Preliminary Plan for Safe Work in Guinea Project

(Economic Development Division, Geological Research Institute)

I. Guinea Project Overview

Cooperative Party (Party A): XXXXXXXXXX. project name: XXXXXXXXXXXX. the contractual work period is 1 year. The content of the work includes; study of iron ore mine control law, geological mapping, physical survey, topographic survey and drilling and coring, etc. The project is expected to be completed by the end of this year.

II. Production Safety Network and Production Safety Responsibilities

(I) Production Safety Network

1. Project Production Safety Leadership Group:

Leader: XXXX

Members: XXX, XXX.

2. Person in Charge of Production Safety of the Project: XXX (Project Manager)

Safety Officers: XXX, XXX, XXX, XXX.

3. Project Team Production Safety Officer and Part-time Safety Officer

Geological Survey Team Leader:XXX

Logistics Team Leader: XXX

Physical Survey Team Leader: XXX,

Topographical Survey Team Leader: XXX

Drilling Team Leader: XXX

< p>Part-time safety officers: XXX (geology team), XXX, XXX, XXX, XXX, XXX

(2) Responsibilities for production safety

1. Safety responsibilities of the responsible person of the enterprise

(1) The responsible person of the enterprise is the first person responsible for safety, and he is responsible for the establishment of the project department's leading group of production safety and is responsible for the education of production safety to the personnel of the project, and for formulating the implementation rules of production safety management;

(2) The responsible person of the enterprise is the first person responsible for safety. Safety production management implementation rules;

(2) organizing the project safety management network, equipped with qualified safety management personnel;

(3) responsible for the development of the Institute of Geological Research and the project department, the project department and the project team signed a safety responsibility letter at all levels;

(4) signed with the external personnel and outsourcing team labor agreement, clear safety responsibilities and safety accident compensation principles.

2. Project Manager's Safety Responsibilities

(1) The project manager is the first person responsible for the safety of the project, responsible for the daily production safety management, organizing the staff to learn and implement the Executive Board and the Institute's various production safety rules and regulations and safety operation procedures, and formulate the field operation procedures and field production safety management system in conjunction with the project and make the system on the wall;

(2) educating the staff to follow the rules and regulations and to make sure that they are in compliance with the rules and regulations, and to make sure that they are in compliance with the rules and regulations, and to make the system on the wall. 2)Educate workers to follow the rules and regulations, abide by the national regulations and laws of Guinea, respect local folk customs, and stop violations;

(3) Organize safety day activities for each project team, responsible for organizing safety inspections, and discovering unsafe factors in a timely manner to organize forces to deal with them and report them to the superiors;

(4) Immediately report any accidents, and organize salvage operations to protect the scene, make detailed records, participate in and assist in the investigation of accidents, and provide assistance in the investigation of accidents and the management of field production. Records, participate and assist in accident investigation, analysis, implementation of preventive measures;

(5) supervise and educate the workers to use reasonable use of labor insurance products, the correct use of various protective equipment, to prevent accidents before they occur. Organize regular safety thinking, safety knowledge and safety technology education for workers, and organize regular assessment.

3. Project team leader's safety responsibilities

(1) the project team leader for the project team's first responsibility for safety, is responsible for supervising and checking the implementation of specific safety measures and systems;

(2) in the arrangement of the production at the same time responsible for the safety of the technical delivery of the work of this post, the project's safety and technical points and precautions to be clearly explained;

. p>(3) Responsible for organizing safety inspection work, regular and irregular inspection of safety production; regular evaluation of the stage of safety production.

4. Duties of the safety officer

(1) under the leadership of the head of the unit, is responsible for the unit's production safety management, to assist the head of the unit to implement the instructions and regulations of the higher production safety, and check and supervise the implementation;

(2) participate in the development of the Institute's relevant production safety management system and safety and technical procedures, and check the implementation of the situation;

(3) to do a good job of the staff's safety ideology, safety and technical education and assessment, is responsible for the second level of safety education for new employees, supervise and inspect the project team, post "three-level" safety education. Assist the head of the unit to convene regular production safety meetings, inform the production safety situation, convey the implementation of the Institute of Geological Research production safety management regulations. The unit's production safety should be strictly controlled, the violation of the provisions of production safety management should be resolutely stopped;

(4) is responsible for the unit's daily production safety management, at any time on the unit's various production processes, working environment equipment, facilities for inspection, found that the problem is dealt with in a timely manner to solve, can not be resolved in a timely manner to report to the person in charge of the unit. And is responsible for the unit's safety equipment, fire-fighting equipment, protective equipment and first aid apparatus management;

(5) in-depth site safety inspections, timely detection of hidden dangers, to stop unauthorized operation.

5. Safety duties of project team members

(1) Strictly abide by the rules and regulations of production safety and operating procedures, learning and mastering the knowledge of safety, and improving the level of safety technology and operation.

(2) Consciously study the construction site safety system and safety technology knowledge, improve safety awareness and self-protection ability, do a good job in the workplace protection, according to the provisions of the wear good personal protective equipment, beware of personal safety accidents.

(3) Strictly observe the discipline of labor production and foreign affairs, respect the local folklore and folk customs, and consciously prevent personal injury or terrorist incidents.

Four, production safety management system

(1) system supporting, perfect: must be effective in organizing all workers to learn and implement the "Work Safety Law"; according to the state, the industry's production safety laws and regulations, and the system to establish a better safety management system of the unit (i.e., the main types of work, the business of the operating norms, the safety management system, the safety of the system of rewards and penalties, and the safety inspection and learning). system, etc.).

(ii) sound organizational structure: the establishment of a legal representative or the main operator as the head of the safety management leadership institutions: responsible for the safety work of the competent leadership should be in place, the responsibility should be clear: the unit has a specific responsible for the daily management of safety institutions and personnel.

(C) timely and effective safety inspections

1, the key units of safety, key departments must be carried out once a month for safety inspections; non-key units at least once a quarter for safety inspections;

2, to do a good job of the national statutory holidays for safety inspections, the inspection surface covering all production units:

3, the safety inspections must be Do a good job of inspection records, the detection of hidden security problems to be issued in writing rectification notice, ordering rectification within a certain period of time;

4, on the detection of significant hidden security problems or easy to cause mass deaths and injuries to the safety of the problem must be reported in writing upwards, and timely development of rectification programs, to take precautions;

5, in conjunction with the Bureau of Production Safety to do a good job in the annual "Work Safety Month". "Production Safety Month" activities.

(D) resource allocation to be in place

1, according to the unit of production safety to arrange a certain amount of security measures costs;

2, the production units (including project departments, groups) must be fully equipped with security administrators;

3, the units according to the nature of work or business and the focus of the security, fully equipped with security, fire protection equipment and facilities, key parts of the Configuration of safety signs, signs should be complete and clear;

4, to ensure that personnel engaged in special types of work in accordance with the requirements of the higher safety authorities, regular learning and training, and adhere to the license to work;

5, the scope of the issuance of labor protection, the issuance of standards and the number of safety requirements, the use of labor protection should be strictly managed.

(E) management foundation work to be solid

1, to establish a safety learning, education system that can cover all workers, and often organize safety training, learning and practical exercises. Do a good job of learning records;

2, each quarter to develop a production safety plan and work summary, the year to comprehensively summarize the safety work;

3, a variety of safety awards and penalties within the unit to cash in a reasonable, in place.

(F) the problem should be dealt with in a timely and appropriate

1, the production and operation of major mechanical and personal accidents should be reported in a timely manner, the strict implementation of the 24-hour reporting system;

2, all types of safety accidents should be dealt with in a proper manner, and aftermath of the work to try to be appropriate.

Fifth, the technical specifications and operating procedures

State promulgated the "iron, manganese, chromium geological exploration specifications (DZ/T0200-2002)", "core drilling regulations (geo-engineering 〔1982〕 No. 558 issued on October 17, 1982)", "solid mineral exploration of the original geological compilation and recording provisions (DZ ∕T0078-93)", "solid mineral exploration", "comprehensive organization of geological data, comprehensive and comprehensive". Provisions on Comprehensive Organization and Comprehensive Research of Geological Data for Exploration (DZ∕T0079-92)", "Specification for Preparation of Geological Reports on Solid Mineral Exploration (DZ∕T0033-2002)", and "Safety Regulations for Geological Exploration (AQ2004-2005)", and so on.

Sixth, Safety Emergency Response Plan

Based on the characteristics of the project, we have formulated the management system of emergency response for overseas projects. The Safety Emergency Response Plan of Guinea Project is formulated in accordance with the laws, regulations, customs and local security situation of Guinea. It mainly includes general provisions, emergency preparation, emergency response and supervision and management, etc. For details, please refer to Attachment 3 "Safety Emergency Response Plan".

Attachment 1:

Safety Production Responsibility Letter

(Project Team)

In order to improve the safety management of the construction operation of XXXXXXXXXXXXXXX project, the following safety production responsibility letter is signed with the person in charge of the project team.

I. The person in charge of the project is the first person responsible for production safety. Responsible for the establishment of the project production safety management team, responsible for the project's production safety management, the development of project safety work plan and emergency plan. Production safety management team leader by the project manager, and set up a deputy team leader, team members.

Second, the project team is fully responsible for the production safety work, supervise the project team to strictly abide by the rules and regulations of production safety and operating procedures, learning and mastery of safety knowledge, improve safety technology and operation level; responsible for the project team of new workers before the start of the production safety education;

Third, in the various production activities, the implementation of the higher level of the decision on the safety work and the In all production activities, implement the decisions of the higher level on safety work and the rules and regulations of production safety, so that the safety work has content, layout and inspection;

Fourth, adhere to the policy of "safety first, prevention first", responsible for the project team's regular safety activities, so that the content, personnel, time, records of the four implementations;

Fifth, the implementation of the objectives of the work of safety, not "contracting instead of management", not "contracting instead of management". The company is not allowed to "substitute the management with the package". Actively support the work of full-time and part-time safety officers. Wherever there are employees operating, there should be safety staff;

Six, responsible for proposing the project team's safety and technical measures plan and measures to eliminate hidden dangers of the program, in the operation found to endanger the safety of persons and property, should be dealt with decisively, to protect the safety of persons and property;

Seven, in the event of a production safety accidents, should be immediately organized to save the lives of the people, in a timely manner, and truthfully to the higher authorities to report, and participate in the accident investigation and treatment. And participate in the accident investigation and treatment, put forward preventive measures;

VIII, do a good job in the workplace protection, create good working conditions, check and supervise the relevant personnel in accordance with the provisions of the wearing of personal protective equipment, and strive to achieve safe, civilized, standardized production;

IX, in the event of an accident in the project, we should take effective measures to organize the rescue, control the development of the accident and immediately report to the superior Report to the relevant departments, the accident injury treatment should adhere to the principle of not sparing the dead, serious investigation, analysis, treatment, in order to prevent the recurrence of accidents;

Ten, construction outside the country must be strengthened to belong to the personnel of the educational work, to ensure that employees comply with the discipline of the foreign affairs, respect for the local folklore, folk customs, consciously to guard against personal injury or terrorist incidents.

Xi, before entering the construction site, should pay attention to observe the blasting site of the various signs, signals, to ensure safety.

twelve, all staff are prohibited from drinking before work, are not allowed to rest and sleep in dangerous areas, such as tanning troughs, old caves, etc..

Thirteen, field work in the event of thunderstorms, shall not stay on the top of the mountain, gully and other low-lying places, and shall not take shelter under large trees to prevent flooding, lightning.

Fourteenth, field work, pay attention to poisonous snakes, poisonous insects bite.

Fifteen, the hot weather, equipped with heat-prevention drugs, bring enough drinking water when going up the mountain, to prevent people from heat stroke.

Sixteen, in the event of sandstorms, operators should choose a favorable location to take refuge, while paying attention to the protection of information, return should pay attention to identify the direction, in order to prevent getting lost.

This statement of responsibility is in two copies, and each party keeps one copy.

Unit (Chapter): Time: Monthly

Project Manager: Time: Monthly

Security Emergency Plan

---"XXXXXXXXXC" project

1 General

1.1 Preparation Purpose

Adhere to the people-oriented, follow the principle of prevention, constant preparedness in the case of encountering Accidents and natural disasters and emergencies, rapid response, timely disposal, minimize accident losses or eliminate the occurrence of accidents, establish and improve the emergency protection and rescue mechanism, in order to improve the emergency rescue capacity of geological surveys, to maintain national security and social stability, to promote the comprehensive, coordinated and sustainable economic and social development, and to ensure the smooth progress of field geological work.

1.2 Preparation basis

Based on the "National Emergency Response Plan for Work Safety Accidents and Disasters", "People's Republic of China", "State Council on the comprehensive strengthening of the emergency management work", "Safety Regulations for Geological Exploration (AQ2004-2005)", "Tianjin Huabei Geological Survey", "on strengthening the safety of the work of the 2011 year notice" (Tianjin Huabei Survey 20111), "the work of the Geological Survey", "the work of the Geological Survey" and "the work of the Geological Survey". (Tianjin Huajian Jingji 20111) (hereinafter referred to as "Safety 1") and "XXXXXXXXX" (revised) (Tianjin Huajian Jingji 201135) and other relevant laws and regulations to formulate this plan.

1.3 Scope of application

This plan applies to the emergency rescue of emergencies in the course of the operation of the project team of "XXXXXXXXXXXX".

The emergencies referred to in this plan refer to the emergencies in the course of geological survey operations that cause or may cause casualties, property damage and serious social harm and adverse international impacts, and jeopardize the safety of employment outside the country

1.4 Grading

1.4.1 Early warning grading

(1) Red grade

Indicator Signs: Intelligence shows that The threat of emergencies is approaching, or there is conflict or war in localized areas, or intelligence confirms that an armed or terrorist attack is imminent.

Action: Foreign organizations prepare for emergencies and warn people concerned to reduce going out or refrain from going to dangerous areas. Activate the emergency plan, take measures to protect the safety of life and property, and prepare for evacuation if necessary.

(2) Orange Level

Indicator Signs: Intelligence indicates that there is a realistic possibility of an emergency, or localized conflict or unrest.

Action: the relevant departments pay attention to the collection of intelligence, tracking the dynamics of the situation, considering the manner, scale and impact of the emergencies, improving the response program, adjusting the work arrangements if necessary, and issuing security alerts.

(3) Yellow Level

Indicator Signs: Intelligence information indicates an increased likelihood of an emergency.

Action: Remind the relevant units and personnel to pay close attention to the collection of intelligence and tracking of situation dynamics, while considering the manner, scale and initial response to the possible occurrence of emergencies.

(4) Blue Level

Indicator Signs: Intelligence information indicates that a critical incident may occur.

Action: Remind the relevant units and personnel to pay attention to their thoughts, pay attention to the collection of intelligence, track the situation dynamics, and pay attention to safety.

1.4.2 Response Grading

(1) Level I Response (Especially Significant)

Terrorist attacks, local wars, or government military operations are unfolding in Forecariah and Faranah; the emergencies result in casualties; and cause economic losses of more than 1 million dollars.

(2) Level II Response (Major)

Small-scale tribal conflicts, ethnic conflicts, religious incidents, social unrest in Forecariah (Forecariah) and Faranah (Faranah), with economic losses of $100,000-1 million dollars.

(3) Level III Response (Larger)

Labor disputes, contract disputes, or production accidents resulting in injuries, handling disputes, and economic losses of less than 100,000 USD.

1.4.2 Rescue grading

In accordance with the ability of emergency response agencies at all levels to deal with emergencies, the emergency response to emergencies in geological survey operations is divided into Ⅰ to Ⅲ levels:

Ⅰ level (major): the Institute of Geological Research does not have the ability to solve the problem, and it is necessary for the Bureau of Work Safety Committee, the Embassy, the Consulate, the A party, the Institute of Geological Research to organize and implement a larger emergency rescue.

Level II (general): general emergency that the Institute can handle.

Class III (small): emergency events that the project team can handle.

1.5 Working Principles

(1) Safety first, prevention first.

(2) Unified leadership, hierarchical responsibility.

(3) Quick disposal, scientific and efficient.

2 Emergency Preparedness

2.1 Rules and Regulations

The Institute of Geological Research must formulate a management system related to emergency response for overseas projects. The project team in Guinea should take into account the laws, regulations, customs and local law and order situation in Guinea to formulate complete rules and regulations.

2.1.1 Establishment of external contact system. The project department in Guinea should report to our embassy (consulate) in Guinea, the Economic and Trade Commission and the local government, police and security department for record, and establish the emergency contact for emergencies; establish the emergency contact with the local Chinese-funded companies, friendly neighboring units, and medical institutions, so as to obtain the assistance and support from all parties in time in the case of social security emergencies. The contact numbers of relevant departments are attached.

2.1.2 Establish a duty system. Arrange duty room, designate a person responsible for duty, set up duty phone and backup duty phone. During special periods (in the event of social security emergencies or red alerts) it must be guaranteed that there will be someone on duty 24 hours a day, and that they can keep in touch with our embassies (consulates) in the country at all times.

2.1.3 Establishment of leave system. Strictly implement the system of going out to ask for and cancel leave. Non-working needs should be reduced. At special times, the system of traveling with two or more people should be implemented. Outside the personnel to carry communication tools, in order to keep in touch. When returning from an outing, leave must be canceled. The person in charge shall immediately find out the situation and take appropriate measures if the person overstays his/her leave.

2.1.4 Establishment of resident and site safety and security system, arrange full-time personnel responsible for resident and site safety and security work, the key preventive areas should be determined according to the actual situation. We work closely with the security and police departments of the countries where we are stationed, and request the military police to guard our stations and construction sites when necessary.

2.1.5 Establish regular notification and emergency reporting system. The project department should regularly report the situation to the domestic (Huayan Bureau of Investigation, Geological Research Institute). Social security incidents must be reported at the first time.

2.1.6 Establish a system of external injury insurance. Ground Research Institute shall take out overseas personal accident insurance for all Guinean Project Department staff. In the event of an accident, ensure that there is sufficient financial protection to promptly resolve the costs of medical assistance for personnel, in order to reduce the huge burden on the Institute.

2.2 Organizational System

2.2.1 Leadership Institution

Bureau of Work Safety Committee

Geological Research Institute

Project Leader: Zhang Baohua

Project Team Safety Officer Li Hongchen Dong Yi Gao Xiang Chi Qikun Mu Jianqiang.

2.2.2 Emergency Response Organization

There are three levels of emergency response organizations for geosurvey operations:

Level 1: Bureau of Work Safety Committee;

Level 2: Institute of Geological Research;

Level 3: project team.

2.2.3 Responsibilities

Establishing and improving the working mechanism of security prevention, strict system management, strengthening defense education, and improving early warning capability. In the event of social security incidents, report to our embassy in Guinea and the Safety Production Committee of Huayan Bureau at the first time, seek help from the local government, deal with them appropriately, ensure the safety of employees, and reduce the losses.

2.3 Emergency social resources and materials

2.3.1 Establish and maintain communication channels with our embassies and consulates in Guinea.

2.3.2 Establish and maintain channels of communication with the intelligence agencies, Red Cross, hospitals and Chinese community associations exercising effective control in the cities of Forécariah and Faranah.

2.3.3 Technical support systems for emergency management (walkie-talkies, telephones, satellite phones, cell phones, sirens, broadcasting equipment, computer networks, etc.);

2.3.4 Necessary first-aid equipment

2.3.5 The financial department shall provide financial security in accordance with the relevant regulations and the needs of the emergency.

2.4 Emergency Response Training

Emergency response training shall be provided to the project team personnel in Guinea before going abroad. They should understand the legal and political environment of Guinea*** and the country, understand the local security and customs, learn the necessary language for communication, familiarize themselves with the emergency plan, strengthen the sense of emergency prevention, and familiarize themselves with the communication and liaison of information, self-help and evacuation under extreme circumstances.

After arriving at the work site, safety education and training must be carried out regularly, so that all project team personnel fully recognize the special characteristics of the foreign environment and understand the necessity and importance of taking measures. Establish the concept of "prevention first, prevention is higher than disposal", enhance the sense of responsibility, strengthen the sense of contingency, so as to be vigilant and always be prepared. Improve the conscientiousness to do a good job of social security emergencies.

2.5 Preventive Measures

2.5.1 The project department of Guinea should formulate practical "Emergency Response Plan for Overseas Engineering Emergency Social Security Incidents" for the specific situation of Guinea's national conditions and laws and regulations, and rehearse it. At the same time, consider hiring a local security consultant.

2.5.2 Select employees with strong self-restraint, educate and standardize employees, understand local culture and history, and respect local customs and folklore.

2.5.3 The principle of safety first based on the actual situation of the local community to choose the site, with appropriate channels to communicate the project adjacent to the community residents relationship. Respect the local staff, treat each other as equals, and live in harmony***. Treatment involving life safety and occupational health protection must be equal to life.

2.5.4 Establish and implement a strict leave request and cancellation system for going out (leaving the site and campsite). Vehicles as well as all kinds of on-road engineering machinery, must be dedicated to the vehicle and personnel responsibility system, the establishment of a strict safety education and regular inspection system, is strictly prohibited non-designated personnel to use vehicles and machinery.

2.5.5 Establish and maintain channels of communication with the intelligence agencies, Red Cross, hospitals, and Chinese community associations exercising actual control in the cities of Forécariah and Falana.

Designate a person to maintain regular contact with our embassies and consulates in the region, and at the same time strengthen communication with the local government's intelligence agencies.

2.5.6 According to the security needs, set up a special security organization or designate special security personnel. According to the security needs, choose commercial security or national intelligence agencies to provide security.

2.5.7 Pay close attention to the social security trends in the cities of Forécariah, Farana and neighboring areas. If any suspicious situation is found around the construction site or residence, timely take countermeasures and report to our embassy and consulate and local government, and inform the owner.

2.5.8 Purchase suitable overseas personal injury insurance for overseas personnel.

3 Emergency Response

3.1 Alarm

3.1.1 In the event of an emergency within the scope of the warning, the head of the project team shall report the incident by phone to the Institute of Geological Research at the first time. The written report shall be submitted to the Bureau's Safety Committee within two hours. The content of the report is the occurrence of on-site events, the disposition of the situation, the scale of the incident, personnel and property losses and other basic information.

3.1.2 Level Ⅰ response event, the Bureau of Work Safety Committee shall, upon receipt of the alarm, immediately report to the Ministry of Foreign Affairs, the Ministry of Commerce, the Ministry of Construction, the State-owned Assets Supervision and Administration Commission, as well as other relevant government departments.

3.1.3 In the event of an emergency within the scope of the warning, the project team shall report to the local intelligence agency and the local government at the first time, and inform the owner.

3.2 Emergency measures

3.2.1 When an emergency within the scope of the warning occurs, the project team immediately start the emergency response plan, clear emergency command site, arrange for the personnel responsible for emergency communication means.

Clear event dedicated to external news release spokesman.

The person in charge of the project team shall report the development of the situation to the Institute at any time. At any time to the country's embassy and consulates in Guinea and the relevant foreign organizations to report. And inform the owner and the local government intelligence agency.

3.2.2 In the event of a Level I response, the Bureau's Safety Production Committee will activate the emergency response plan, and the Bureau's leaders will lead the emergency response working group to rush to the scene of the incident in the shortest possible time to seek the support of China's embassies and consulates and overseas organizations for emergency response and disposal.

3.2.3 If the safety of construction workers cannot be guaranteed, the project team suspends the construction and all the employees withdraw to the safety zone, and at the same time, informs the owner and goes through the relevant contract procedures.

3.2.4 Injured personnel in the emergency medical treatment, in order to ensure road safety, it is appropriate to send the local hospital as soon as possible for treatment.

3.2.5 When the kidnapping incident occurs, any employee shall not have any excessive words or behaviors, maintain communication channels, inform our embassy and consulate in Guinea as soon as possible, and seek appropriate solutions. And report to the Bureau's Safety Committee organization at all times.

3.2.6 The Bureau's Work Safety Committee coordinates the work of pacifying the families of the employees involved in overseas engineering emergencies.

3.2.7 When there is no possibility of calming down the emergencies in a short period of time, under the guidance of the Bureau's Work Safety Committee, the works shall be suspended to evacuate the personnel.

3.3 Emergency Response Disposal

3.3.1 Information Reporting

(1) Initial Reporting

The project team, when discovering the occurrence of the incident, or after receiving the alarm of the occurrence of the incident. The project team shall promptly report to the unit to which it belongs, not later than 5 hours; the Institute of Geological Research shall immediately and truthfully report to the Bureau of Work Safety Committee, not later than 6 hours. The contents of the report include time, location, source of information, nature of the incident, scope of influence, development trend of the incident and measures that have been taken. In the process of emergency response, the report should be renewed in a timely manner to report the relevant information, and no late report, false report, concealment and omission of the report.

(2) Process Report

During the development of an emergency incident, the project team should report to the Institute in writing at least once a day.

The Bureau's Safety Production Committee is required to submit reports to the Ministry of Foreign Affairs, the Ministry of Commerce, the Ministry of Land, the State-owned Assets Supervision and Administration Commission (SASAC), and relevant government agencies within the required timeframe.

Social security incidents that undergo sudden changes or deterioration and escalation must be reported immediately. The content of the report is based on the handling of the incident, in addition to additions and revisions to the initial report.

(3) Closure Report

After the termination of the incident, the project team submits the incident closure report to the GIS. The Bureau's Safety Production Committee submits the report to the relevant government departments based on the requirements.

(4) Information Release

The release of information on overseas emergencies is carried out by the Bureau's Work Safety Committee according to the instructions of the relevant government departments.

The local release of information on overseas emergencies shall be decided by the project team after consulting the embassy or consulate as well as the Bureau's Work Safety Committee.

3.3.2 Emergency Disposal Procedures

(1) After the occurrence of an emergency, the project manager, the deputy production manager and the person in charge of the relevant group shall, according to the degree of the incident, be present at the first time to command the situation, activate the corresponding plan, carry out on-site dispositions and rescue work, and report to the higher level of emergency response organizations in a timely manner.

(2) promptly set up isolation zones at the scene of emergencies, blockade and protect the scene, evacuate people, and control the security situation at the scene. Rapidly take effective measures to check and eliminate secondary dangers, prevent secondary accidents from occurring, and effectively protect the personal and property safety of the project team.

(3) to the perpetrator or directly responsible for the perpetrator, immediately take control measures, and quickly report.

3.3.3 Precautions

(1) In line with the principle of "foreign affairs is no small matter", all foreigners involved in accidents and disasters should be reported to the foreign affairs department in time.

(2) In the event of casualties, immediate measures should be taken to rescue the injured and reduce casualties.

(3) After the accident and disaster, it is necessary to consider the problem of secondary injuries that may be triggered, and measures should be taken to deal with them appropriately and in a timely manner, to defuse conflicts and prevent the situation from expanding and evolving.

(4) To regularly and comprehensively check the safety performance of relevant equipment and facilities, and find management loopholes and hidden security problems, and make timely improvements and remedies to maximize the elimination of accidents and disasters.

(5) To summarize the lessons learned in a timely manner, for negligence, malfeasance and other reasons leading to accidents, to pursue the responsibility of the relevant responsible persons.

(6) We should pay attention to the safety situation around the camp, reflect the existence of potential safety hazards to the higher authorities and local governments in a timely manner, and put forward corrective comments and suggestions. It is necessary to strengthen the education of general safety knowledge of project team members and enhance the self-protection ability of project members.

3.4 Emergency Response

(1) Level I Emergency Response

For major emergencies in which the secondary emergency response organization (Institute of Geological Research) fails to effectively control the situation by prior disposal, the Bureau will activate the Level I Emergency Response to command the Institute of Geological Research and carry out the emergency response and rescue with emergency response forces of the Party A, the embassy (consulate), and the local government of Guinea.

(2) Level II Emergency Response

Three-level emergency response agencies (project team) failed to effectively control the state of affairs of the larger emergencies, the start of the Level II emergency response, the command of the project team emergency response forces to implement emergency rescue. And report to the Bureau of Work Safety Committee, the Bureau of Work Safety Committee into emergency preparedness, timely grasp of the relevant emergency rescue situation.

(3) Level III Emergency Response

For general emergencies where the disposal of the three-level emergency response organization (project team) can effectively control the situation, the project team will start the Level III Emergency Response and report to the second-level emergency response organization; the second-level emergency response organization will enter into emergency preparedness, keep abreast of and master the relevant emergency rescue situation, and issue an early warning to the relevant departments.

3.5 Aftercare and Investigation and Evaluation

3.5.1 After the people involved in the accident are stabilized or successfully rescued, they need to be arranged to return to their home country to recuperate and undergo the necessary psychological treatment.

3.5.2 For the deceased personnel involved in the emergency response, the Bureau of Safety Committee coordinates with the relevant enterprises and the project team leadership group, and shall do a good job in escorting the remains, memorializing and pacifying and compensating the families.

3.5.3 Construction sites where emergencies have occurred, it is advisable to resume work as soon as possible, provided that the safety of the staff can be ensured.

3.5.4 deal with the residual problems, do a good job of the incident emergency summary, reported to the resident embassy (consulate) and higher institutions. Organize the evaluation and revision of the Emergency Response Plan for Overseas Emergencies and Social Security Incidents.

3.5.5 Under the guidance of superiors, do a good job in personnel resettlement, damage assessment, compensation, rewards and other follow-up matters.

3.6 Emergency closure

3.6.1 Huakan Group and overseas organizations announce the termination of the emergency according to the warning level and emergency management.

3.6.2 Summarize the lessons learned, revise all kinds of management systems, and make new arrangements for manpower, materials, funds, communications and other emergency protection.

4 Supervision and Management

4.1 Pre-planning Exercise

The project team should prepare an emergency exercise plan and organize the exercise.

4.2 Publicity

The project team shall regularly organize and carry out the publicity of emergency laws and regulations and common sense of accident prevention, risk avoidance, disaster avoidance, self-rescue and mutual rescue, and improve rescue skills.

4.3 Responsibility and rewards and punishments

Geological survey operations emergency response work to implement the leadership responsibility system and accountability system.

The units and individuals who have made outstanding contributions to the emergency rescue work shall be recognized and rewarded.

To disobey the command and impede the emergency rescue work units and individuals in accordance with the relevant provisions of the punishment, resulting in significant losses, by the judicial department shall be held legally responsible.