various refueling points of the equipment to do periodic lubrication work, so as not to cause wear and tear because of poor lubrication equipment and increase the failure rate. I not only check the exhaust fan of each spray booth of the spraying line every day, but also monitor the temperature of the shaft and motor of the fan with infrared thermometer regularly and form a record. In addition, I keep records and inventory of all bearings, belts, plumbing fittings, filters, pump seals, and other commonly used items in the spray line so that they can be replaced in a timely manner. Also with the departmental leadership to produce equipment operating instructions, maintenance procedures, equipment operation, inspection and maintenance records.
Three equipment maintenance
For the company's normal production when I found the hidden faults if they can be resolved in a timely manner have been eliminated in time, some need to stop the line to solve the first write down and in the first time to eliminate the solution to the manager and supervisor to ask for advice, for example, in the middle of the year on my usual monitoring of the spray booth exhaust fan vibration in the manager's leadership of all fans, and after correcting the balance of the fault hidden. Did correct the balance after the failure of the hidden trouble to solve. For the phenomenon of high conductivity of reverse osmosis equipment, I strengthen the observation and increase the number of cleaning, and replaced the security filter cartridge effect is obvious. Every time I stop the line will be spraying line chain equipment, air intake equipment, exhaust equipment, various circulating pumps, as well as air compressors, dryers, dewatering machines, cooling machines, incinerators, scraper, lithium bromide equipment, 2TDI system, 3TDI system, hot water recycling system comprehensive maintenance, to ensure that the equipment belonging to the 24-hour operation of the whole year with a low failure rate of operation.
Four skill enhancement
I think that if you want to do a good job, you have to make the best of it, and if you want to make the best of it, you have to make the best of it. Each of our equipment repairman only strictly strengthen the equipment management and maintenance work, change the passive situation of equipment maintenance, in order to make the production of normal operation. After nearly two years of equipment maintenance work, in the manager and supervisor of the careful and attentive training, my skills and into the factory compared to a sea change, they also use books and network query of the equipment belonging to the relevant information, as much as possible to understand and master their performance, safety regulations and maintenance and so on. At the same time, he also strengthened the study of electricians, and strive to make themselves in the mechanical and electrical maintenance field can be unique.
Five need to improve the aspects
Through the improvement of their own maintenance level, and strive to save money on equipment maintenance costs, such as the expensive part of the damage has been broken down Repair to make the repair work detailed to the components to narrow the scope of the failure to the lowest cost of repair equipment to avoid the direct replacement of new spare parts. Reduce the number of external repair of equipment and increase internal repair efforts. For equipment repair, through the change of maintenance frequency to ensure that the use of equipment performance, to reduce the failure of downtime.
In summary, as the company's equipment department equipment, they have the responsibility and confidence to continue to strengthen learning, improve their own maintenance skills, around the company's annual goals, pragmatic and active work, fully cooperate with the direct leadership and the production sector, at the same time, to strengthen the cooperation between colleagues to improve the ability to collaborate with each other, so that the classroom department more united, more combat effectiveness, in the future work! In the future work I believe I have the ability and confidence in the department manager under the leadership of the courage to face the difficulties, meet the challenges, and constantly improve themselves, and in the new year to move forward!
Factory machinery and equipment maintenance worker personal work summary 2
Looking back on the work of the year, the Department of Operations and Maintenance of the company's leadership under the correct leadership of the leadership of the various departments of the mutual support to safe production as the basis for the overall conversion to match the overall digital television as the main task to the user satisfaction as the goal of the Department of Operations and Maintenance of the whole year to ensure that the work of the work Smooth development.
First, the national trunk, provincial trunk line maintenance
1, the national trunk provincial trunk, sdh transmission equipment, equipment power supply, private network equipment for regular dust, maintenance, to ensure the normal operation of the trunk line, to achieve safe and trouble-free transmission.
2, on the national trunk, provincial trunk transmission section of the machine room air conditioning maintenance, overhaul, to ensure the normal operation of the equipment, to avoid the occurrence of alarms due to the temperature of the room over the limit.
3, the transmission room power supply and front-end machine ups power supply regularly discharge test.
4, installation and commissioning of provincial trunk osn equipment, complete the trunk wave division equipment installation survey and interactive TV front-end equipment survey.
Second, the room daily maintenance
1, daily maintenance work: in accordance with the provisions of the room on duty, do a good job in the room on duty, on time to the provincial company to report to the room equipment operation and power supply room, in accordance with the actual situation in the room, truthfully fill out the room on duty logs, weekly measurements of rectifier cabinets, batteries, and the output of the DC switchboard cabinet, weekly cleanup of the equipment dust and equipment Clean the dust of equipment and dust net every week, and overhaul the generator to ensure emergency power supply. Strictly in accordance with the city company's machine room scheduling instructions and the General Administration of the warning display system prompts, start the safety broadcast emergency plan, do a good job on sensitive days, the National Day and the Asian Games and other major broadcasting during the safety of broadcasting work, the whole year safety broadcast normal.
2, the program transmission is normal: the front-end reception signal is normal, back to the program is normal. No anomalies were found throughout the year. On December 7, the December 9 of the three consecutive days of the digital system signal instability, in time to contact the provincial company's Operations and Maintenance Department, confirmed that the signal failure for the provincial company's front-end server room signal receiving system by the unknown interference, the current failure has been eliminated.
3, the maintenance of the room to do a good job in the maintenance reports, line maintenance reports, digital TV signal parameters report, trunk fiber test report, digital TV front-end equipment maintenance reports, line cutting reports and other monthly and quarterly reports to fill in the report, and in the 20th of each month before the report will be reported to the company in Baoji.
4, according to the operation and maintenance operation specification of the operation and regulation department of the provincial company, test the trunk fiber in the direction of Baoji and Xianyang on time, and report the test results to the operation and regulation department on time.
5, timely handling of front-end equipment room of various equipment failures, the year to replace the satellite receiver 3, replace the modulator does not work properly 5, repair qam modulator fan failure of 18, dealing with digital TV front-end room failure qam modulator and multiplexer failure.
6, the front-end machine room of the optical platform transformation, due to the network reform of the initial optical platform to analog plus digital platform-based, with the overall conversion of digital television to promote pure digital joints increased, the original pure digital optical platform can not meet the needs. In order to transform to a purely digital-based optical platform, from the front-end machine room to adjust the equipment configuration of the optical platform, the adjustment process, *** involved 219 optical nodes of the signal, due to changes in optical signal strength of the optical nodes caused by changes in the output parameters of the optical receiver, the timely adjustment of each optical node signal one by one to ensure the normal transmission of signals.
Third, line maintenance
1, the region's optical cable network of technical information to improve the organization, due to line reconstruction caused by the cable cut information in a timely manner to change.
2, all the tests of the region's optical point of test, improve the technical parameters, test the optical nodes of the optical signal strength, optical receivers of the signal output power of each channel.
3, cable trunk line transformation work. In order to cooperate with the overall conversion of digital television work, the Park Road, Park District, Pengjayao Village, the cable network re-engineering; Li Taiwan Township Government joints to the College of Forestry Optical Interchange box, horse farms in the community, Yao Nan Village to the East Interchange, the village of Hu Xinzhuang and other fiber optic cable line transformation. Comprehensive **** counting the transformation of optical lines 17km, transforming the length of cable lines 8.6km, the new cable lines 8.3km, repairing the optical cable lines 6.
The region throughout the year in the operation and maintenance of a lot of work, timely handling of user complaints and maintenance work, but also with the Ministry of Marketing to do a good job of the overall conversion of digital TV; with the Ministry of Engineering to do a good job of the new district of the optical node signal to open the work.
Fourth, the user service
As the region's network has been achieved fiber to the building, the failure of the network has decreased significantly, with the completion of the overall conversion of digital television, digital television users to increase the number of users, the user's household maintenance work has increased significantly, the average daily maintenance in the 30-50 or so, the main user repair is the user's household to change the line of the signal caused by the parameters of the standard, the set-top box installation can not be properly received, the signal parameters of the user's household. Set-top box installation can not be normal viewing, repair this failure is more time-consuming, due to the increase in this failure, at the same time, because the user will not use the set-top box generated by the repair business has also increased dramatically, resulting in a large number of installations and open accounts of the construction of the single backlog.
20 annual work ideas
First, the national trunk, the provincial trunk, transmission room, cable TV room, according to the requirements of the provincial company, do a good job of routine maintenance.
Second, strengthen the maintenance of the line and safety management.
First of all, to ensure that the branch and trunk lines of the safe delivery, strengthen the management of cable TV security transmission, maintenance of network security, to do the five diligence: "diligent inspection, diligent visits, diligent patrol, diligent reflection, diligent communication". For the emergence of emergencies, report within the first hour, repair personnel should be timely maintenance. Ensure the safety of the region's signal delivery, so that the quality of cable television signal is always in good condition.
Third, the user service: user first, attentive service, improve maintenance efficiency. Our operation and maintenance department of each person we have to change the previous ideological concepts, should be based on the present, recognize the current situation, the face of the market, good service, with our technology to find the user, with our
our quality to get the user, with our service to retain the user, so that with our image to consolidate the market.
Our service to do a good job, the signal quality has improved, and the user to do a real heart to heart, get the user's trust, then we next year, the user's complaints will be slowly reduced.
I believe that only by our feet on the ground, pay close attention to the implementation, play strong struggle, 20 years of the task will be successfully completed.
Factory machinery and equipment maintenance workers personal work summary 3
I am a city of telecommunications staff, I joined the company at the beginning of this year, the company's first I am not particularly aware of a number of things, in the leadership and colleagues to help guide, as well as my own efforts, I am by a workplace whites, transformed into a professional maintenance staff. Whether it is in the spirit of dedication to the work and the state of mind, I have had a great promotion, and in the business ability to enhance a lot of it.
Looking back at the Division of a year's work, not only in the business has made great gains, I also know a lot of mentors and friends, in their bodies I learned a lot of experience, although a year's learning I enhance a lot, but in some areas there are still many deficiencies in 14 years is about to go by, and now I have a summary of their year's work and learning situation.
From the beginning of the Division of the workplace white to today's professional maintenance staff, in this year's time I have learned a lot, for example, the maintenance staff's work attitude and responsibility, are I need to learn, like our usual work, every day to the room temperature, humidity, and other indicators of the record, check, and so on. There is also the equipment circuit whether the normal operation of the test, etc., and sometimes also need to simply deal with some professional complaints, so that the equipment can run normally, all of which must require us to have the ultimate patience and care.
After doing more than half a year of primary work and business various professional expertise familiar with some of their own choice to become an operations and maintenance personnel, so that the operation and maintenance of learning will be more thorough. Always to do a good job of equipment maintenance, to ensure that the network safe and reliable operation of the theme, timely detection of fault points, quickly deal with the fault, so that the network runs effectively and smoothly. In this 1 year of work and study, I learned a lot of technical and business knowledge, and colleagues to cooperate more tacit understanding, from their bodies I learned a lot of professional knowledge and human reasoning, but also very fortunate in the just on the road when they are accompanied by, I believe that in the future on the road to work will make better results.
In this nearly a year of learning, work, I found myself from a professional operation and maintenance personnel or a certain gap, including in the work of skills, habits, thinking and professional knowledge is not particularly mature, these are the future need to work in the work of the efforts and improve the aspects of the detailed reflection on their own in this year there are a good number of aspects of the work is not particularly good.
1, the work is not refined enough, each time I found their own shortcomings should be corrected in a timely manner and summarize, to avoid similar errors in the future, the transmission of professional equipment, resources, understanding is not too thorough, to use the surrounding people and resources to improve their ability to work.
2, the work is not flexible enough, usually lack of communication with colleagues, do things to prioritize, grasp the main contradictions, delineate the boundaries of what is the essence of the work, which is to help, which is necessary to do, to think clearly. How to communicate with other departments, how to communicate with the department staff, how to communicate with the user, these are the future need to focus on communication and learning.
In the future life and learning, must always pay attention to their own shortcomings, in the usual time to develop good habits, so that in the work can be able to handle, learn more professional skills for their own charging, so that their own growth as soon as possible, so that they become more professional, and strive for the development of the Division of their own force.
Factory machinery and equipment maintenance workers personal work summary 4
The month is coming to an end, we turned back from the maintenance of internship positions on the official position has been three weeks, in this period of time to learn a lot of things. Now the month of individual work is summarized as follows:
First of all, we follow the old staff to take turns to learn the work they are responsible for, learning to report the library, price adjustment, batch payment, etc., to understand the specific work of our department, and independently operated for a period of time.
Secondly, I took back the Sony Ericsson sales analysis of this previously done work, looking at the Sony Ericsson sales analysis table again, feel both familiar and unfamiliar. Familiar because it has been tracking the data analysis, each business hall of each model is so familiar; strange because a month did not touch the table all of a sudden added a lot of new charts and indicators. Therefore, to take over this work also have to be careful to understand the changes in each of the indicators, changes in the formula, which found some problems also have to be corrected in a timely manner, until you are sure that each form and the formula inside are correct, and then fill in this period of time to the vacant data. Finally, the form to catch up with the current time schedule, this time a strong sense that the form needs to be constantly improved, the work method also needs to be constantly improved. How to use the existing tools to improve the efficiency of the work has become a topic worthy of study. With the system or with access to obtain data? With ecel or powerpoint to do analysis presentation? An excellent analysis of the report should not only consider its practicality, but also consider its beauty, to make full use of these tools to achieve the efficiency and beauty of the coexistence of the effect, but also need to spend more time to learn how to use these software flexibility.
Again, after following up on Sony Ericsson's sales analysis, I took over Tianyi's sales analysis, re-established an analysis template, spent a day setting up all the links, and corrected the formulas for all the indicators, and a new brand analysis workbook was born. When I spent a morning linking all the data sources of hundreds of charts, I really felt that the word "once and for all" was so appropriate for this step. At the same time also thought, if a link to get it wrong, then the whole analysis of the results of the authenticity of the destruction of the workbook is the basis of the analysis and the basis of the foundation, the foundation is crooked, that the whole house has to collapse, so, do the analysis of the work of the plan is not sloppy, careful thought is never missing.
Since the takeover, I began to pay attention to the national brand points out of the field, from the web page to browse a lot of domestic cell phone brands in the development of the situation, as well as access to the information of many of the best-selling models. Low price, rich features, fresh appearance, less than 2% of the repair rate, these highlights make Tianyin in the domestic brands to stand out, become a new force of domestic attention. Now Tianyue also joined our distribution ranks, brand growth, sales expansion, which not only brings us a lot of profit, but also brings us a revelation? Do your own brand, hopefully in front!
Today received the task, ready to start doing another national brand? Lenovo's sales analysis, I believe that with the foundation of Sony Ericsson and Tianyue, it is not difficult to complete the analysis of Lenovo. Each brand has its own characteristics, responsible for the analysis of more and more brands, then the understanding of different brands will be more and more, and then the development of the cell phone market will have a better understanding, so I'm very happy to accept the sales analysis of these three brands task.
The above is a summary report of the individual work, and finally, began to learn to do stocking plans, this work requires mastery of forecasting sales and inventory control skills, in order to better meet the arrival of September and the "Eleventh" Golden Week, we must complete this new task, I hope to learn from more useful things.
Maintenance work summary related articles :
1. maintenance worker year-end work summary 9 minutes
2. 2019 maintenance year-end work summary sample
3. repair individual work summary sample 4
4. maintenance individual first half of the year work summary
5. comprehensive maintenance first half of the year work summary example
4. maintenance individual work summary
5. comprehensive maintenance first half of the year work summary sample
<