Emergency plan for typhoon prevention work safety (Selected 6)
In our study, work or life, it is inevitable that there will be some accidents, in order to avoid the development of things in a worse direction, often have to prepare an excellent emergency plan in advance. So how should the emergency plan should be prepared to be appropriate? The following is I help you organize the emergency plan for typhoon prevention work safety (selected 6), welcome to read, I hope you can like.
Emergency plan for typhoon prevention work safety 1
(a) the division of responsibility for each position
1, the Security Department seriously do a good job in the storm emergency information transfer, resource deployment and related logistics support work.
2, engineering maintenance department is responsible for water supply and drainage, power supply, air conditioning, elevators and other electromechanical equipment failure and emergency treatment.
3, the property services company security and fire department is responsible for the "three defenses" and security, volunteer fire and other emergency response, and is also responsible for disaster relief work.
4, cleaning and greening department is responsible for greening, environmental protection and disaster recovery work.
(B) typhoon flood prevention and emergency treatment
1, the property services company received a typhoon or rainstorm warning signal notification, should be immediately mobilized urgently, the departments in a state of alert, while the establishment of the command team manager as commander-in-chief, the department heads as members of the three prevention of the temporary command, the relevant personnel should be implemented 24 hours a day. Duty system, make good preparations for flood control and flood relief.
2, before the typhoon or rainstorm, should do a good job of windproof, waterproof flooding measures, such as: emergency windproof, waterproof flooding work, close the public **** doors and windows, check and clean up the flood equipment, facilities, advertising signboards, flower pots and so on.
(1) Check whether all doors and windows, especially double-glazed doors, are adequately protected and stabilized.
(2) Secure all loose objects, especially those located on rooftops and balconies, and move indoors or tie down objects that are easily blown over, such as flower pots.
(3) Check all drains, manholes, stormwater drains, etc. and remove garbage, mud and debris that may cause blockage.
(4) Ensure that all emergency equipment is readily available, e.g. sandbags, raincoats, helmets, boots, ropes, back-up lighting, square logs (for securing glass doors), etc.
(5) Check that the drainage pump system is flowing properly.
(6) Check that the power generation system and its oil supply unit are normal or not, and test drive the generator set according to the protocol.
(7) Turn off the neon power.
(8) Intelligent system equipment for normal operation.
(9) The inspection is completed, and problems are found to be solved in a timely manner.
3, in the event of a typhoon, rainstorms, the security guard on duty to windproof, waterproof immersion key areas and parts of the strengthened patrol, check the status of doors and windows, such as issued by the window glass broken, as fast as possible to rush to the scene, and with the temporary sealing of the sheet. Engineering Department maintenance staff concentrated on standby, all levels of management services staff to hold their positions, if there is a complaint of equipment failure as well as the discovery of potential accidents should take urgent measures to solve them in a timely manner.
4, staff at all levels to assist maintenance technicians to do a good job of flooding and drainage of water.
5, in the typhoon, flooding and other natural disasters and accidents, to prevent the occurrence of crime cases.
(C) post-disaster treatment
After the typhoon, thunderstorms, the Ministry of Engineering to organize the maintenance of people in the jurisdiction of the equipment and facilities to check, found damaged and repaired in a timely manner. Cleaning Department to check the damage of the tree situation, and to restore, and strive to minimize the impact of the disaster. The property manager reported to the general manager of the company in a timely manner on the damage and losses.
Emergency plan for typhoon prevention work safety2To ensure the safety of all teachers and young children's lives and property, to ensure the healthy and harmonious development of education and sports, to do a good job in our park on the prevention of rainstorms, floods, typhoons and the disposal of disasters, to ensure that the rescue and relief work is carried out in a scientific, orderly and efficient way, and to improve the comprehensive emergency response capacity of flood and typhoon prevention and disposal. According to the Zichuan District Bureau of Education and Sports documents, combined with the actuality of our park, specially formulated this plan.
First, the establishment of the flood and typhoon rescue and relief leadership group
Leader:
Deputy Leader:
Members: teachers of all classes
Second, the emergency leadership group division of labor
Leader's responsibility: Under the leadership of the relevant departments of the higher level, carry out the implementation of the district's emergency management system. Under the leadership of the department, the implementation of the district flood control and typhoon rescue and relief flood control headquarters instructions, the overall command of the Zihe Center Kindergarten rescue and relief work.
Deputy head of the responsibility: according to the kindergarten risk, put forward the drainage, rescue program. Timely reporting to the central school security office, analysis and summary of the disaster, to provide a scientific basis for decision-making team leader. According to the instructions of the team leader, command the rescue team to carry out rescue. Organize enough emergency supplies to be delivered to the rescue school site. Contact the medical department, mobilize medical personnel, medical equipment, medical teams to participate in the school rescue and relief work. Contact the public security department to maintain school traffic order, organize the evacuation and transfer of young children and garden staff.
Responsibilities of the members
1 comprehensive grasp of the disaster and various types of dynamic news, according to the important information reporting system in the first time to send important information about the disaster, to ensure that the information channel is open.
2 is responsible for checking the implementation of the class disaster prevention measures, to maintain the normal order of the class teaching and activities.
3 in accordance with the requirements of the higher level, do a good job in the park disaster relief work, to stabilize the mood of the children, so that all the work is carried out smoothly.
3, the implementation of the flood season, the typhoon during the schools responsible for the emergency measures to strengthen the flood control and rescue efforts.
1. According to the principle of "who is in charge, who is responsible for", the organization of flood and typhoon working group, the implementation of the necessary rescue measures, the strict implementation of flood and typhoon work.
2. Pay attention to listen to and record weather forecasts, take precautions in a timely manner, close doors and windows and electrical equipment in a timely manner.
3. In case of danger, disaster, should be based on the work plan, the organization to carry out rescue work, and immediately reported to the next level.
4. The implementation of leadership, 24-hour duty, immediately on duty, flood control and typhoon prevention work, and waterlogged sections of the erection of a temporary walkway, should be quickly and independently rescue, to ensure the safety of young children.
Contingency plan for typhoon prevention work safety 3A. Guiding ideology:
Typhoon prevention, rainstorm work is related to the lives of teachers and students and national property safety important work, in order to effectively protect the safety of teachers and students and property safety, enhance the kindergarten flood control and typhoon prevention capabilities, in line with the "prevention-oriented, safety first" principle, the development of this plan.
II. Preventive steps:
1, the leading group list and contact number
Leader: Bi Yijun director
Members: Gong Fei logistics team leader
Yao Yihua director of preservation
Zhang Yan, chairman of the labor union
Kindergarten started the flood prevention and control of Taiwan flood prevention plan, the implementation of the 24-hour leadership, 24 on-duty system.
III. Emergency measures:
1. Strengthen the communication of information, to achieve the upper situation, the lower situation reported.
In the event of a major flood, all the leaders in place, flood control and Taiwan work leading group began to operate; the leaders in charge of flood control and Taiwan work leading group to report on the flood; the full deployment of anti-Taiwan flood control work.
2. Prevention-oriented:
Clear the corridor. Before the typhoon landed, the balcony, corridor debris, flower pots, etc. should be cleaned up to prevent the typhoon landed, was blown down by the wind to hurt people.
Close the doors and windows. When a typhoon or rainstorm comes, the wind and rainfall are large, so you should close the doors and windows to prevent the wind and rain from damaging the doors, windows, furniture and causing casualties.
The janitor of the whole school sewer and the main catchment well to carry out a comprehensive dredging.
Unclogging of guttering and downpipes on school buildings and houses, and pruning and strengthening of large trees throughout the school.
A comprehensive safety check of lightning protection facilities and outdoor wiring on all school buildings.
Comprehensive safety inspection of outdoor antennas, air conditioning outdoor units, and external hangings.
Indoor power supply, sockets, doors and windows of all departments to do a comprehensive inspection.
When circuits and wires are interrupted due to a typhoon, power switches should be turned off and emergency lights, torches or candles should be activated.
IV. Safeguards:
After the plan is activated, the kindergarten to do a good job of early warning and information records. Convene an emergency meeting, in the shortest possible time, by telephone and other forms of kindergarten flood control and Taiwan work deployment, inform the Taiwan flood dynamics, the arrangement of flood control and Taiwan, rescue and relief requirements and tasks.
At any time with the higher departments and units to maintain close contact, strengthen information communication, to do the upper situation, the lower situation reported.
Emergency plan for typhoon prevention work safety 4
In order to effectively do a good job in the town of xx xx hazardous rock body unstable slopes and half of the mountain hazardous rock body unstable slopes geologic disaster point prevention and control, maximize the mitigation of accidents and disasters, to avoid the masses of personal safety and property suffered losses, is now combined with the actual situation of the town, and specially formulated the following emergency rescue plan.
A disaster point situation
(a) xx dangerous rock body unstable slope
xx dangerous rock body unstable slope is located in the town of Liyang Longshan Temple back of the mountain, the top of the mountain there are a few bumps of dangerous rock, affecting the Longshan Temple personnel and property safety. In the event of prolonged heavy rainfall may occur landslides, in the event of prolonged heavy rainfall timely notification of the evacuation of people in the Longshan Temple.
(B) half of the mountain dangerous rock body unstable slope
half of the mountain dangerous rock body unstable slope is located in the town of Liyang Xiaolongshan south, the half of the mountain is almost vertical, the surface of the surface of a lot of raised rock, very easy to fall, dangerous rock near the Huangshan City Special Police School and residential houses. In case of prolonged heavy rainfall may occur landslides. The first thing you need to do is to get a good look at the color of the skin and the texture of the skin, and the color of the skin.
Second, the emergency work leading group
Leader:
Deputy Leader:
Members:
Third, the response and action of the emergency
(a) Emergency personnel
Detecting people:
Contact person:
Transfer personnel: Shi Chengzhong
(ii) emergency response team:
(iii) emergency material reserves
The town's main flood control and disaster relief materials: 12 sets of raincoats, 12 steel helmets, folding rechargeable recording shouting microphone 4, shovels 10, sacks 100, a number of sand. The above flood control materials stored in the town apparatus room, by comrade Lin Tianyou unified deployment.
(D) emergency response:
1, the town of flood control and disaster relief leading group held a meeting to urgently inform the jurisdiction of the disaster and relief work, analyze and predict the possible emergence of larger disasters, the deployment of the jurisdiction of disaster relief work. Immediately the jurisdiction of the disaster and disaster relief work reported to the district people's government and the district flood control and drought relief headquarters, requesting support from the district government.
2, the organization of the town staff according to the degree of urgency of the flood season, the use of telephone, cell phone text messaging, shouting microphone and other means of timely notification of flood information to the residents; special emergency situation or power supply, communication interruptions, divided into households to notify the residents of disaster-prone points, especially at night when the relevant disaster may occur, to ensure the reliability of information transfer, so as not to omit a household, do not miss a person.
3, emergency personnel according to their respective job duties and tasks, received a disaster weather forecast, to be on standby at all times, not to go out, received a collection of orders, should be rushed to the designated location within 15 minutes, in accordance with the command of the rescue organization.
4, the release of the disaster. The town command office to summarize the disaster, reported to the district flood control and drought relief headquarters.
Fourth, the post-disaster relief work
1, timely production and life of self-help work conference, quickly organize the restoration of production, life and other work.
2, seriously organize the work of disaster investigation and verification, focusing on the verification of the disaster caused by the collapse of the house, especially the total collapse of households and other special victims of the loss.
3, according to the verification of the disaster, the development of disaster relief programs, step by step implementation.
Fifth, the basic requirements of flood control and rescue work and work discipline
1, the Office of the Leading Group of Flood Control and Disaster Relief in the implementation of flood control during the twenty-four-hour duty system. Strict work discipline, conscientiously make a good duty record, timely reporting down. Command members in the flood control period, if there is something out of the need to leave the local, must be approved by the unit principal, and arrange for their own responsibility within the scope of the flood control work.
2, the person in charge of flood control and disaster prevention work is responsible for, must ensure that the phone is open 24 hours a day, the arrangements for the jurisdiction of the duty duty, supervise the duty record, duty handover, etc., found that the danger should be reported within 30 minutes, shall not be delayed rescue work.
3, where the flood duty and flood rescue and relief work, negligence, irresponsibility, reporting delays or personnel are not in place in a timely manner, we must seriously investigate the responsibility of the relevant personnel; serious consequences, according to the law, to investigate the responsibility of the main responsible person.
`emergency plan to prevent typhoon work safety 5To implement the Civil Aviation Administration of East China "on doing a good job in flood control and typhoon prevention work notice" spirit and the relevant requirements of local governments at all levels, combined with the "Weihai Airport Flood and Typhoon Emergency Response Plan", the development of this plan, the airport to prevent the frontal attack of the typhoon emergency plan.
This plan is used in conjunction with the Weihai Airport Flood and Typhoon Emergency Plan.
First, the principle of work
In accordance with the typhoon before the arrival of the "defense" based on the arrival of the typhoon to "avoid" based on the typhoon, the typhoon after the "rescue" principle.
In accordance with the principle of "prevention" before the arrival of the typhoon to "avoid" the main, after the typhoon to "save" the main principle, organized to carry out a good job to prevent the typhoon frontal attack of emergency response.
The second organization
Weihai Airport to prevent the typhoon front attack of the emergency response work in Weihai Airport Flood Control and Typhoon Rescue Command under the unified leadership.
Third, the duties of each department
When the typhoon attacked the early warning notice, in Weihai Airport Flood and Typhoon Risk Prevention Command under the unified leadership of the departments to act quickly, in accordance with their respective responsibilities, to do a good job of all the "prevention", "Avoid", "save" the preparation and implementation of the work. The duties of each department are as follows:
1. Airport Office: After receiving the warning notice of typhoon attack, inform the company leaders and airport departments in a timely manner. After asking the company leadership to agree, start the plan, arrange personnel on duty, assume the Weihai Airport Flood and Typhoon Rescue Command Office duties.
2. Site Command Center: After receiving the warning of typhoon attack and start the plan notification, in a timely manner, in conjunction with the Airport Construction Management Office, Mechanical Security Office and security checkpoints, to do a good job of parked aircraft, apron facilities and equipment of the tie-ups, reinforcement, or removal of the work, and timely report the situation to the Weihai Airport Flood and Typhoon Disaster Prevention and Control Command Office.
3. Aviation Management Center: After receiving the warning notice of the typhoon attack, do a good job of pre-arrival flights to prepare for the landing and the presence of flights on the transfer of the liaison matters; the navigation station site of the wind in addition to the risk of drainage and reinforcement, etc.; to do a good job of emergency communications security; in accordance with the requirements of the Bureau of the implementation of the airport air traffic control to prevent the front of the typhoon attack on the contents of the plan.
4. Mechanical Security Division: After receiving the warning notice of typhoon attack, in accordance with the requirements of the "Mechanical Security Division of the wind damage prevention emergency plan", tied up parked aircraft, special vehicles should be stored in the warehouse, can not be stored in the warehouse of special vehicles should be far away from tied up aircraft, parked in the leeward side, to set up a good brakes and add the wheelblock. Equipment and facilities on the apron should also take windproof measures to prevent collision cones into storage, traction poles and work ladders should be in storage or tethered to prevent the wind from blowing and damaging other facilities, planning program "Airport Emergency Plan to Prevent Frontal Attacks by Typhoons". Strengthen the staff on duty and keep communications open.
5. Airport Construction Management Office: After receiving the warning notice of typhoon attack, strengthen the protection of the power supply system, make good preparations for power repair, to ensure that the power supply is normal. Equipment and facilities on the apron to take windproof measures. Immediately after the gale, inspect the flight area field paths and lighting facilities to prepare for the opening of the airport.
6. Security checkpoints: After receiving the warning notice of typhoon attack, make the corridor bridge reinforcement tether to prevent accidents.
7. Cargo Center: After receiving the warning notice of the typhoon attack, the cargo equipment and facilities outside the cargo warehouse to take windproof measures, the cargo equipment and facilities on the apron transferred to the cargo warehouse.
8. Airport Public Security Bureau: After receiving the warning notice of typhoon attack, timely fire vehicles and air defense guard vehicles all into the warehouse or parked in the leeward place, to set the brakes and add wheel block. All the police in a state of readiness, ready to wait for the Weihai Airport flood control and typhoon rescue headquarters to participate in rescue work.
9. Other departments: according to the "Weihai Airport Flood and Typhoon Emergency Response Plan" of the duty requirements, standby duty, to maintain smooth communication.
Four, work requirements
1. Responsibility in place, a clear division of labor. Airport departments can be based on the "Weihai Airport Flood and Typhoon Emergency Plan" and "Weihai Airport Emergency Plan to prevent a frontal attack of the typhoon" to develop departmental implementation rules, clear responsibility and specific person in charge, will be determined by the plan of the various typhoon task decomposition and implementation of the specific responsibility, the formation of horizontal to the side, vertical to the end of the work of the network and flexible and efficient `contact response mechanism.
2. Well-prepared, strong measures. All departments should organize experienced and competent personnel for responding to emergencies according to the typhoon prevention plan. When a strong typhoon strikes the airport head-on or affects the airport, emergency rescue personnel should be assembled at the specified time to standby to get ready for the battle, emergency supplies, equipment, means of transportation, etc. are arranged to the front line in order to be called in an emergency. Promptly report to the municipal emergency office, contact the socialized reserves of emergency supplies, equipment and tools, etc., to prepare for emergencies.
3. Strengthen alert, timely disposal. Flood and typhoon rescue headquarters office to arrange personnel to grasp and develop the dynamics of the flood situation, encountered ultra-alert, abnormal or dangerous timely report, and seize the organization of evacuation, repair, reinforcement, encountered in emergency situations, in the report of the superiors at the same time, should take the initiative to take emergency measures, seize the favorable opportunity to implement the emergency disposal, eliminate hidden dangers.
4. Emergency duty, smooth communication. After receiving the warning notice of the typhoon attack, the flood control and typhoon rescue headquarters office and departments to implement 24-hour duty system, to keep the information open, the head of each department and the department responsible for the work of typhoon prevention cell phone on day and night, the whole tracking rain, water, wind, disaster and secondary disasters, timely consultation, and according to different situations to start the relevant emergency procedures.
V. Appendix
1. This plan by the airport company is responsible for the interpretation and implementation of the organization. And according to changes in the actual situation and timely revision.
2. This plan is implemented since the date of publication.
Emergency plan for typhoon work safety6
I. Purpose:
The establishment of flood prevention, typhoon rescue emergency plan, through the training of the emergency response detachment and hands-on training, to strengthen the management of the service area of the ability to prevent flooding and rescue in the case of a dangerous situation occurs in a more effective and timely exclusion of the damage will be reduced to a minimum, to ensure that the flood control, anti-typhoon rescue work without fail. The company's management team has been working hard to ensure the safety of its products and services, and has been working hard to ensure the safety of its products and services.
Second, responsibilities:
Management Director for flood control, typhoon rescue commander-in-chief;
Management Director for the deputy commander-in-chief, is responsible for the overall work of the equipment group;
Safety host for the deputy commander-in-chief, is responsible for the overall work of the rescue group;
Environment host for the deputy commander-in-chief, is responsible for the overall work of the logistics group;
The environment is responsible for the overall work of the logistics group;
The management director is the deputy commander-in-chief, is responsible for the overall work of the flood control and typhoon prevention and management.
The control center is responsible for the accurate communication of information and coordination;
All off-duty staff of the management office are flood and typhoon emergency response team members.
Third, the division of group responsibilities:
3.1 rescue group: by the safety host and not on duty all the safety members of the group
3.1.1 to take all the measures to deal with the danger;
3.1.2 responsible for flood sandbags filling, handling and stacking;
3.1.3 Utilize various ways and means to remove the danger in time.
3.1.4 personnel division of labor
3.1.4.1 not on duty two center post is responsible for loading sandbags;
3.1.4.2 not on duty two two No. 2, No. 3, No. 4 post is responsible for transporting sandbags;
3.1.4.3 not on duty two No. 6, No. 8 is responsible for the site of the stacking of sandbags and other measures to take to the rescue;
3.1.4.3 not on duty two No. 6, No. 8 is responsible for stacking sandbags and other measures to rescue;
3.1.4.4 safety organizer to lead the rescue team to take all other effective methods to do all kinds of rescue work.
3.2 equipment group: by the management office supervisor and management office of two technicians.
3.2.1 is responsible for all kinds of pumps and power supply equipment on;
3.2.2 the rescue site for technical guidance;
3.2.3 on-site equipment for emergency repair.
3.3 Logistics group: consists of environmental organizers, housekeeping attendants, lifeguards, front desk attendants, cashiers, clubhouse attendants.
3.3.1 Guarantee the normal supply of various types of relief supplies;
3.3.2 Responsible for on-site rescue of the injured;
3.3.3 Actively assist the other groups;
3.3.4 Division of labor
3.3.4.1 Undisplaced two five posts are responsible for the protection of the logistical supplies;
3.3. 4.2 front desk attendant, cashier, clubhouse attendant is responsible for the evacuation of the masses and rescue the injured, transfer the injured to a safe location and timely report to the city emergency center;
3.3.4.3 lifeguards and domestic helpers are responsible for the property salvage.
3.4 On-duty personnel
4.1.1 On-duty personnel found dangerous situations should be promptly notified to the center and the shift supervisor on duty;
4.1.2 The center duty officer receives the information to take emergency assembly and other measures to convene the non-duty personnel to promptly discharged the dangerous situation;
4.1.3 The center duty officer should be the first time to notify the manager of the management office and the management office supervisor and the safety organizer;
4.1.4 The center watchman must be on duty to all positions to inform the situation;
4.1.5 on-site positions should be done to maintain order and people and vehicles channeling;
4.1.6 The center watchman should be closely monitor the situation on the scene, and if necessary, to seek other support.
4.1.7 Before the typhoon, the management office positions need to carefully check the position within the scope of the existence of potential safety hazards, and timely elimination of dangerous situations, the situation is serious and timely report to the superiors.
Note: All members must obey orders, follow the command; all members of the rescue process need to pay attention to their own safety.
;