Mechanic production safety responsibility letter

Mechanic safety production responsibility letter

In the progressive society, in many cases we will come into contact with the responsibility letter, the responsibility letter can let everyone know that the completion of the goal is everyone's business, to be of one mind, unity and solidarity. Then the format of the responsibility letter, you mastered it? The following is my collection and organization of the mechanic safety production responsibility letter, welcome to read, I hope you can enjoy.

Mechanic safety production responsibility letter 1

In order to ensure the safety of learning hydropower station lifting machinery, in accordance with the relevant laws and regulations of lifting machinery, the following responsibilities:

First, in strict accordance with the "Regulations on the supervision of the safety of special equipment" and "quality and safety supervision of special equipment regulations" and related documents.

Second, according to the provisions of the inspection and examination of lifting machinery.

Third, licensed to work, to eliminate unlicensed operation.

Fourth, to ensure that the good working condition of the lifting machine.

V. Crane is strictly prohibited with "sick" work; problems should be dealt with in a timely manner, can not be dealt with `, to be reported in a timely manner.

Six, it is strictly prohibited to operate under the influence of alcohol, to maintain a clear mind.

VII, shall not arbitrarily change the structure, parameters, performance, location of lifting machinery.

VIII, according to the provisions of the operating records of lifting machinery, maintenance records, fault records and maintenance records.

ix. Validity: the date of this signature to the next signature date.

X. The above statement of responsibility in triplicate, each party holds a copy of the A and B, to the company's technical department of a file.

Mechanical production safety responsibility 2

Project Name:

Equipment Name:

According to the relevant provisions of the company's equipment management, the project department to ensure that the following work:

1, installation, dismantling, jacking operations before the contract, program and other relevant information must be reported to the production office for approval.

2, before installation, the organization of the installation unit of the equipment foundation acceptance, reported to the production office for review.

3, installation and dismantling units must handle the City Safety Supervision Station, "Nanning City, the construction of lifting equipment installation notice", "Nanning City, the construction of lifting equipment dismantling notice", reported to the Production Division for review before entering the site construction.

4, the lifting equipment installation, demolition, jacking attached to the wall of the whole operation monitoring, each jacking attached to the wall acceptance data reported to the company's production department.

5, lifting equipment installation, dismantling, jacking attached to the wall one day before the operation, reported to the company's production department for inspection.

6, installation, demolition, jacking attached to the wall of the operating unit of the management personnel, demolition of the list of personnel, the induction card, safety and technical briefings should be one-to-one correspondence, must be consistent with the "Nanning City, the construction of lifting equipment installation notice", "Nanning City, the construction of lifting equipment demolition notice" and the program. The relevant installation and dismantling management personnel, safety officers, installation and dismantling personnel sign on the sign-in sheet every day. No construction is allowed without management personnel on site. Every day, the installation and demolition management personnel, safety officers and demolition personnel on duty to sign in, installation, demolition, lifting the wall attached to the process of video records transmitted to the company's production department.

7, each maintenance image records, fall safety device fall test image records to the production office.

8, mounting, dismantling, jacking attached to the wall operators must be equipped with a safety belt, do not buckle the safety belt is not allowed to carry out construction.

9, mounting, dismantling, jacking wall attached to the lifting equipment around the operation must be safely protected, set up safety warning signs.

10, in accordance with the company's unified provisions of the production and installation of unloading platform protection door, hanging the company's unified logo, hanging the use of engineering lifting machinery notice board. Construction lifts, material hoists installed floor call, signaling system.

11, the implementation of management regulations, do not listen to the installation of units, immediately report to the company's production office.

12, crane operators, Division ropeworkers to carry out operations must wear a safety vest.

12, the project department to pay 500 yuan to the production office as a deposit to implement the safety responsibility, according to the provisions of the completion of the equipment removal returned, violation of any of the above provisions, the deposit shall not be refunded.

Mechanical production safety responsibility 3

Construction unit (Party A):

Installation unit (Party B): xxx construction engineering limited liability company

In order to ensure the safety of construction cranes in the installation and dismantling of safety, to clarify the safety responsibilities of A and B, according to the A and B parties agreed to negotiate, hereby sign the safety of construction cranes installation, dismantling agreement.

Project Name:

Project Address:

Scope of the project:

Term of the agreement: the completion of the project agreement is automatically lifted

A (Party A) should fulfill the following safety responsibilities:

(a) to the installation of the installation unit to provide the location of the equipment to be installed in the foundation of the construction information to ensure that construction of lifting machinery into the field installation, Demolition of construction conditions required;

(b) review of construction hoisting machinery, special equipment manufacturing license, product certification, manufacturing supervision and inspection certificates, record certificates and other documents;

(c) review of the installation unit, the use of the unit's qualification certificate, safety production license and special operators of special operating qualifications;

(d) review of the installation unit to develop the construction hoisting machinery installation, safety and health of the construction hoisting machinery. (D) review the installation unit developed by the construction of lifting machinery installation, dismantling of special construction projects and production safety accidents and emergency rescue plan;

(E) review the use of units developed by the construction of lifting machinery production safety accidents should be

emergency rescue plan;

(F) designate a full-time safety management personnel to supervise and inspect the installation of construction lifting machinery, dismantling, the use of;

(VII) construction site has more than one tower crane operations, should be organized to develop and implement safety measures to prevent tower cranes collide with each other.

Second, (Party B) shall perform the following safety duties:

(a) in accordance with safety and technical standards and performance requirements of construction cranes, the preparation of construction crane installation, dismantling of construction projects special construction program, and signed by the unit's technical director;

(b) in accordance with safety and technical standards and installation and use of manuals and other inspection of building cranes and construction site Conditions;

(C) the organization of safety construction technology and sign to confirm;

(D) the development of construction crane installation, demolition project emergency rescue plan for production safety accidents;

(E) will be the installation of construction cranes, demolition of construction projects, installation, demolition of the list of personnel, installation, demolition time, and other materials reported to the general contractor for the construction unit and the supervisory Unit review, inform the construction department of the local people's government at or above the county level where the project is located.

Third, Party B construction personnel violated the relevant safety regulations, Party A security department has the right to correct and stop, the right to notify Party B and give financial penalties, until the cessation of Party B's work.

Fourth, party B will be responsible for the safety accidents caused by party B's construction personnel violating the operating procedures.

V. Safety accidents caused by Party A's failure to fulfill its safety responsibilities, Party A shall bear the corresponding responsibility.

This statement of responsibility in a single four copies, by the Party A, Party B, two copies each.

Party A: (seal) Party B: (seal)

Entrusted agent: Entrusted agent:

;