In today’s social life, the frequency of use of protocols is on the rise. Protocols coordinate the relationships between people and between people and things. So how to write the relevant agreement? Below is an equipment maintenance contract agreement that I compiled for everyone for your reference. I hope it can help friends in need. Equipment Maintenance Contracting Agreement 1
Party A:
Legal representative of Party A:
Party A’s address & phone number:
Party B:
Party B’s ID number:
Party B’s address
Party B hereby contracts Party A’s entire factory machinery, equipment, pipelines, lines, and future factories. Maintenance and repair items, including newly added machinery and equipment, shall be carried out in accordance with the "General Principles of the People's Republic of China and Civil Law", the "Contract Law of the People's Republic of China" and relevant regulations, and in accordance with the principles of equality, voluntariness and consensus through consultation. , the two parties signed a labor service project contract as follows:
1. Labor service contracting project: maintenance and repair of the entire factory’s machinery and equipment, pipelines, lines, and future new machinery and equipment in the factory (factory air conditioners , computers, boiler annual review fees paid to the government department, and the purchase of secondary foaming machine square tubes are not included).
2. Contracting period: from August 1, 20xx to July 31, 20xx
3. Contracting fees:
4. Payment of contracting fees Method: Pay the previous month’s fee on the 25th of each month. The remaining balance of the contract is settled ten working days after expiration.
5. Responsibilities, tasks and requirements of Party B during the contract period:
(1) Water usage is normal. The water fee is assessed to be the responsibility of Party A for the normal consumption of the factory. (The water fee is 3,000 yuan per month as a reference.) The water leaked through the pipeline and was not discovered in time. It was discovered that it was not repaired in time and the total reactive power cost on the electricity bill exceeded the normal amount. The cost shall be borne by Party B.
(2) If the cost of a single part of the equipment is more than five thousand (5,000.00 yuan), Party B shall bear 30%, and Party A shall bear 70%. If a single machine is not in good repair and the cost of replacing it with a new one is less than 5,000 yuan, Party B shall bear it. Party B shall bear 30% and Party A shall bear 70% if the amount exceeds RMB 5,000.
(3) During the contract period, scrapped materials due to machine failure will be charged 100 yuan per bed (12 beds are allowed to be scrapped per year). The scrapped products will be assessed by the company’s quality inspection. If Party A suffers losses due to the abnormal maintenance time of the equipment, Party A shall hold Party B accountable for its liability according to the seriousness of the circumstances.
(4) Party A’s machinery and equipment shall be handed over to Party B if they can operate normally and can be used normally according to their current status. Party B must return the equipment that can operate and be used normally to Party A when the contract expires or is terminated.
(5) Party B itself or its hired personnel or outsourcing personnel must abide by and obey the various rules and regulations of the factory.
(6) Party A is responsible for the installation of machinery, equipment and materials in the factory, and Party B is obliged to cooperate with Party A in installing and debugging the equipment. The production equipment and modifications shall be provided by Party A and Party B shall be responsible for the production and installation. The cost of maintenance after normal operation shall be borne by Party B. The maintenance material cost of the newly added equipment shall be borne by Party A, and the labor cost shall be borne by Party B.
(7) Staff must have certificates to work. Party B must have a low-voltage electrician certificate and a welder certificate. If you don’t have one, sign up to take the study exam within six months.
(8) Party B is responsible for the daily fire safety work of the factory. If there is a danger in the factory, Party B is obliged to actively cooperate with the rescue work. Both parties will bear RMB 50 each for the loss caused by flooding in the factory due to problems with the anti-waterlogging pump.
(9) During the contract period, Party B itself or the permanent staff hired by Party B shall not engage in the maintenance of contracted machinery and equipment in factories and units in Guangdong that are detrimental to Party A and compete with the same industry, or For technical guidance and part-time work, etc., Party B itself or the staff hired by it shall not disclose Party A's business secrets, or engage in any behavior that damages Party A's reputation or image.
If Party A is found to have committed any of the above acts, Party A may seek compensation from Party B according to the severity of the circumstances, and may be held legally responsible in serious cases.
(10) Party B enters the factory and purchases spare parts from Party A’s factory at market prices. After the contract is terminated, Party A will purchase Party B's spare parts at market prices. Party B temporarily borrows Party A's tools for use and will return the intact tools to Party A after the contract is terminated.
6. Change, cancellation or termination of the contract:
This contract has been carefully studied, carefully considered and reached by both parties. Both parties must agree to abide by it. If it needs to be changed, canceled or terminated, Termination must be negotiated and unanimously agreed by both parties. It cannot be changed, terminated or terminated without negotiation and unanimous consent of both parties.
VII. Liability for breach of contract:
(1) If Party A fails to pay the contracting fee to Party B on time without any reason, Party A will pay Party B a late fee of 5% of the contracting fee per month.
(2) If Party B fails to perform its duties and complete the tasks according to its responsibilities, tasks and requirements, Party A has the right to require Party B to make rectifications. If the rectifications are invalid, Party A has the right to pay a salary no higher than the contract fee for the month. 5% of the total amount will be deducted from the monthly contract fee.
(3) If Party B and its hired personnel cause losses to Party A’s property, facilities, and equipment, Party B shall compensate them according to the price.
(4) If either Party A or Party B fails to perform its obligations under this contract or unilaterally changes, cancels or terminates it, each party shall pay compensation to the other party equal to 10% of the total contracting fee during the contract period.
8. Party B shall be solely responsible for labor insurance and work-related injury accidents.
9. Unsatisfied matters: Other unsatisfied matters shall be negotiated by both parties. Supplementary terms shall be signed as an attachment to this contract and shall have the same effect. If it is inconsistent with relevant national laws and regulations, the national laws and regulations shall prevail.
10. This contract is in four parts. Party A and Party B each hold one point; Party A keeps one point for filing; and the financial department records one point.
Signature of the person in charge of Party A: Signature (seal) of the person in charge of Party B:
(Seal)
ID number:
Equipment Maintenance Contracting Agreement 2
Party A: Co., Ltd.
Legal representative of Party A:
Party A’s address:
p>
Party B: Name________Gender___________
Party B’s resident identity card number____________________Contact number_________
Date of birth______year______month ______ day
Registration location____ province (city) ____ district (county) ________ street (township)
Home address______________________ postal code____________
Correspondence address____________________Postal code____________
Party B is an in-service mechanical maintenance personnel of the company. Party A and Party B have reached an agreement that Party B will provide repair and regular maintenance services for Party A's equipment. Regarding this matter, Party A and Party B voluntarily sign this service agreement and agree to abide by the terms listed in this agreement.
Article 1 The validity period of this agreement shall be from the day, month, year until Party A no longer needs the maintenance work of its equipment.
Article 2 Rights and Obligations of Party A
1. If Party A’s equipment fails or requires regular maintenance, Party A is responsible for notifying Party B to arrive at the site in a timely manner and provide necessary equipment, Personnel support and required spare parts.
2. Based on Party B’s actual work needs, implement professional centralized management of the plan review, procurement, storage and requisition of required spare parts.
3. Distribute necessary labor protection supplies to Party B as needed.
4. Responsible for educating and training Party B on production safety, labor discipline and various rules and regulations.
5. Party B shall pay Party B’s maintenance service fee for the previous month before ___ day of each month. The standard is ___ yuan (after tax)/month. The specific payment amount shall be determined by the Warehousing Management Department according to Party B’s completion of tasks. After the assessment opinions are submitted, the production and processing department will be notified, and the human resources department will be responsible for fulfilling them.
6. Party A purchases an accidental injury insurance from China Life Insurance Co., Ltd. for Party B to compensate for accidental injuries incurred by Party B while providing services to Party A.
Article 3 Rights and Obligations of Party B
1. Party B is fully responsible for the daily maintenance and regular maintenance of Party A’s equipment.
2. If Party A’s equipment fails, Party B shall ensure that it arrives at the scene within ___ hours after receiving the notification for processing.
3. In accordance with industry regulations, Party A’s equipment shall be maintained regularly and according to work standards. In case of legal holidays, the equipment should be fully inspected before the holiday, and any problems found should be dealt with promptly to ensure the safety of the equipment during the holidays.
4. Provide Party A with daily maintenance and maintenance plans for the equipment, and be responsible for providing necessary maintenance and maintenance knowledge training and technical guidance to relevant staff.
5. Regularly propose purchase plans for spare parts.
6. On the second Monday of every month, Party B shall cooperate with Party A in conducting special inspections of the equipment, and timely make suggestions for improvements to problems that arise during daily maintenance.
7. Perform job responsibilities conscientiously and obey management and arrangements. Strictly abide by safety operating procedures during work to avoid safety accidents.
8. Party B shall abide by relevant national laws and regulations and various corporate system regulations, strictly abide by industry norms, and abide by professional ethics.
9. During the contract period, Party B itself or the staff hired by Party B shall not be engaged in contracted machine equipment maintenance services, technical guidance or part-time work by factories and units in the same industry that compete with Party A. Party B itself or the staff hired by Party B shall not disclose Party A's business secrets, or engage in any behavior that damages Party A's reputation or image. If Party A is found to have committed any of the above acts, Party A may seek compensation from Party B according to the severity of the circumstances, and may be held legally responsible in serious cases.
10. Protect public property and facilities. If Party B causes economic losses to Party A due to personal reasons, Party B shall bear corresponding liability for compensation according to the consequences and the magnitude of the responsibility.
Article 4 Other related agreements
Party B violates the relevant laws and regulations of the country and Beijing as well as Party A’s relevant systems, causes accidents or negligence and causes personal injury or damage to others. Any damage to property, or review or punishment by relevant departments, shall be borne by Party B himself, and Party A shall not be jointly and severally liable for compensation.
Article 5 Under any of the following circumstances, Party A and Party B have the right to terminate this agreement:
1. Party A defaults on maintenance service fees without reason;
2. Party B is incompetent for the job and fails to complete the work tasks without any reason;
3. Party B fails to arrive at the scene within the agreed time limit three times without justifiable reasons or fails to perform the service agreement as required;
4. Violation of operating procedures or serious dereliction of duty, personal or equipment accidents, damage to equipment, machinery, waste of raw materials, energy, etc., resulting in large economic losses or serious consequences;
5. Violation of national regulations , Beijing laws and regulations, enterprise-related regulations and other circumstances.
Article 6. During the performance of this contract, if Party A’s production and operation conditions change or Party B’s age, health or other reasons affect the continued performance of the agreement, this agreement will be terminated.
Article 7 Supplementary Provisions
1. If the equipment fails or requires regular maintenance, the Warehousing Management Department is responsible for notifying Party B and the dispatching office of the Production and Processing Department to explain the cause and situation of the failure.
2. If Party B fails to arrive at the site in time after receiving the repair notice, the service fee will be deducted each time. In case of emergency, Party B cannot arrive at the site on time, Party A has the right to arrange other repairs. Maintenance personnel will perform on-site repairs, and the maintenance costs will be deducted from the service fee accordingly.
Article 8 Matters not covered in this agreement shall be resolved through negotiation between the two parties.
Article 9 This agreement is made in quadruplicate, with Party A’s Human Resources Department, Production and Processing Department, Warehouse Management Department, and Party B each holding one copy.
Party A (official seal) Party B (signature and seal)
Date: Year, Month, Day Date: Year, Month, Day Equipment Maintenance Contracting Agreement 3
Party A: _________Co., Ltd.
Party B: _________
The production equipment maintenance project of _________ company is contracted to Party B, and Party B voluntarily undertakes this task. In order to clarify the responsibilities of both parties, the following agreement terms were reached through friendly consultations:
1. Contract scope
Maintenance of production machinery and equipment
2. Responsibilities of both parties
p>
(1) Party A provides Party B with machine repair space and equipment required for major maintenance.
(2) Party A provides Party B with meals or reasonable meal allowances for machine repair work.
(3) Party B shall prepare its own small tools, gloves and other labor protection supplies required for maintenance.
(4) Party B promises to come to the factory to inspect the production machines every week to facilitate early detection of potential risks.
(5) Party B shall perform routine maintenance on all production machines on a monthly basis and keep relevant records to ensure that the machines can operate normally.
(6) If Party A’s production machines encounter sudden failures and require emergency repairs, Party A will promptly notify Party B, and Party B must rush to the site for repairs within one hour.
(7) Party B shall be responsible for the safekeeping of various repair and maintenance equipment, appliances, etc. provided by Party A. In case of loss or man-made damage, compensation shall be based on the original price. If it is damaged due to normal use, it will be replaced with a new one.
(8) If Party B discovers spare parts that need to be replaced or sent out for processing during the maintenance process, it must submit a written list to the relevant management personnel of Party A. It can only be carried out after obtaining approval, otherwise it will not be recognized.
(9) Party B is obliged to train machine operators on what they need to pay attention to when operating the machine to ensure that Party A’s employees do not operate in violation of regulations.
(10) During the maintenance process, Party B must abide by safety regulations and prevent accidents. If a safety accident occurs due to violations, Party B shall bear the corresponding financial responsibility.
III. Pricing and payment methods
The contracting fee for Party B to provide machine repair services to Party A is _________ million yuan/year. On the date of signing of the contract, Party A will pay the first year's fee. , and then pay _________ million yuan every six months (January and July).
IV. Contract Period
This agreement will be valid for three years from the date of signing, that is, the agreement will be terminated on _________year________month__________.
5. This agreement is made in two copies. Party A and Party B each hold one copy. It will take effect after both parties sign.
End.
Party A: ____________________ (signature and seal) Date of signing: _________year, month, _________day
Party B: ____________________ (signature and seal) Date of signing: _________year_ Equipment Maintenance Contracting Agreement on _________month_____________ 4
Party A:
Party B:
Party B accepts Party A’s entrustment, and Party B is the guarantor of Party A Normal use of medical equipment, repair and maintenance services for Party A's agreed equipment. In order to protect the legitimate rights and interests of Party A and Party B, in accordance with the "Contract Law of the People's Republic of China", Party A and Party B signed this agreement through friendly negotiation. Before signing the agreement for the first time, the equipment should be in normal operation before signing the agreement, with equipment details attached.
Article 1 Obligations of Party B
1. Party B shall give priority to arrange on-site repairs according to the repair notification of equipment failure as agreed by Party A. During the statutory working days from Monday to Friday, Party B will arrive at the site within 8 hours for users within urban areas; for users in counties and districts, Party B will arrive at the site within 24 hours.
2. Party B does not charge door-to-door fees and labor time fees for door-to-door maintenance.
3. There is no limit on the number of times Party B can visit for repairs.
4. Party B only charges accessories fees for maintenance, and ensures that the accessories fees are the same as or lower than the manufacturer's unified price.
5. If the parts that Party B replaces for Party A are damaged within the three-month warranty period, Party B must replace and repair them for Party A free of charge.
6. Party B shall formulate an equipment maintenance plan based on the conditions of Party A’s contracted equipment and report it to Party A. In the absence of Party A's notice of repair, Party B shall carry out on-site maintenance of Party A's contracted equipment according to the maintenance plan. Under normal circumstances, on-site maintenance services are provided once a month.
Article 2 Obligations of Party A
1. Party A shall promptly notify Party B after the agreed equipment fails.
2. Party A cannot use non-original spare parts and consumables that have not been approved by Party B, otherwise Party B will not be held responsible for equipment failure.
3. Without Party B’s approval, Party A shall not invite third-party units to repair the agreed equipment, otherwise Party B will not bear the consequences and responsibilities arising therefrom.
4. Party A is not allowed to dismantle the contract equipment without permission, otherwise Party A will be responsible for all losses caused.
5. When the agreed equipment contract breaks down and parts need to be replaced, Party A shall bear the cost of the parts.
6. When the agreed equipment is transferred or transferred, Party A shall notify Party B in a timely manner.
Article 3 Settlement Amount and Method
Party A shall calculate the maintenance fee in _________ yuan in _________ unit time, one week after the agreement is signed and becomes effective Within the period, a one-time maintenance fee shall be paid to Party B.
Matters not covered in Article 4 shall be resolved through negotiation between Party A and Party B.
Article 5: This contract is tentatively valid for one year. It is made in two copies. Each Party A and Party B shall hold one copy. It shall take effect from the date of signature and seal.
Party A’s unit (seal): _______________Legal representative (signature):_____________Address:_____________Tel:_____________
Fax:_____________Account opening bank:______________Account number: _______________Date: ______year______month
Party B’s unit (stamped): _______________ Responsible person (signature): ____________ Address: ___________Tel: _____________
Fax :_____________Bank of account:_____________Account number:_____________Date:______year______monthEquipment maintenance contracting agreement 5
Party A:
Party B:
Party B accepts Party A's entrustment. In order to ensure the normal use of Party A's medical equipment, Party B provides maintenance services for Party A's agreed equipment. In order to protect the legitimate rights and interests of Party A and Party B, in accordance with the Contract Law of the People's Republic of China and the People's Republic of China 》, Party A and Party B signed this agreement through friendly negotiation. Before signing the agreement for the first time, the equipment should be in normal operation before signing the agreement, with equipment details attached.
Article 1 Obligations of Party B
1. Party B shall give priority to arrange on-site maintenance according to Party A’s agreement on equipment failure notification. During the statutory working days from Monday to Friday, Party B will arrive at the site within 8 hours for users within urban areas; for users in counties and districts, Party B will arrive at the site within 24 hours. 2. Party B does not charge door-to-door fees and labor time fees for door-to-door maintenance. 3. There is no limit on the number of times Party B can visit for repairs.
4. Party B only charges spare parts fees for repairs, and ensures that the spare parts fees are the same as or lower than the manufacturer's unified price. 5. If the parts replaced by Party B for Party A are damaged within the three-month warranty period, Party B shall replace and repair them for Party A free of charge.
6. Party B shall formulate an equipment maintenance plan based on the conditions of Party A's contracted equipment and report it to Party A. In the absence of Party A's notice of repair, Party B shall carry out on-site maintenance of Party A's contracted equipment according to the maintenance plan. Under normal circumstances, on-site maintenance services are provided once a month.
Article 2 Obligations of Party A
1. Party A shall promptly notify Party B after the agreement equipment fails.
2. Party A cannot use non-original spare parts and consumables that have not been approved by Party B, otherwise Party B will not be held responsible for equipment failure.
3. Without Party B's approval, Party A shall not invite third-party units to repair the agreed equipment, otherwise Party B will not bear the consequences and responsibilities arising therefrom.
4. Party A is not allowed to dismantle the contract equipment without permission, otherwise Party A will be responsible for all losses caused.
5. When the agreed equipment contract breaks down and parts need to be replaced, Party A shall bear the cost of the parts.
6. When the agreed equipment is transferred or transferred, Party A shall promptly notify Party B.
Article 3 Settlement Amount and Method
Party A shall calculate the maintenance fee in _________ yuan in _________ unit time, one week after the agreement is signed and becomes effective Within the period, a one-time maintenance fee shall be paid to Party B. Article 4 Unfinished matters shall be resolved through negotiation between Party A and Party B.
Article 5 The validity period of this contract is tentatively one year. It is made in two copies. Party A and Party B each hold one copy. It will take effect from the date of signature and seal.
Party A’s unit (seal): Legal representative (signature): Address: Telephone: Fax: Bank of account: Account number: Date: Year and month
Party B’s unit (seal): Person in charge (signature): Address: Telephone: Fax: Bank of Account: Account Number: Date: Year and Month