Equipment management system regulations?

Equipment management system regulations are very critical, familiar with the regulations in order to do the best, every detail should be carefully studied is very critical. Zhongda Consulting on the equipment management system regulations for everyone a brief introduction.

A new equipment management regulations

Article I of the company needs to increase the purchase of equipment approved by the purchase, shall be reported to the equipment management department for the record.

The second by the management of the feasibility of technical advice before determining the renovation project or additional electrical and mechanical equipment.

Article 3 in order to ensure the safe and rational use of equipment, there should be a part-time equipment manager, to assist the management of the department staff to manage the equipment, and guide the department's equipment users in accordance with the operating procedures for the correct use.

Article IV of the equipment project to determine or equipment purchased, the management department is responsible for organizing the construction and installation, and is responsible for the quality of construction and installation.

Article V of the construction and installation, by the management and the use of the department in charge of acceptance and fill out the "equipment acceptance registration form" before use.

Two, the use of equipment management regulations

Sixth, electrical machinery and equipment before use, equipment management personnel to cooperate with the Ministry of Personnel, the organization's operators to receive training in operation, maintenance is responsible for arranging the Department of technical personnel to explain.

Seventh, the use of personnel to achieve will operate, clear knowledge of routine maintenance and safety operation, familiar with the degree of equipment performance, the maintenance department issued equipment operating license, on duty operation.

Article VIII of the use of personnel to work in strict accordance with the operating procedures, conscientiously comply with the handover system, and accurately fill out the required operating records.

Article IX maintenance to assign personnel and the person in charge of each department, regularly check the equipment situation, and included in the staff work assessment.

Three, the transfer and scrapping of equipment management regulations

The tenth article of the equipment is old and obsolete does not meet the needs of the work or no reuse value, should apply for the report of damage, scrapping should be carried out before the technical appraisal and consultation.

Article 11 of the Ministry of Engineering assigned to the use of equipment, damage, impact on the work situation, residual value of the situation, the value of replacement of new equipment and sources of supply, such as identification and evaluation, fill in the opinion to the use of the department.

Article XII of the use of the department will be "scrapped, report the loss of the application form" attached to the letter of advice and reported, according to the procedures for approval.

Article XIII of the approval of the application, the new equipment in place, the old equipment loss, scrap.

Article XIV of the old equipment scrapped, scrapped by the Ministry of Management is responsible for disposal in accordance with relevant regulations.

Four, equipment accident analysis and treatment

Article XV of the equipment accident, the duty officer to the scene to see, deal with, and timely organization of repair.

The sixteenth equipment accident operators and the parties involved in the accident time, cause, damage to the equipment, the degree of impact, etc. to make a record to report to the person in charge.

Article 17 of the duty officer and the person in charge of the organization to analyze the accident, write an "accident analysis report", sign the treatment opinion, reported to the general manager in charge.

Article 18 of the major accidents, in accordance with the procedures for timely reporting.

Article 19 of the accident processing is completed, the shift supervisor will "accident analysis report" into the equipment file.

Article 20 of the man-made accidents should be in accordance with the circumstances of the "rewards and punishments" of the provisions of the Ordinance and the authority to deal with the responsible person to give administrative and economic sanctions.

Article 21 is a natural accident of the equipment, maintenance and processing, take protective measures.

Five, equipment maintenance regulations

Article 22 of the equipment supervisor to prepare equipment inspection and maintenance of six-month plan, fill out the "six-month equipment maintenance schedule", reported to the department manager for review and approval.

Article 23 of the engineering department manager review plan, submitted to the general manager, approved the implementation of the engineering department half-year equipment maintenance plan.

Article 24 of the equipment management personnel to prepare maintenance orders "monthly equipment maintenance schedule", and according to the contents of the monthly schedule, fill out the "maintenance application form", maintenance needs a part of the power, water, gas, but also fill out The "stop notification".

Article 25 of the duty personnel to fill out the "monthly equipment maintenance schedule", "maintenance application form", "stop the notice" and reported to the department manager, signing the comments, issued for implementation. The company's management team will be responsible for the implementation of the program.

Article 26 of the duty officer according to the approval of the monthly maintenance plan, the issuance of "equipment level maintenance task list", fill out the task list in the "content and requirements" column, arrange for specific personnel responsible for the implementation.

Article 27 in the "maintenance work record book" in the registration of the assigned project and time.

Sixth, the daily maintenance of equipment management

Article 28 of the company's electrical equipment failure, must fill out the "maintenance notice", signed by the director of maintenance.

Article 29 of the duty officer received a notice, immediately in the "daily maintenance work record book" on the registration of the time to receive the order, according to the urgency of the accident in a timely manner to arrange for the relevant personnel to deal with, and in the record book to register the time of dispatch.

Article 30 of the maintenance work is completed, the main repairer should fill in the "maintenance notification form", the competent personnel acceptance signature.

Article 31 of the completion of maintenance time, the timely maintenance of the content of the registration of the equipment card, and review the maintenance of the number of materials recorded in the calculation of the amount of materials used to fill in the single.

Article 32 will be dealt with the completion of the "maintenance notice" in order to paste the register on the title page.

Article 33 of the urgent maintenance of equipment, by the use of the department in charge of telephone notification to the Engineering Department, the first on-duty personnel to send personnel to repair, while the use of the department to make up for the "Maintenance Notification Form", the duty officer to make up for the records, and other procedures are the same.

Article 34 of the maintenance can not be repaired within two days, the supervisor on duty is responsible for the reasons indicated in the register, special measures should be taken to repair as soon as possible.