The neighborhood comprehensive power outage emergency response plan general (9 articles)

Enhance the awareness of disaster prevention and mitigation, improve disaster prevention and mitigation skills. In order to further improve the efficiency of emergency rescue and other work, you can develop and improve the relevant emergency plan in advance. Do you know what key points to write a good emergency plan? After searching and organizing, I present you with a comprehensive power outage emergency response plan, but I hope to bring help to your study and work.

District comprehensive power outage emergency disposal plan Part 1

Foreknowledge of power outages:

1. In the event of a power outage notice, the service center should be in advance of the blackout line, area, time, elevator use, and safety precautions required to notify the use of community radio to notify each household and commercial tenants, and in the main entrances and exits of the power outage notice;

2, notify the Ministry of Engineering to do a good job of the power outage Before the contingency work, such as: electricity closed elevator, debugging standby diesel generators.

Unpredicted power outage:

1. In the absence of any notification, the sudden occurrence of power outages, the Engineering Department should immediately confirm that the internal failure of power outages or external power outages. If it is an internal fault blackout, should immediately send people to find the cause of measures to prevent the expansion of the fault; if it is an external blackout, on the one hand, to prevent a sudden call to cause accidents, on the one hand, call the Power Authority to inquire about the blackout, to understand when the power supply will be restored, and the understanding of the situation will be notified to the Ministry of Management.

2. The Order Maintenance Department and the Engineering Department immediately sent people to each building to check the operation of the elevator, and found that the elevator was trapped immediately in accordance with the emergency plan for elevator trapping rescue.

3. The Management Department will immediately notify the important commercial tenants in the district by phone of the power outage, and if a backup generator is activated, it can be notified using the community radio. If the power outage lasts for a longer period of time, it is necessary to publish a power outage notice at the main entrances and exits.

5. If a sudden power outage, when the mall is open at night, the security department should help the mall to maintain order, guide merchants to enable emergency lighting, candles and other back-up lighting, evacuate customers, and pay attention to fire prevention to prevent fires, and assist the mall management to do a good job of safety precautions.

6. If necessary, arrange staff to the main entrances and exits of the district, the elevator hall to maintain order, the Department of Order Maintenance should strengthen the security measures, to prevent people from creating chaos, fish in troubled waters, and if necessary, close the door.

7. Send people to guard the office, duty room, patiently receive residents and merchants inquiries, do a good job of explaining and guiding the work, to prevent conflict with the residents and merchants.

8. Engineering Department to record the beginning and end of the incident, the cause of the incident, the response and the damage caused.

9. Preventive measures for sudden power failure:

1) Engineering Department should always check the emergency lighting and emergency broadcasting system to make sure it is normal.

2) The management department should remind the office building tenants and commercial tenants to prepare some emergency lighting or candles in case of power failure.

3) Order Maintenance Department, Engineering Department in addition to the configuration of patrol, maintenance of the torch, should also be equipped with portable emergency lighting, and when charging and maintenance, to keep intact.

10, if the power outage time is too long, when necessary, consult the management of the relevant leadership, whether to open the backup power supply system.

11, in the confirmation of the duration of the power outage, to notify the residents and commercial tenants, pay attention to water storage, to avoid paralysis due to the secondary water supply system can not lead to normal water supply.

12, in the event of an abnormal system outside the power outage, power supply, the need to community in addition to office buildings, all elevators to stop running, in order to prevent the elevator off people, and arrange for staff to stay in the operation of the elevator until the power supply is normal.

Foreknowledge of water shutdown:

1, the service center in the water supply company received a notice of water shutdown, should be immediately in advance of the community broadcasting and in the building of the notice posted on the bulletin board of the water shutdown.

2, the content of the water notice must include: cause the cause of water supply suspension, water supply is expected to stop, water supply time, to remind households, stores to do a good job of water storage, pay attention to close the indoor faucet or valve.

3, such as community life cisterns, and the use of the second pressurized system, can be flexible to use timed water supply.

Unpredicted water outage:

After receiving a call from a resident or finding a water outage, immediately arrange for the engineering staff to check the cause of the failure of the equipment or water inlet pipe, such as equipment failure should immediately identify the cause of the reason for the exclusion of the cause of the immediate treatment, the need for a long time to repair, immediately notify the service center, posting notices, and community broadcasting. Because of the water supply pipe no water problem, should immediately contact the water supply company, to understand the situation, and community broadcasting, such as water outage time is longer, need to post a notice of water outage.

District comprehensive power outage emergency response plan Part 2

1, timely repair and reporting requirements

(1) restaurants, production departments in the event of an unexpected power outage, we must adhere to the principle of internal tightening and external loosening of the power outage, call the Ministry of Engineering in a timely manner to explain the location of the power outage and the scope of the impact involved, and do a good job each other to answer the phone personnel's work number and time records;

(2) timely reporting of power outage location and power outage to the Director of the Food and Beverage Department/Executive Chef/and the Duty Manager. Duty Manager to report the location of the power outage and the scope of the impact involved;

(3) notify the lobby assistant manager, security department, finance department and other relevant departments to do business safety and coordination, and make relevant text records;

(4) by the department director to report to the general manager's office in a timely manner;

(5) the departmental duty manager / duty chef to the site of each power outage immediately, directing the implementation of emergency program implementation, and strengthen communication with the Engineering Department, Security Department duty manager, lobby assistant manager, to solve special events.

2, emergency measures to be taken

(1) restaurant, kitchen manager on duty, chef to the scene command, according to each hall, kitchen emergency procedures to allocate the foreman, the staff of the strain work;

(2) foreman / chef management personnel should immediately implement the emergency lighting system, control of the doorway and all the fire escapes, to strengthen the inspection, pay close attention to the guest situation, if a guest enters, should be To guests to make a good explanation, please guests to understand, to be stabilized before making arrangements;

(3) to stabilize the mood of dining guests, and guests to do a good job of explaining the work, to persuade guests to minimize the movement, and pay attention to keep their valuables;

(4) in the dining room and buffet table placed on the lighting of the candles to be aware of the safety measures;

(5) on the guests have ordered the dishes, such as can not be made in time. dishes, such as can not be produced in a timely manner, should be recommended to guests to change other dishes;

(6) and the kitchen and the Department of Wine and Liquor Department to do a good job of communication to ensure that the service can operate normally;

(7) in the period of blackout, the halls in accordance with the actual situation, to deal with the work of the checkout with the guests to achieve accuracy, the guests to leave the restaurant, prompting guests to leave the restaurant with the bottom sheet of the billing, the waiters responsible for the service to be The waiter in charge of service should do a good job of sending off the guests. Control the door of the management personnel should be polite verification of the guest's bill, and the hotel power outage to guests to apologize for the inconvenience;

(8) on the daily operation of the ministries to control their own electrical switches disconnected, to avoid the restoration of the power supply voltage instability or repeated power supply, power outages caused by damage to equipment, such as: multi-functional cooking stoves, induction stoves, blowers, "sashimi" freezers, rice cookers, and so on to ensure that equipment The intact use;

(9) to pay attention to protect the scene of the accident, immediately notify the relevant departments to deal with, and notify the Director of Food and Beverage;

(10) may be affected by the food for emergency treatment to ensure food hygiene and safety;

(11) Kitchen, the Ministry of Stewardship should be in control of the business and the restaurant side of the convergence of the main dishes, collect and remove the tableware under the column, and pay attention to the safety of production.

3, after the restoration of power supply work requirements:

(1). Notify the director of the catering department / executive chef and duty manager, lobby assistant manager, its restaurant, kitchen restoration of power supply;

(2) restaurant duty manager, chef to direct the staff to resume normal operation as soon as possible;

(3) the restaurants, kitchens depending on the power supply to restore the voltage stabilization of the switch on the equipment and check the operation;

(4) due to the blackout of the impact of the deterioration of the food To be dealt with in a timely manner, and make a good written record;

(5) restaurant managers take the initiative to the site of the guests on the inconvenience caused by the power outage of guests to apologize, and thank the guests for their understanding and cooperation;

District comprehensive power outage emergency response plan Part 3

First, the power outage disposal plan

l, the hospital should be taken in a bidirectional power supply and its own generator sets, once the municipal power supply failure, then the hospital immediately generate power. The hospital will immediately generate electricity.

2, due to power supply equipment failure caused by power outages, should be organized in a timely manner to repair the scope of power outages will be minimized.

3, the Department of Logistics and Security and the relevant power sector coordination, power outages should be notified in advance before the hospital electrician class, ready to generate their own power generation.

4, clinical departments are routinely equipped with lighting, regular inspection, to maintain a perfect state.

5, after receiving the notice, immediately do a good job in preparation for the blackout. If there is a rescue patient to use electric power machine, need to find alternative methods.

6, after a sudden blackout, immediately look for ways to rescue the patient's machine running power, to maintain the rescue work, and open the emergency lights lighting, etc.; at the same time, start the spontaneous power.

7, with the power supply department to contact, inquire about the cause and time of the power outage.

8, the hospital's own generator need to pay attention to the maintenance of timely maintenance, to ensure that at any time you can generate power for clinical emergency.

9, in the event of electric shock or electric fire should immediately cut off the power supply; will be electrocuted immediately sent to the hospital rescue and dial 119 fire alarm.

Second, the organization of measures:

1, alarm: the occurrence of electricity fire should be immediately to the fire department alarm and report to the relevant departments, and to the section chiefs, hospital leadership report. And organize forces to save lives.

2, alarm telephone:

Fire: 119

Ambulance: 96120

Office: xxxxxx

Security Section Duty Room: xxxxxx

3, the organization and division of personnel:

On-duty electrician: after receiving the municipal power outage notification, you should notify the relevant departments and personnel, and Do spontaneous power supply preparation.

Shift supervisor: responsible for accident rescue and emergency treatment, arrange for personnel to rescue the injured; organization of hair, send power.

Section director: the scene commander-in-chief.

Electricity technicians, maintenance workers: to assist the director to participate in the rescue.

Other personnel: involved in rescue, protection of the accident scene.

Guards: responsible for guarding and maintaining order.

Third, the organization:

Group Leader: Weng Guanyu

Deputy Group Leader: Pan Guowei Huang Guoxing

Members: Wang Yonghua Ji Jinwang plumbers and electricians

Comprehensive power outage emergency response plan Part 4

A sudden water emergency

1 duty engineering staff received a notice of the water supply of the tenants or merchants, you must immediately rushed to the site of the water outage. After receiving the notice of water suspension from the owner or businessman, the engineering staff on duty must immediately rush to the site of water suspension to understand in detail the scope of water suspension and the related water suspension situation.

2 on-duty engineering staff immediately went to the main gate of the suspended lot to check the valve, if the valve is closed, timely understanding of the reasons for valve closure, to confirm that can be opened, open the valve to restore water supply.

3 If the total valve of the lot is not closed, contact the water company in time to understand the specific reasons for the water outage.

4 If the water supply is caused by the domestic pumping equipment, the following treatment:

(1) If the valve is closed to cause water supply, immediately understand the reasons for the valve closure, and take effective measures to restore water supply in a timely manner.

(2) If the water pump shutdown caused by water, immediately find the cause of the shutdown, and take effective measures to repair or replace parts, and timely restoration of water supply.

(3) such as municipal pipe network caused by water outages, immediately check whether the municipal pipeline inlet valve failure or contact the water company to understand the cause of water outages, the resumption of water supply time. Timely cooperation with the service center to do a good job of explaining the relevant work to the owners.

Second, sudden power outage emergency treatment

1, high-voltage ring cabinet sudden power outage

(1) engineering duty personnel should contact the power supply department of the high-voltage lines in a timely manner, and in the absence of identifying the cause of the failure before any operation is strictly prohibited.

(2) If the point of failure is not in the jurisdiction, it is estimated that the troubleshooting time is long, the high-voltage operators of the power supply department can be transferred to another high-voltage power line (if any), and the prohibited switch hanging "no closing" signage.

(3) After the fault is removed, the power supply department operator to restore the original power supply line.

2, distribution room circuit breaker tripping blackout

(1) engineering duty personnel received a blackout notice, immediately rushed to the blackout site, the circuit breaker will be under the branch load switch disconnect, the circuit breaker tripped hanging "line maintenance, forbidden to close" signage.

(2) With a shaking table to detect the branch lines.

3) After the fault line is identified, close the other lines to restore power.

4) Hang the "line maintenance, forbidden to close the gate" signboard on the switch of the problematic branch line, and further overhaul the line to eliminate the problem and restore power supply.

3, the owner of the room tripped

1) duty engineering staff received a blackout notice, immediately rushed to the scene of the blackout, inspection and maintenance before, should be aware of the owner of the meter tripped before the use of other electrical appliances, in order to quickly find the point of failure.

2) If the fault is the household main switch, immediately turn off the main switch and other sub-circuit air switch, and then open the main switch.

3) If the main switch does not jump, and then send the sub-switch, such as a sub-switch can not be sent on, that is, the line for segmentation testing, until the fault, restore power.

The district comprehensive power outage emergency response plan Part 5

In order to correctly, effectively and quickly deal with water and power outages, minimize the impact of water and power outages and losses, to ensure that the company's normal production, office order, the development of this emergency response plan.

First, the scope of application:

Because of the water, electricity related equipment damage and natural disasters caused by water, electricity supply crisis caused by the company's normal production, office constitute a significant impact and serious threat of water, electricity events.

Second, the organization

Leader: Assistant General Manager (administrative system)

Members: the head of each system, the head of each branch, the head of the security team, the Ministry of Administration, equipment commissioner, administrative commissioner

Third, the steps

(a) ) water

1, planned water shutdown

(1) the company's external maintenance or internal maintenance needs to stop water, the Ministry of Administration received the water company or the company maintenance department notification half a working day in advance to notify the person in charge of the affected departments to inform the specific time of the suspension of the time and water supply, to assist you to do a good job ahead of time to work arrangements or prepare for the preparation of the water.

(2) each department received the notice of the water cut-off should be on the water equipment to check, if necessary, shut down the machine; the kitchen received the notice should be prepared in advance to use water; security team leader should be the fire water system to confirm the storage of fire water system to ensure that the fire water system is always in a state of work; cleaning staff should be in the use of the more frequent use of the public **** restroom stocked with some water for everyone to wash their hands with. Cancel after normal water supply.

(3) Each department to close the departmental area of the water faucet or valve; security personnel to close the public **** restrooms, supporting rooms and other areas of the water faucet or valve; the person in charge of the restaurant in a timely manner to close the restaurant area of the water faucet or valve.

2, sudden stoppage of water

(1) unknown reasons for the emergency stoppage of water occurs, the Department of Administration should be informed of the news immediately notify the property to investigate the cause of the stoppage of water, and at the same time to the water supply company to ask the cause of the stoppage of water and the time of the resumption of the water supply, and timely feedback to the person in charge of the system and the person in charge of the branch.

(B) blackout

1, planned blackout

(1) Administration Department collects or receives external or internal blackout information, timely telephone notification of the system in charge of each branch, the person in charge of each department, and informed of the specific blackout information and work time adjustment program; such as blackout in the working hours, the Department of Administration should be in the blackout 10 minutes before the system in charge, the person in charge of each branch, the department in charge of each branch, the person in charge of each department, the person in charge of each system, the person in charge of each branch, the person in charge of each department. The administrative department should confirm with the person in charge of each system, each branch office and each department in charge 10 minutes before the power outage, and save the computer information or close the relevant equipment in advance; the kitchen should do a good job of preparing meals in advance.

(2) 10-20 minutes before the restoration of power supply, the Department of Administration should notify the person in charge of the system, the branch office, the person in charge of each department to confirm that the post electrical appliances, equipment in the closed state, to avoid voltage instability burn equipment.

2, sudden power outages

(1) when a sudden power outage occurs, the Department of Administration should immediately notify the property to investigate the cause of the power outage, by the head of the security team, the Department of Administration, equipment commissioner to the power supply to inquire about the cause of the power outage and the time to restore power supply, a clear explanation of the cause of the power outage, the person in charge of the administrative system to determine the temporary adjustment of the work time program by the Commissioner of the administration of the system in a timely manner to the person in charge of the various branches, department heads and classroom managers to confirm that each position electrical appliances, equipment is turned off. The administrative commissioner timely feedback to the head of each system, branch, department heads and shuttle bus drivers; and notify the kitchen to do a good job of preparing meals.

(2) holidays or evening sudden power outages, the security team should contact the power supply office to confirm the cause of the power outage, and notify the commissioner of administration, by the Department of Administration to feedback the information to the head of each department.

(3) In case of power outage in the evening, the security team should strengthen the inspection work in the factory area, and if necessary, the day-shift staff can be deployed to strengthen the security until the power supply is restored.

Fourth, this emergency plan since the date of publication.



A. Purpose

In order to ensure that the tower crane lifting process after a sudden and prolonged power outage, can quickly and effectively carry out the rescue work to minimize the risk of mechanical injuries, the Ministry of the project to develop the emergency treatment and rescue plan.

Second, the organization

The project set up emergency rescue command group, responsible for command and coordination.

2. Responsible for on-site protection, set up a cordon, maintain order, evacuate people.

3. Responsible for notifying the equipment unit to organize rescue, call the rescue personnel, timely and safe removal of dangerous situations.

Fourth, emergency rescue procedures

When the tower crane crane in the normal operation of a sudden blackout (for a long time) failure, so that the lifting object hanging in the air. And for a long time, the following emergency measures should be taken:

1. All controllers should be dialed to the "0" position, disconnect the total power supply.

2. By professional maintenance personnel intermittently open the hoisting winch brake or open the pull handle, let the lifting object down, each time down a short distance, the descending speed shall not exceed the rated speed, and finally make the lifting object down to the ground.

3. If there are obstacles and houses below the crane, the following measures should be taken:

(1) according to the contents of article 2 will be lowered to a safe distance from the object or house above, and then take the slewing device brake or pull the wind rope measures, do not allow it to rotate under the action of the wind;

a. The tower crane jib slewing turn to the open place, or slewing to the building Safe parts, or temporary resting on the steel platform that can carry the tonnage of the crane and monitor, and brake slewing, set up a cordon, and then according to the operation of Article 2;

(2) set up a cordon area under the crane, and have a special person to monitor, do not allow people to walk or work under the crane;

(3) below the crane is an office area, then below the office of the crane people must temporarily (3) If there is an office area under the hoist, the personnel in the office under the hoist must leave temporarily and take measures according to the method in (2);

(4) If there is a residence under the hoist, the personnel in the house under the hoist will be persuaded and guided by the project department to take temporary evacuation measures;

(5) After the power supply is restored to be connected, a comprehensive inspection should be carried out, and then the hoist will be turned to the designated place for descending.

4. Immediately organize safety self-correction, eliminate hidden dangers, to ensure construction safety; immediately organize the construction of all construction workers to cite the safety re-education, improve the safety awareness, to comply with the rules and regulations, to prevent the occurrence of similar accidents.

5. In the rescue process, fall from height accident, immediately implement the fall from height accident emergency treatment and rescue plan.

V. Correspondence address

1. Company Tel:

2. Engineering Management Department Tel:

3. Equipment Unit Tel:

4. Project Manager: Cell phone or telephone:

Deputy Project Manager:

Project Engineer:

Project Engineer:

Constructor:

Safety Officer:

Material and Equipment Officer:

Attachment Nearby Hospital Addresses:

Workplace Accident means Featured Hospital Directory (please select according to the actual situation of the project)

Emergency Disposal Plan for Comprehensive Power Outage in Small Districts Part 7

In order to prevent and dispose of the campus blackout incident in a fast and steady way, and minimize the impact on the lives of students, faculty and staff.

In order to prevent and quickly and properly deal with campus power outages to minimize the impact on the lives of students, faculty and staff, work and study, to ensure that the normal teaching and living order of the College, the following emergency response plan.

First, the establishment of the blackout emergency command group

Leader: Yin De Wang

Deputy Leader: Lin Xiangyun

Members: electricity maintenance group of all the staff

Second, the emergency command group

1, the implementation of personnel, Clearly responsible for the refinement of the work measures, to put the work and requirements into practice.

2, strengthen the daily management of emergency response mechanism, in practice, the use and improvement of emergency response plan.

3, strengthen personnel training, regular and irregular exercise activities, and constantly improve the command and response to power outages.

4, generator equipment maintenance, oil reserves.

5, in case of sudden power outage accident timely notification of all departments to make appropriate preparations.

Third, the power outage event classification and processing measures

a class - all involved in the use of computer exams:

In order to ensure that the normal operation of the above exams, the Logistics Department to communicate with the Senate in advance, to seek the views of the Senate, the electricity Maintenance group and then do the corresponding work. For example, if the weather is sunny and there is no notice of power outage from the power supply department, will power be generated? If the power line fails and power generation is needed, when the municipal power supply returns to normal, the staff on duty shall not switch the power supply immediately, but must ask the superior leader to switch the power supply only after approval. Computer exams, foreign language oral exams, even if not generating electricity, the electricity maintenance team have to arrange the relevant personnel on duty in the generator room standby.

b class - institutional level activities, foreign guest visits and general exams:

The electricity maintenance team must arrange for the relevant personnel on duty in the generator room, if a sudden power outage, immediately generate normal electricity.

Category c - Student classes, student lunch breaks, evening and night:

If there is a sudden power failure, the personnel on duty in the Electricity Maintenance Group must generate electricity within 5 minutes to ensure normal electricity usage.

Category d - campus power lines in need of urgent repair when the need for power outages:

The electricity maintenance team on duty must ask the higher leadership agreed to power outages, so as not to cause the need for electricity department of the inconvenience.

All power outages, power generation, repair of power lines, etc., should be immediately written or telephone notification of the relevant departments to make appropriate preparations and measures.

The district comprehensive power outage emergency disposal plan Part 8

I. The purpose of the exercise:

To improve the ability to deal with sudden power outages, to protect the normal conduct of medical work.

Second, the content of the exercise:

The normal 1 transformer failure led to power outage of the department quickly switched by the normal 2 transformer power supply.

Third, the drill time: May 31, 20xx 13:30 pm

Fourth, the drill location: outpatient clinic building, inpatient building, high distribution room.

V. Emergency Command Group:

Commander-in-chief:

Deputy Commander-in-chief:

Sixth, the working group

Leader:

Deputy Leader:

Members: Engineering Department, Security Department

VII. Preparation for the exercise:

Notify the exercise program to all departments of the power outage, prepare the emergency lights etc.

VIII, exercise description:

May 30, 20xx, high distribution room often 1 transformer failure, resulting in outpatient building, medical building, inpatient building multi-sector blackout, the property engineering department quickly in accordance with the plan repair, 15 minutes later, the power supply will be switched to the often 2 transformer, restoring power supply. (The drill, does not affect the operating room, blood dialysis room, ICU and other key departments, because these departments are equipped with the end of the automatic switching bit, in case of emergency can be automatically switched to the normal 2 transformer, to ensure normal power supply)

Nine, the drill procedures:

1, the commander-in-chief announced the start of the drill.

2, the high distribution room often 1 transformer failure lights, staff quickly reported to the Department of Logistics, property managers, while the implementation of repair.

3, Logistics Department received the report immediately after the command security center, the use of public **** broadcasting system to issue a sudden power outage notice, notify the outpatient emergency room, ward medical staff to maintain order. Comforting propaganda to stabilize the mood of patients or family members in the outpatient emergency room and about the elevator (elevator trapped in the implementation of the plan).

4, the property was notified, the engineering department six staff divided into three groups, respectively, into the door building, inpatient building of the high distribution room and the total high distribution room, the power supply transformer from the normal 1 switch to the normal 2, to restore power supply, and the normal 1 for troubleshooting.

5, elevator class is responsible for each elevator patrol.

6, the security guard is responsible for emergency room patrol.

7, after filling out the emergency reported to the hospital office.

X. Notes:

1, the drill before the preparatory work should be adequate, publicity work should be in place.

2, the electrician to switch the power supply in strict accordance with the operating procedures to implement.

District comprehensive power outage emergency disposal plan Part 9

In order to effectively safeguard the safety of teachers and students of the whole school, effective emergency treatment of the whole school may occur sudden power outage phenomenon, to prevent accidents due to water and power outages, according to the spirit of the relevant documents of the competent authorities of the higher level, by the school research decided to develop a water outage, power outage emergency plan.

Safety Leadership Team

Group Leader:

Deputy Group Leader:

Members: classroom teachers and logistics personnel.

First, the main responsibilities:

timely understanding of the information about the water and power outages, grasp the school to prevent sudden water and power outages of equipment configuration, and according to the actual school to put forward preventive countermeasures and measures to strengthen the school teachers and students safety education to enhance the awareness of teachers and students protection and ability.

Second, the work measures:

1. Strengthen the school safety education and publicity work, make full use of bulletin boards, blackboards, campus radio and other publicity positions, through the theme of the class meeting, the radio station, and other forms of the whole school teachers and students to stop the water, power outages occur in the prevention of accidents, publicity and education and training, once the phenomenon of water and power outages occur students are not panicked.

2. Strengthen the prevention of water and power outages, facilities overhaul and installation, the school according to the actual situation of the investment, the installation of some of the relevant prevention of sudden water and power outages equipment, such as: in the dormitory building, the staircase of the building should have an emergency light, the safety exit signs to ensure that the staircase is clear and guardrail firm, water and power outages occur when the classroom teacher, the teachers of the classroom to organize the safe evacuation of the students.

Third, the report and response:

1. Prior notice of the water and power outages, in contact with the offices to explain the situation, the premise of notifying all teachers and students to do a good job of water and power outages before the preparation.

2. Not received prior notice of the temporary water and power outages:

(1) administrative staff on duty should immediately report the situation to the water and power outage security leading group, the leading group divided into arrangements for the work.

(2) members of the leading group should immediately notify the important functions by phone, such as: notify the cafeteria to arrange for meals and temporary lighting appliances, notify the Education Department to arrange for classroom teachers and teachers in the aisles of each building, stairs to maintain order.

(3) The General Affairs Office is responsible for organizing water and electricity maintenance personnel to identify the causes of water and electricity outages and timely contact and coordination with the local water and electricity departments, as soon as possible to remove the fault.

3. Evening self-study during the water, power outages:

(1) The school duty officer should promptly notify the duty electrician and maintenance personnel by phone.

(2) After the water and power outages occurred, the teachers on duty should immediately go to the designated floor to organize the students into the classroom to maintain order and evacuate in an organized and planned manner.