Maintenance works written contract model 5

Maintenance works written contract model 1

Party A (hereinafter referred to as Party A): __________

Party B (hereinafter referred to as Party B): __________

Hereby, because of the need for Party A to carry out daily sporadic maintenance work. Party B is required to do a good job of sporadic maintenance work, this sporadic maintenance works for the package, all materials provided by Party B. The two sides negotiated the following agreement. The two sides negotiated the following agreement:

First, the content of the project: engineering requirements:

1, maintenance during working hours, can not affect the normal order of the school, while the need to do a good job of safety precautions, the construction can not affect the other facilities, such as damage, Party B is responsible for the compensation to repair;

2, the work must be done in accordance with the relevant norms of construction, compliance with the law, abide by Party A's rules and regulations. Comply with the law, abide by the relevant regulations of Party A ;

3, Party B in the construction process must strictly take the appropriate technical measures ;

4, Party B in the construction process must be conscientious and responsible, can not jeopardize the original facilities, if there is damage, all the responsibility is borne by the Party B and is responsible for the repair, Party B retains the right to Party B to further pursue legal responsibility ;

5, Party B in the work at height, should independently do a good job of safety precautions, do a good job of their own personal safety, all the safety responsibilities borne by Party B, Party A is not responsible.

Second, the project cost:

According to the actual settlement of the cost of (lowercase: __________ yuan) (see acceptance list for specific costs).

Third, the payment method:

In the project acceptance within one month after payment.

Fourth, the warranty period:

Full one year from the date of completion and acceptance. (This maintenance project has been fully completed and accepted on the day of the month of the year.)

Fifth, Party B shall be in accordance with national and local norms and regulations to do a good job on-site construction safety precautions, strict compliance with safety regulations, construction of all types of accidents occurring during the Party B by Party B, Party A does not bear any responsibility. All construction tools by Party B self-care.

Six, this contract in duplicate, each side of a copy, since the two sides signed and sealed to take effect.

Party A (official seal): _________

Legal representative (signature): _________

_________ year ____ month ____ day

Party B (official seal): _________

Legal representative (signature): _________

< p> _________ Year ____ Month ____ Day

Model written contract for maintenance works 2

Contractor: (hereinafter referred to as Party A)

Contractor: (hereinafter referred to as Party B)

In order to clarify the responsibility to complete the ____________ Maintenance on time and in accordance with the Quality and Quantity Construction tasks of the project, in accordance with the "Chinese People's *** and State Contract Law" and "Construction and Installation Contract Regulations", combined with the specific circumstances of the project, the two sides agreed to sign the following terms, *** with the observance of:

First, the project name: custodian of the group's second-floor maintenance works

Second, the contract price: three million four hundred and forty-one thousand one hundred and ten thousand one hundred and ten thousand one hundred and twenty-five dollars nine hundred and forty-nine cents (¥. 341415.49 yuan): 341415.49 yuan)

Third, the contract mode: all-inclusive.

Fourth, the quality of the project: qualified

Fifth, the project settlement: the project costs required by Party B advance payment, the end of the project after acceptance, the project transfer payment, if there is an increase or change in the project, and the original cost of payment.

Sixth, the duration of the project: 90 days. In the event of wind and rain, freezing, high temperature and other natural factors affecting the construction progress, according to the actual number of days to extend the construction period.

VII, Party B to ensure the safety of construction, does not affect the production, all accidents are Party B responsible.

VIII, Party A sends people to monitor the quality and progress of the project, Party B should be strictly in accordance with the construction requirements to ensure the quality of the project, Party B does not follow the regulations of the construction, Party A has the right to put forward rectification methods, otherwise, Party A has the right to refuse payment.

IX. Other matters not covered, the two sides can negotiate a solution. If the consultation fails, according to law to the Bengbu City People's Court.

X. This contract in quadruplicate, the A and B parties to take two copies, signed and sealed into force.

Party A (signature or seal):

Party B (signature or seal):

_______ year _______ month _______ day

Maintenance works written contract model 3

The contracting party (A): Anhui Medical University Contracting party (B): < /p>

In accordance with the "Chinese People's *** and State Contract Law" and relevant laws and regulations, combined with the specific circumstances of the project, the two sides reached the following agreement.

Article I Project Overview

1.1 Project Name:

1.2 Project Location: Anhui Medical University

1.3 Contracting Mode: Party B contracting materials

1.4 Duration: the project is completed before the end of the month of the year from the signing of the contract.

1.5 Project quality: qualified.

1.6 Contract price (RMB): capital (¥ )

Article 2 Party A work

2.1 3 days before the commencement of work, to Party B on-site briefing. Provide Party B with water, electricity, gas and telecommunication equipments required for construction, and explain the precautions for use.

2.2 Assigned as Party A's representative at the site, responsible for contract fulfillment. Supervision and inspection of project quality, progress, acceptance, change, registration procedures and other matters. Involving economic visas, need to be in accordance with the requirements of the relevant provisions of Anhui Medical University for approval procedures.

2.3 If it is determined that there is a need to demolish or change the structure of the original building or equipment pipelines, it is responsible for going to the relevant departments for the appropriate approval procedures.

Article 3 Responsibilities of Party B:

3.1 Quality of the project: Party B should strengthen the quality control measures and management during construction to ensure that the quality of the project reaches the qualified level.

3.2 Labor safety: Party B shall strengthen the labor management and labor education of the construction site personnel, pay attention to labor safety, do a good job in the construction site fire prevention, burglary prevention, electric shock prevention, etc., and shall not arbitrarily destroy the construction site safety enclosure facilities, such as workplace injuries or accidents, Party B is responsible for its own. At the same time, Party B construction personnel must obey and comply with the relevant provisions of Party A's management and rules and regulations.

3.3 civilized construction: material stacking and on-site construction should be subject to Party A's management, so that the material stacking neat, standardized, construction site to ensure that the work is done site clear; to keep the construction site clean, smooth. Construction site is strictly prohibited fighting, brawling, drinking before work is strictly prohibited, the violation of the responsibility of the person will be heavily penalized, the penalty will be deducted directly from the project payment.

3.4 Finished product protection: Party B should strengthen the protection of finished products, not only to prevent the finished product is destroyed by others, but also to prevent the destruction of other people's finished products. Party B's own finished products, destroyed by Party B responsible for their own; Party B damage to other people's finished products, losses borne by Party B, the cost of losses deducted from the project.

3.5 Responsible for the protection of the surrounding buildings and decoration, equipment, pipelines, green space, etc. from damage, or should bear the corresponding costs.

3.6 Cooperate with the relevant departments to do a good job in site defense, fire fighting, garbage disposal and removal, etc., and bear the costs.

3.7 Insurance and all accidents such as injuries and deaths during the construction period shall be borne by Party B, and all expenses incurred shall be fully paid by Party B.

3.8 All the work shall be carried out by Party B, and all expenses shall be paid by Party B.

3.6 Assigned as Party B's representative at the site, responsible for contract fulfillment. Organize the construction according to the requirements, complete the construction tasks with good quality, quantity and on schedule, and solve the matters which Party B is responsible for.

Article 4 Work Schedule Agreement

4.1 Party A shall obtain Party B's consent and pay for the cost of measures taken by Party B due to hurrying up the work when Party A requests to complete the project earlier than the contracted work schedule.

4.2 If Party A fails to complete the work as agreed and affects the construction period, the construction period shall be postponed.

Article V Project Quality and Acceptance Standards

5.1 The project is based on the construction drawings, practice notes, design changes and the "Building Decoration Engineering Construction and Acceptance Code" (JGJ73-91), "Building and Installation Engineering Quality Inspection and Evaluation of Consent Criteria" and other nationally designated construction and acceptance specifications for the quality assessment acceptance standards.

5.2 The quality of the project has reached the national quality assessment standards.

5.3 Party A and Party B should handle the inspection and acceptance procedures of concealed works and intermediate works in time. Party A does not attend the hidden works and intermediate works acceptance on time, Party B can acceptance, Party A should be recognized. If Party A requests for re-inspection, Party B shall handle re-inspection according to the requirements. If the re-inspection is qualified, Party A shall bear the costs, resulting in work stoppage, the extension of the work period; if the re-inspection fails, the re-inspection and rework costs borne by Party B, but the extension of the work period.

5.4 Quality accidents caused by Party B, the rework costs borne by Party B, the construction period will not be postponed.

5.5 After the completion of the project, Party B shall notify Party A of the acceptance, Party A since the acceptance of the notice received by Party B, another date for acceptance. However, Party A shall recognize the completion date and bear the caretaker's and related expenses of Party B.

Article 6 Settlement of Project Payment

6.1 The two sides agreed that the price of the contract to use the first (2) kinds;

(1) fixed price.

(2) Awarded price (including bidding risk) + economic visa. The change part is finalized according to the actual amount of work occurred. Involving economic visas, need to be in accordance with the requirements of the relevant provisions of Anhui Medical University for approval procedures.

(3) adjustable price; calculate the cost in accordance with the relevant state engineering pricing regulations, according to the relevant provisions of the adjustment and completion settlement.

6.2 project settlement using the quota: 20 - year "the national unified basic quota of construction works in Anhui Province comprehensive valuation table Hefei area comprehensive price list" (second edition), 1999 "comprehensive valuation of decorative works in Anhui Province, Hefei area price list", "the national unified installation project budget quota 20 - Anhui Province valuation table". Material prices used in the month of Hefei construction market price information.

6.3 Fees standard: according to the four categories of fees.

Article VII quality assurance period

The project warranty period of 1 year. Warranty period, the work of the project due to natural forces and other subjective and objective factors such as loosening, detachment and other phenomena, Party B is required to visit the site within 2 days free of charge maintenance.

Article VIII Payment

8.1 After acceptance of the project, pay the successful bidder to the contract price of 70% of the contract amount;

8..2 audited by the Anhui Medical University audit department and issued a settlement report after the payment of up to 95% of the final price, and at the same time, the return of the performance deposit (interest-free).

8..2 5% of the settlement price is set aside for the project quality deposit, and when the warranty period expires without quality problems, the bidder returns the project quality deposit (without interest).

Article 9 Material Supply Agreement

9.1 The materials purchased by Party B shall be qualified products that meet the requirements of the project and comply with relevant national standards.

9.2 All materials purchased by Party B shall be prohibited to be used if they do not meet the quality requirements or if there are differences in specifications. If it has been used, all the losses caused to the project shall be borne by Party B.

Article 10 Safety and Fire Protection

10.1 The construction drawings or practice notes provided by Party A shall conform to the "Regulations of the People's Republic of China on Fire Protection" and the relevant fire protection design norms.

10.2 Party B shall strictly abide by the Safety Technical Regulations for Construction and Installation Works, Safety Operation Regulations for Construction and Installation Workers, Fire Protection Regulations of the People's Republic of China and other relevant regulations and norms during the construction period. As Party B violates the relevant safety operation regulations and fire regulations during the construction and production process, resulting in safety or fire accidents, Party B bears all the economic losses arising therefrom.

Article 11 Default Liability

11.1 Due to Party B's reasons, the completion of the project is overdue, and Party B shall pay Party A 5% liquidated damages for each day of overdue completion.

11.2 Party B shall properly protect the equipment provided by Party A and the furniture, furnishings and finished products of the project stacked at the site, and shall compensate for the loss if caused.

11.3 Party A has not carried out any formalities, unauthorized consent to the demolition of the original building structure or equipment pipeline, the resulting loss or accident (including fines), Party A is responsible for and bear the loss.

11.4 Without the consent of Party A, Party B unauthorized demolition of the original building structure or equipment pipeline, the resulting losses or accidents (including fines), Party B is responsible for and bear the losses.

11.5 Without acceptance procedures, Party A use in advance or unauthorized use, resulting in loss of Party A is responsible for.

11.6 Due to one party's reasons, the contract can not continue to perform, should notify the other party, for contract termination agreement, and the responsible party to compensate the other party for the resulting economic losses.

Article 12 Dispute or Dispute Handling

12.1 In case of dispute between the two parties during the period of fulfillment of this contract, the two parties may settle the dispute by negotiation or ask the relevant departments to mediate without affecting the progress of the project.

12.2 Settlement of contractual disputes: disputes occurring during the performance of this contract shall be resolved through consultation between the two parties; they may also be conciliated by the local industrial and commercial administrative departments; if the consultation or conciliation fails, they shall be resolved in accordance with the following (2) way.

(1) submitted to the Hefei Regional Economic Arbitration Commission arbitration;

(2) according to law to the people's court where the construction project.

Article 13 Other Agreements

13.1 Party B should always pay attention to the construction safety in this construction, and at the same time, try to avoid generating a lot of noise in the campus, so as not to affect the normal learning and personal safety of students.

13.2 Party B will strictly follow the construction procedures, and each procedure must be accepted by Party A before constructing the next procedure, so as to ensure the quality of the project.

13.3 During the construction, Party A shall notify Party B in time if there is any change in the project and give economic visa.

13.4 If Party A fails to notify Party B in time and cause rework of the completed works, Party A shall bear the economic loss of Party B.

Article 14 Other outstanding matters, the two sides in line with the principle of equality, voluntariness, fairness, honesty, credit, negotiation and settlement.

Article 15 The bidding documents are an integral part of the contract, and the bidding documents of the project shall prevail over any unspecified contents of the contract.

Article 16 This Agreement shall be in one copy, four copies for Party A and two copies for Party B. The contract shall be signed by Party A and Party B, respectively.

Contractor: Anhui Medical University (seal) Contractor: (seal)

Legal representative: Legal representative:

Entrusted agent: Entrusted agent:

Phone: Phone:

Bank of account: Bank of account:

Account No.: Account No.:

20--year month 20--year month

Model written contract for maintenance works4

Party A: ---- (hereinafter referred to as Party A)

Legal representative:

Party B: Shangjiahe Village Committee (hereinafter referred to as Party B)

Legal representative:

Since June this year, the rainy days, the village road has collapsed in many places. Roads through the village in many places collapsed and interrupted, the ferry is in disrepair there are hidden safety hazards, the village is not able to stop the turnaround parking lot, in order to ensure that in October this year, the village of Shangjiahe out of the immigrant relocation smoothly, by the A and B parties to the consultation, reached the following agreement.

First, the amount and content of the project

1, Party B is responsible for repairing the village 5 collapsed, collapsed road.

2, Party B is responsible for the construction of 3 places in the village can stop and turn around the site.

3, Party B is responsible for the maintenance of the village ferry in place to ensure the safe transition of people and vehicles.

Second, the quality of the project and requirements

1, Party B is responsible for the maintenance of the village road road, clearing the roadside landslides, improve the side of the ditch, fill the road surface.

2, Party B is responsible for the construction of an area of 40 square parking lot 3 and simple hardening.

Third, the project cost

Party B in the construction of machinery, labor, materials and other costs incurred in all costs of the implementation of the lump sum, *** counted RMB 70,000 yuan (¥ 70,000.00 yuan).

Fourth, the mode of payment

Party B construction is completed, by the A, B organizations acceptance, engineering qualified one-time payment of the project wuwan yuan (¥ 70,000.00 yuan).

Fifth, the responsibility for safety

Party B construction should pay attention to safety, in the construction of all casualties occurring in Party A does not bear any responsibility.

Sixth, the project duration

-- year -- month -- to -- year -- month --, *** -- days.

VII, legal responsibility

This agreement in duplicate, A, B, each side of a copy, with the same legal effect, the two sides must *** with compliance. The agreement must be negotiated by both parties to resolve any outstanding issues.

Party A: (signature)

Party B: (signature)

Legal representative:

Legal representative:

-- year -- month -- day

Maintenance works written contract sample 5

Party A:

Party B:

p> Office building due to the old, seriously affecting the work of all work. In order to create a good office environment, in order to strengthen the effectiveness of the construction, and further improve office efficiency, Party A decided to police station office building for maintenance. Now in accordance with the "Chinese People's *** and the State Contract Law", "Chinese People's *** and the State Construction Law", "Construction Quality Management Regulations", combined with the specific circumstances of the project, the two sides negotiated, on a voluntary basis, to enter into the following construction contract in order to *** with the observance of clear responsibility.

First, the project location: police station

Second, the project content and cost

1, the police station office building maintenance project content: office building paint painting, office aluminum windows and doors installation, roof waterproofing, installation of aluminum gates.

2, the project price payment and settlement

The project is a lump-sum contracting agreement, the total contract amount of 26,000 yuan (two hundred thousand six hundred thousand yuan), the shortfall is responsible for the settlement by Party B, the payment method using the progress of the reporting system, Party B with the tax invoice reporting, and then paid by the Party.

Third, the contracting method: package package materials

Fourth, the construction period: from 20 - month to month, *** counting calendar days. In case of force majeure reasons, can be postponed after confirmation by both parties.

V. Project Quality Requirements

1, Party B must be strictly in accordance with the promised quality standards of construction, not to meet the standards to be immediately rectified to ensure the quality of the project.

2, Party B shall provide Party A with a commitment to the materials used in the construction before construction, Party B in the construction of the materials used in the construction must be in accordance with the promised standard construction.

Six, Party A's work

1, in a timely manner to provide the conditions for the start of the construction site, coordination of Party B into the field, construction of water, electricity, and other issues.

2, designate a person responsible for construction site supervision, command, coordination.

VII, Party B's work

1, Party B shall provide Party A with a construction schedule before construction, confirmed by Party A, Party B must strictly according to the construction schedule.

2, a clear project leader is responsible for the site construction, strictly in accordance with the norms of construction, completion of the project in its entirety, Party B as far as possible to overcome the difficulties encountered in the construction of the site, in order to ensure that the completion of the project on schedule.

3, the construction of all safety responsibilities occurring during the construction has nothing to do with Party A, Party B is responsible for.

VIII, Party A in the construction process of the original design changes or Party B put forward rationalization proposals recognized by Party A, the resulting cost and duration of the issue, the two sides agreed to increase or decrease in accordance with the actual.

IX, breach of contract

1, Party B does not work in accordance with the provisions of the construction period, Party A may require rectification.

2, Party A shall not default on Party B's project payment without reason.

X. This agreement in triplicate, Party A and Party B each hold a copy, a file.

XI, this contract by the coordination of the two sides to resolve any outstanding issues. This contract in the fulfillment of the process of a dispute between A and B, can be resolved by the two sides of the negotiation, consensus fails, can be resolved by litigation. In the consultation or litigation period, not involved in the dispute part of the terms should continue to fulfill.

XII, this contract from the date of signature of both parties to enter into force, the completion and acceptance of the project and pay off the contract effect of natural termination.

Party A (official seal): _________

Legal representative (signature): _________

_________ year ____ month ____ day

Party B (official seal): _________

Legal representative (signature): _________

p> _________ year ____ month ____ day

Maintenance Works Written Contract Model 5 Related Articles :

★ Road Maintenance Written Contract Template 5

★ Simple Maintenance Contract Format Model 5

★ 2021 Maintenance Contract Latest Model 5

p> ★ Maintenance contract model 3

★ Plumbing maintenance written contract template 5

★ Maintenance project construction contract model

★ Maintenance contract model 5 latest

★ Daily repair and maintenance contract model 5

★ Maintenance service contract text 5

★ Equipment maintenance formal contract form 5 articles

★ Equipment maintenance formal contract form 5 articles