The entrances and exits of the air defense basement project, as well as the design of lighting, heating, ventilation, fire prevention, power supply, lighting, water supply and drainage, noise treatment, etc., shall take appropriate measures to comply with the requirements of the usual use, and be completed synchronously in the design. Article 11 The construction unit of the air-raid basement shall submit the preliminary design and construction drawings of the air-raid basement to the municipal administrative department in charge of human defense for review and approval; without such approval, the planning department shall not issue the "Construction Project Planning Permit", and the urban construction department shall not issue the "Construction Permit for Building Projects". Article 12 The construction unit needs to change the design of the air defense basement, general technical changes, shall be agreed by the original design unit; reduce the protection level standard or change the structure, layout, need to be proposed by the original design unit, submitted to the municipal administrative department in charge of human defense for approval. Article 13 The construction of air defense basement shall be undertaken by the construction unit with corresponding qualification, in strict accordance with the approved design drawings, and in line with the national protection standards and quality standards.
Installation and use of special equipment and waterproof materials for air-raid basement shall conform to the standards stipulated by the state. Article XIV air-raid basement project is completed, by the municipal administrative department of human defense in conjunction with the relevant departments in accordance with the basic construction procedures for acceptance; without the acceptance of the municipal administrative department of human defense or acceptance of unqualified, the air-raid basement shall not be delivered for use. Article 15 Within three months after the completion and acceptance of the air defense basement, the construction unit shall report to the municipal administrative department in charge of human defense the project files of the air defense basement. Article XVI of the new civil buildings due to geological, construction and other objective conditions are not suitable for the construction of air-raid basement, in accordance with the "Ningxia Hui Autonomous Region, the implementation of <Chinese People's *** and the People's Air Defense Law> Measures," Article XII of the provisions of the approval and payment of air-raid basement easy construction fees.
The air-raid basement construction fee shall be fully incorporated into the budget management of human defense funds, overall arrangement and special use for the construction of human defense projects. Article XVII of the units to pay for the construction fee, by the municipal human defense administrative department of the building area and the amount of fees paid for the audit, planning, urban construction departments can handle the "construction project planning permit" and "building construction permit". Chapter III Management of Air Defense Basement Article 18 The management unit of the air defense basement shall determine the full-time or part-time management personnel, establish and improve the maintenance and management of the air defense basement system, found that the hidden dangers of safety and timely treatment and report to the municipal administrative department of human defense.
The municipal administrative department of human defense shall regularly inspect the air defense basement and its ancillary facilities. The municipal administrative department of human defense shall stop the behavior that may cause major safety hazards in the air defense basement. Article 19 The maintenance and management of air defense basement shall meet the following standards:
(1) the structure of the project is intact;
(2) the internal environment of the project is neat and clean, with no water seepage or leakage, and the air and drinking water meet the hygiene requirements;
(3) the protective confinement equipments and facilities are in good performance, and the wind, water, and electricity systems are working normally;
(4) the metal and wooden parts are not rusted, corroded, or damaged;
(5) the air defense basement and its appurtenant facilities shall be inspected regularly. corrosion, damage;
(5) the entrance and exit roads are smooth, fire-fighting facilities, orifice camouflage equipment is intact; Article 20 is strictly prohibited the following infringement of the air defense basement:
(1) production and storage of flammable, explosive, highly toxic, corrosive and radioactive hazardous substances in the air defense basement;
(2) discharging wastewater, waste gas, or dumping of waste materials into the air defense basement )
(iii) blocking the connecting channels, entrances and exits, or vents of the air defense basement;
(iv) altering the main structure of the air defense basement;
(v) carrying out blasting, quarrying, and other behaviors that jeopardize the safety of the air defense basement within the safety range of the air defense basement.
(vi) other acts that endanger the safety of air defense basement and reduce the effectiveness of air defense.