Equipment management and overhaul maintenance regulations?

A, safety protection facilities management regulations

1, construction site safety facilities, including safety nets, hole cover, guardrail, guards, a variety of restrictions on the insurance device, must be complete and effective, shall not be removed or moved without authorization, due to the construction of the need to move, should be responsible for the project department management personnel should be agreed to, and take the appropriate temporary safety facilities, before moving. In addition to the construction site should be set up to promote safety placards, dangerous parts should also hang reflective signs.

2. The safety management department of the project department shall regularly/irregularly inspect the status of safety protection facilities of the project department, and its inspection contents are:

Construction team/construction section shall carry out construction work according to the requirements of the approved construction organization plan and safety technical measures;

All the safety facilities, such as: scaffolding, derricks, templates, cranes, safety nets and edge Erection and its protective devices by the responsible department acceptance, confirmed qualified before being put into use; in the process of use should be regularly inspected and maintained;

After the completion of the construction work, safety facilities, other protective devices to confirm that they are not needed, after the approval of the demolition of the program can be carried out in accordance with the provisions of the program, and send a safety officer to monitor the establishment of warning signs for the hazardous areas, if necessary.

3. During the inspection, problems are found and the responsible departments/personnel are immediately notified or ordered to make corrections.

Two, the construction site traffic management regulations

.1, the field road should be regularly maintained and kept open; heavy vehicles through more road curvature and width should be in line with relevant regulations; sharp turns, steep slopes should be set up in obvious traffic signs; near the river and steep slopes in the road, should be set up guardrail and obvious warning signs.

2, motor vehicle loading requirements in line with the relevant national safety requirements.

3, in the hole, level crossing and construction of narrow sections should be set up "slow" signs, if necessary, set up a person to direct traffic; where parked close to the limits of the vehicle operation facilities / equipment, set up in the low edge of the low-voltage red flashing lights;

4, the Department of machinery and materials / Ministry of General Affairs according to the scope of responsibility of the driver, vehicle safety management, the development of vehicle safety management.

4、Machinery Department/Integrated Department is responsible for the safety management of drivers and vehicles according to the scope of work responsibilities, and develop vehicle safety management measures.

5, the driver is responsible for the daily inspection of the vehicle I drive the situation, found that the problem is immediately dealt with, and make a good inspection record.

6, the occurrence of traffic accidents in the field of treatment:

If the occurrence of traffic accidents in the field, according to grow up in the company's "accident management regulations" related to the implementation of the requirements.

Three, fire facilities safety management regulations

1, in accordance with the relevant provisions of the state requirements for the configuration of fire facilities, equipment and equipment, set up fire safety signs, and regularly organize inspections, maintenance, to ensure that the fire facilities are intact and effective.

2, the fire facilities, equipment and equipment storage location is marked, so that when a fire can be found in time.

3, fire equipment should be placed in an obvious and easy to access places, the fire equipment to establish a file on the configuration of the fire equipment, type, quantity, set up location, inspection and maintenance units (personnel), replacement of the time of the agent, etc., to register, fill out the 〈Fire Equipment Registration Form.〉.

4, any unit or individual shall not damage or misappropriation, demolition, deactivation of fire facilities, equipment, shall not be buried fire hydrant, shall not occupy the fire spacing, shall not block the fire escape.

5, the use of fire equipment must be unified by the Department of management and maintenance, the development of fire equipment distribution network diagram. The use of fire equipment by a person responsible for the management and maintenance. Winter to take anti-freezing measures, summer to take measures to prevent sunlight, and often check whether the nozzle is blocked.

6, dry powder fire extinguishers should be stored in the temperature between -10 ~ 45 degrees, and annually check whether the pressure of the fire extinguisher is up to standard, and if it exceeds the prescribed range, it should be supplemented in time.

7, fire hydrant, fire hose, fire hose is a fire fighting equipment, not for other purposes. To frequently check the hydrant valve is intact, so that it is in good fighting condition.

8, the project integrated management department should be a monthly comprehensive fire facilities inspection.

4, pressure vessels, hazardous chemicals safety management regulations

1, in order to conscientiously implement the national "Regulations on the Safety Management of Hazardous Chemicals", to strengthen the pressure vessels, hazardous chemicals safety management, to ensure that pressure vessels, hazardous chemicals in the process of purchasing, transportation, storage, and use of the safety of the development of the provisions of this regulation.

3. The machine and material department of the project department is responsible for the specific control of the procurement, transportation, storage and use of pressure vessels and dangerous chemicals.

4, types

The national "Regulations on the Safe Management of Dangerous Chemicals" refers to the national standard GB6944-86 "Classification of Dangerous Goods and Product Numbers" in the explosives, compressed gases and liquefied gases, flammable liquids, flammable solids, spontaneous combustion of goods and flammable substances in contact with moisture, oxidizers and organic peroxides, Poisonous and corrosive products 7 categories, and my company's project department is currently using compressed gases, liquefied gases and gasoline, diesel fuel, oxygen, acetylene, liquefied gas, epoxy resins, paints, and water, etc.; the use of the relevant provisions in accordance with the national implementation.

5, procurement

Project department machinery and materials department must be based on the engineering department to provide the need for the plan, develop a procurement plan, according to its specifications, such as the number of requirements, choose to hold a hazardous chemicals business license to be purchased by the supplier, the product must be "three certificates and one vote".

6. Transportation

Select appropriate loading and unloading tools according to the nature of hazardous chemicals; select the supplier with "Chemical Hazardous Materials Permit" for transportation; hold and place the goods gently, no impact, and barbaric loading and unloading such as throwing, dragging, and tossing are strictly prohibited, and the goods should be fixed firmly to prevent tipping and falling; prohibit mixed loading and mixing of goods and people.

7, storage

1), the storage of hazardous chemicals, must be established in the acceptance of storage, delivery and inspection, receipt and distribution of running tally and triple bill of materials, in and out of the warehouse registration system.

2), set up a special warehouse, should be consistent with the relevant safety and fire regulations. And according to the object type, nature, set up with flame-proof, explosion-proof, heat-proof, sun-proof, moisture-proof "five measures" of the warehouse; chemical nature or protection, fire extinguishing methods contradictory to the hazardous chemicals, shall not be stored in the same warehouse or the same storage room. Acetylene cylinders and oxygen cylinders are not allowed to be stored in the same warehouse.

3), where the packaging, marking does not meet national standards, or broken, mutilated, leaking deformation of the goods, is strictly prohibited from entering or leaving the warehouse.

4), the warehouse management personnel must be qualified by the relevant safety knowledge training before taking up their duties, and the items under the custody of the frequent inspection, timely detection of changes in the items, and timely adoption of safety measures.

4), the warehouse can not be overstocked, the requirements of the items and beams, columns, roof distance of not less than 0.3 meters, and the distance between the wall, lamps of not less than 0.5 meters, between items of not less than 1 meter, the bottom distance of not less than 0.1 meters.

5), the warehouse is strictly prohibited around the open fire operation, shall not be stored in the open air and exposure to the sun, set up appropriate fire fighting equipment in the warehouse area to ensure that the fire water pressure is sufficient. Depot installation of fixed explosion-proof lighting fixtures, shall not use moving lamps for lighting.

6), the safety of the storage site, to implement the "safety first, prevention first" policy, to do a few adhere to:

(1) adhere to the strengthening of the leadership of the safety of hazardous chemicals;

(2) adhere to the education of employees to consciously do a good job of safety;

(3) adhere to the strict enforcement of the safety of dangerous chemicals;

(4) adhere to the safety of the storage site, to ensure that the storage area is equipped with appropriate fire-fighting equipment to ensure that the fire water pressure is sufficient. p>(3) adhere to the strict implementation of the relevant laws and regulations at higher levels and the operating procedures and job safety responsibility system formulated by the enterprise;

(4) adhere to the strict management of fire and power supply;

(5) adhere to strengthen the fire prevention and explosion-proofing of the storage site;

(6) adhere to the scientific management of the storage of chemical hazardous substances;

(7) adhere to the Regular safety inspections of stored items;

(8) Adherence to economic methods of management;

(9) Adherence to the principle of "four spares" in dealing with accidents.

The above is collected and organized by Zhongda Consulting