Maintenance record form emergency repair record form

how to file the rescue vehicle?

1. Make a written application for car purchase.

2. fill in the "application form for ambulance allocation in medical and health institutions".

3. fill in the "application form for new ambulance".

4. Fill in the "Request for Instructions on Application for Installation of Special Vehicle Warning Lights and Alarms for Ambulance Vehicles".

to sum up, there are three written applications and one application form.

other procedures are carried out according to the normal licensing. I hope everyone can help.

Who is the heating supervisor in the residential area looking for?

generally speaking, find a property management company. If the community is managed by a property company, find a property company. The main heating pipeline belongs to public facilities, so it is ok to find a property. If there is no property management in the old community, you can directly find the heating company.

What does it mean to repair the phone?

It means to deal with more urgent emergencies. It means the telephone number for emergency repair. Generally speaking, you can call this kind of emergency call when you encounter danger or machine failure.

the 24-hour emergency telephone number is 95598, and this hotline accepts 24-hour consultation and inquiry business, fault repair business, cable installation business, complaints, reports, opinions and suggestions from electricity users.

can the communication emergency repair vehicle be equipped with a yellow warning light? Do I need to apply?

Yes, the traffic control department and relevant departments have applied that the orange and yellow warning lights are for emergency vehicles. It is suggested to install long-line warning lights, alarm devices, and tone-off (engineering tone). In case of emergency, turn on the alarm and warning lights to enjoy special vehicle rights.

approval process for filling stations?

1. Project establishment

We need to carry out project establishment examination and approval in the early stage of p>LNG filling station and gasification station construction, and we need to prepare Project Establishment Application Form and Project Proposal to go to the local, municipal (county) development and reform commission for project establishment examination and approval. After the approval, you will get the Reply on the Proposal of xx Project or the Reply on Agreeing to XX Co., Ltd..

2. feasibility study report review

it is necessary to prepare the feasibility study report and the application report of the unit for feasibility study report review, and the review opinions of the local and regional development and reform commissions. Submitted to the audit committee.

3. Planning permission for construction land

The Project Approval, Station Planning Plan and Address Exploration Report need to be prepared and sent to: Planning Section of the Construction Committee, Planning and Design Institute and Exploration and Design Institute

to obtain the Planning Permit for Construction Land after approval.

4. Fire control review

It is necessary to prepare the Design of Station Area and the Approval Document of Development and Reform Commission, and send them to the Public Security Fire Bureau for approval. After the examination and approval, obtain the Opinions on Examination and Approval of Fire Protection Design.

5. Evaluation of preliminary design of the station area (EIA)

It is necessary to prepare the EIA Report, Preliminary Design Scheme and Preliminary Design Scheme Approval Letter, and send them to the local qualified environmental evaluation unit, and obtain the EIA Reply Opinion after the approval.

6. Safety assessment (safety assessment)

It is necessary to prepare the Design Plan of Station Area and the Safety Assessment Report and submit them to the local Safety Supervision Bureau for approval, and obtain the Reply or Opinion of Safety Assessment after the approval

7. To determine the site, it is necessary to prepare the Planning Permit for Construction Land and the Design Plan of Station Area for approval (Planning Section of Construction Bureau).

8. Construction project planning permit

It is necessary to prepare Land Red Line Map, Station Area Construction Drawing, Construction Drawing Planning Review Opinion and Construction Project Planning Approval Form to the Planning Administration for approval. After the approval, it is necessary to obtain the Construction Project Permit

9. For the approval of gas project construction, it is necessary to prepare the Business License and other documents required by the local gas office. Go to the regional gas office or the special equipment section of the Bureau of Quality and Technical Supervision to inform. Obtaining the Construction Permit of Construction Project

11. Completion acceptance of the station area

One original and three copies of Completion Data and Acceptance Report need to be prepared and sent to the local construction committee, technical supervision bureau and regional gas office. Obtaining the Opinions on Qualification of Gas Station Construction

12. Relevant completion materials need to be prepared for fire control acceptance

. Report to the local public security fire station and obtain the fire control acceptance certificate

13. Fire control safety

It is necessary to prepare the fire control acceptance certificate and report it to the public security fire station, and obtain the fire control safety license for inflammable and explosive dangerous goods

14. Dangerous goods management

It is necessary to prepare the Emergency Plan for Hazardous Chemical Accidents, the Hazardous Chemical Safety Management System and the copy of the Transport Agreement signed with the transport unit. Obtain the Dangerous Goods Business License

15. Pressure vessels

need to prepare relevant drawings and materials and the Pressure Vessel Use Certificate to the Bureau of Quality and Technical Supervision for approval. Handling the pressure vessel registration certificate

16. gas business license

requires preparation: application for gas business license, description of enterprise articles of association and enterprise capital structure, identity certificates of persons in charge of the enterprise, operation, maintenance and emergency repair, professional training and assessment certificates of employees, property rights certificates of fixed business premises, completion acceptance report and filing documents of gas facilities construction projects, specific plans for the enterprise to implement gas development planning, and gas source certificate: temperament test report. The gas supply contract or letter of intent signed with the gas supply enterprise, perfect safety management system and sound business plan materials, emergency plan for safety accidents, and safety evaluation report. Send it to the Construction Committee, regional gas office and provincial gas office. Finally, the "Gas Business License" was obtained.

Extended information:

The gas filling station is used when vehicles need to replenish LPG. LPG is stored in the gas storage, connected to the gas filling machine through the pipeline, and added to the gas box of the vehicle through the gas filling gun.

gas filling stations are sometimes attached to gas stations, providing both gas filling and filling services.