(2) The construction unit shall establish a project safety guarantee system. The project manager is the first person responsible for the safety production of this project and is fully responsible for the safety production of this project. The project should establish a graded safety production responsibility system with the first responsible person as the core. Personnel engaged in special operations shall be responsible for the safety production of this type of work. Before the project construction, the construction unit shall carry out safety technical disclosure, and the disclosed personnel shall sign the written disclosure, and accept the supervision and inspection of the safety management (www.chinatpm.net) personnel during the construction.
(3) The construction site is under closed management, and the construction safety protection measures meet the safety standards of construction projects. The construction unit shall take corresponding safety protection measures according to different construction stages and changes in surrounding environment and weather conditions. The construction unit shall set up safety warning signs that meet the national standards in the prominent or dangerous parts of the construction site.
(4) The construction unit shall provide special protection for adjacent buildings, structures and special facilities that may cause damage during the construction.
(5) If the construction site is temporarily shut down, the responsible party shall do a good job in site safety protection and bear the required expenses.
(6) The construction unit shall, in accordance with the provisions of the Fire Protection Law of People's Republic of China (PRC), establish and improve the fire control management system and set up effective fire control measures at the construction site. Special fire control measures should be taken when working in fire-prone parts or storing and using inflammable and explosive materials.
(7) The construction unit shall take measures at the construction site to prevent or reduce all kinds of dust. Exhaust gas, waste water, solid waste and noise. Pollution and harm of vibration to people and environment.
(8) The construction unit shall set up the working area and living area of the construction site respectively. The temporary buildings on the construction site should be designed and calculated, and the prefabricated trailer should have the product certificate. The project manager should be responsible for the safe use of the above buildings and trailer. The construction site should be equipped with necessary medical and first aid equipment. The food and drinking water supplied to workers must meet the hygiene standards.
(9) Operators shall abide by the safety standards, operating procedures and rules and regulations of construction projects, and must correctly use qualified safety protection appliances, mechanical equipment and other products when entering the construction site.
(10) Operators have the right to criticize, report and accuse the operating conditions, procedures and methods that endanger personal safety and health, and have the right to refuse illegal command. In case of emergency endangering personal safety, have the right to immediately stop operation and evacuate the dangerous area. Management personnel shall not command in violation of regulations.
(1 1) The construction unit shall establish a responsibility system for the procurement, use, regular inspection, repair and maintenance of safety protection appliances and mechanical equipment.
(l2) The construction unit must purchase safety protection articles and mechanical equipment with production license and product certificate. Before entering the site for use, the instruments and equipment must be inspected. Those that fail to pass the inspection shall not be put into use. Safety protection appliances and mechanical equipment on the construction site must be managed by special personnel and checked regularly according to standards and specifications. Repair and maintenance, and establish the corresponding data files.
(13) The vertical transportation and hoisting machinery and equipment entering the construction site shall be put into use only after passing the inspection by the inspection organization, which shall bear corresponding responsibilities for the inspection results.