How to write the description of project budgeting?

I. Overview of the project: 1. Project name: 2. Construction scale: 3. Employer: 4. Compiled content:

2. Compilation basis: 1. Engineering quantity calculation basis: 2. Pricing by list or budget package: 3. Material pricing: 4. Charge standard: 5. The pricing basis of materials.

Three. Others (to be explained)

Compilation description of highway bridge

I. Scope of establishment

This budgetary estimate is the preliminary design budgetary estimate of * * southern section bridge project. The budgetary estimate is mainly for the K6+740 bridge project.

K6+740 Bridge is 567 meters long and 49 meters wide. Simply supported T-beam is prestressed by post-length method, and frame abutment, column pier and pile foundation are adopted.

Second, the compilation basis

1, Code for Valuation with Bill of Quantities of Construction Projects (GB 50500-2008); );

2. Sichuan Construction Engineering Bill of Quantities Quota (2009);

3. Measures for the Administration of Valuation with Bill of Quantities of Construction Projects in Sichuan Province (JJF [2009] No.3);

4. Notice of the Construction Department of Sichuan Province on Printing and Distributing the Quantities of Construction Projects in Sichuan Province (J.F. [2008] No.453);

5. Adjustment of ziyang's labor cost in Sichuan province in 2009 (SJJJF (2010) No.20);

6. Notice of SJH [2005]115 on adjusting the quota tax standard for construction projects in Sichuan Province.

7. Relevant drawings and documents.

Unit price of labor, materials and machines

The material price is mainly based on the information price of Sichuan project cost information (20 1 1 year 0 1 month * *) and refers to the current market price.

Four, other expenses of engineering construction

1. Management fee of the construction unit: calculated according to Caishuizi [2002] No.394 of the Ministry of Finance;

2. Survey fees and design fees: calculated and listed according to the relevant provisions of the State Planning Commission and the Ministry of Construction (JJ [2002] 10);

3. Consultation fee for preliminary work: calculated according to the relevant provisions of the State Planning Commission [1999] 1283;

4. Environmental impact assessment fee: calculated according to the relevant provisions of the State Planning Commission and the State Environmental Protection Administration (JJ[2002] 125);

5. Project supervision fee: calculated according to the development and reform price [2007] No.670;

6. Occupational safety and health evaluation award: calculated according to *% of the first part of the cost;

7. Fees for site preparation and temporary facilities: calculated by *% of Party A;

8. Billing of bidding agency fees: according to the relevant provisions of the State Planning Commission JJ[2002] 1980;

9. Project insurance premium: calculated as *% of the first part of the project fee;

10. Construction drawing budget preparation fee: *% of Party A's design fee;

1 1. Construction drawing review fee: calculated at *% of the design fee;

12. Project cost consultation (audit) fee: calculated according to the relevant provisions of SJF [2008]141.

Verb (abbreviation for verb) to keep the fee.

1, price difference reserve fee: temporarily excluded;

2. Basic reserve fund: the project cost is calculated as *% of the sum of the first part and the second part.

Estimated amount of intransitive verbs

The total investment of this project is * * * ten thousand yuan, of which the building installation cost is * * * ten thousand yuan.