Municipal infrastructure construction projects
Municipal infrastructure construction projects ****6 categories of 45, with a total investment of 2.396 billion yuan.
A, 12 municipal road projects
1, Changxing South Road road construction project: the starting point of liberation East Street, the end of Chengnan Street, a total length of 780 meters, the planning control of the red line of 40 meters, six lanes in both directions, the bidding work has been completed.
2, Weiyuanmen Road (Chengxi Road) South Road Construction Project: the starting point for the Wuji Road, the end of the five needle Street, a total length of 2,369 meters, planning and control of the red line of 50 meters, bidirectional six lanes. At present, Wuyi Road to Jiefang West Street section of 1005 meters has completed the bidding process.
3, Dehuamen Road (Chengnan Road) West Road Construction Project: the starting point for the hero of the South Road, the end of the West First Ring, a total length of 1,800 meters, the planning control red line of 50 meters, six lanes in both directions. At present, the South Heroes Road to the day evening set section 637 meters has completed the bidding work.
4, Yan'an North Road road construction project: the starting point for the Weihua Road, the end point for the North Second Ring Road, a total length of 1305 meters, the planning control red line of 40 meters, two-way six-lane, the current North First Ring Road to the North Second Ring Road section of 425 meters has completed the bidding process.
5, Southwest Outer Ring Road Construction Project: the starting point for the Western Outer Ring Road, the end of the Southern Outer Ring Road, a total length of 4,700 meters, planning and control of the red line of 60 meters, six lanes in both directions.
6, North Second Ring Road road construction project: the starting point for Yan'an North Road, the end of Changxing North Road, a total length of 519 meters, the planning control red line of 30 meters, four lanes in both directions, has completed the bidding process.
7, iron incense burner lane road reconstruction project: the starting point for Changxing Road, the end of the heroes of the Middle Road, a total length of 361 meters, the planning control red line of 24 meters, bidding has been completed, according to the progress of the requisition and relocation of the construction site.
8, after the West Street road reconstruction project: the starting point of the heroes in the middle of the road, the end of the station before the road, a total length of 3312 meters, planning and control of the red line of 50 meters, six lanes in both directions, for the World Bank loan project, is currently in the construction drawings design.
9, South Hero Road road reconstruction project: the starting point of Jiefang West Street, the end of the South First Ring Road, a total length of 2606 meters, Jiefang West Street to the south of the city planning and control of the red line of 40 meters, the south of the city planning and control of the red line to the south of the first ring road of 50 meters, bidding has been completed.
10, Changjin high-speed Changzhi south exit renovation project: the starting point of Changjin high-speed Changzhi south exit toll station, the end of the Changzi rapid connection, a total length of 245 meters, 30 meters wide, six lanes in both directions.
11, glory lane road reconstruction project: the starting point of the liberation of the West Street, the end of the military division of the dry rest, a total length of 250 meters, the planning control red line 16 meters.
12, long north trunk road reconstruction project: the starting point of the North Walled Cross, the end of the North Outer Ring, a total length of 2,320 meters, the planning control red line of 60 meters, six lanes in both directions, is currently undergoing preliminary procedures.
Two, six municipal bridge project
1, Wuyi Bridge construction project: Wuyi Bridge is located in Wuyi Road and the intersection of South Chengxi Road, has completed the bidding process.
2, Lu'an Bridge (Ten Middle School Bridge) construction project: located at the intersection of East Chengdu Road and Xinying Street, the bidding work has been completed.
3, Chengxi Road South Extension Bridge Construction Project: located at the intersection of Chengnan Road and Chengxi Road, crossing the Heishui River, with an estimated project investment of 30 million yuan.
4, Shingnan Road West Extension Bridge Construction Project: located in the south side of the intersection of Shingnan Road and Shingnan Street, across the Blackwater River, with an estimated investment of 30 million yuan.
5, Changxing South Road Bridge Construction Project: located in the southern section of Changxing South Road and the intersection of Chengnan Road, across the South Moat, with an estimated investment of 15 million yuan.
6, heroes South Road bridge construction project: is located in the heroes South Road and South City Road, north of the intersection, across the southern moat, will be combined with the heroes South Road road reconstruction of the bridge re-construction, project investment of 13 million yuan.
Three, three pedestrian overpass project
1, heroes North Road elementary school overpass: located in the city of heroes North Road, the main road to catch the horse village section, the estimated investment of 4.2 million yuan.
2, Changzhi College South Campus Flyover Bridge: across the East Outer Ring Road, with an estimated investment of 4.1 million yuan.
3, the city hospital overpass: proposed to be built between the city hospital and peng yu hotel, estimated investment of 3.9 million yuan.
Four, three railroad overpass project
1, Zijin West Street railroad overpass project: located in Zijin West Street and Taijiao Railway intersection, the status quo is 7 meters wide. Proposed bridge width of 50 meters, 24 meters of motorized traffic, six lanes in both directions, 12 meters on each side of the non-motorized road and pedestrian sidewalks, estimated investment of 65 million yuan.
2, five needle street railroad overpass project: estimated total investment of 68 million yuan, is located in five needle street and Taijiao Railway intersection, the status quo width of 16 meters, is the city's east and west of one of the important nodes of the city's trunk roads. Proposed the use of the current situation of the old bridge, on both sides of the two holes to add two new bridges of 16 meters each: each add a motor vehicle and human non **** board. At the same time the west exit of the bridge and Changzi connection, the west outer ring road traffic optimization organization.
3, the South Outer Ring (South Ring Street) Railway Overpass Project: located in Changjin high-speed east, Changzhi County, near the village of Wang Tong, the estimated total investment of 0.75 billion yuan.
Fifth, the North First Ring Road and North Chengdong Road interchange bridge project
Located in the long steel road grouping station, is the East City Road and the North First Ring Road, two major traffic nodes, the construction of the overpass will effectively alleviate the pressure on the surrounding road traffic, the control of the investment of 450 million yuan. At present, the planning program design has been completed.
Six, backstreet alley renovation project
In 2015, the city will be the main city of 20 backstreet alleys to implement the transformation, respectively, Lingnan Lane, Qinjia Lane, Fuhua Lane, Huaihai Qinghua Snack Street, Phoenix Tsui, Huafeng North Road, Magnetic Lane, Wayao Gully East one or two alleys, North Camp three alleys, the east back alleys, Watershed West, in the camp street, the first lane of the seven alleys, the Southwest Pass mosque alleys, Furnace Square Lane, Glorious West Lane Branch Lane, Southwest City Lane Branch Lane, Crematorium Road, Xin'an Lane, Shen Hou Lane. The total length of 18.9 kilometers, an area of 110,000 square meters.
Municipal Utilities Construction Projects
I. Construction of Urban Water Supply Facilities
1. New Water Transmission Pipeline Project from Weizi Town to Changzhi No.2 Water Treatment Plant: It is proposed to build a new water transmission main line of 24.35 kilometers from Weizi Town of Lucheng City to Changzhi No.2 Water Treatment Plant.
2, the new district water supply pipe network construction project: it is proposed to build a new news center, sports center, business center, Zexinyuan district and Shengxinyuan guaranteed housing district ring water supply pipe network, with a total length of 10.12km.
Two, the city's centralized heat supply project
The Zhangshan Power Plant 2 × 300MW + 600MW unit for heat supply renovation to the urban areas to implement cogeneration, the project can increase the centralized heat supply. After the project is put into operation can increase the centralized heating area of 14 million square meters.
Three, sludge (food waste) disposal plant project
New sludge (food waste) disposal plant, site selection is located in the Changbei sewage treatment plant southwest of the sludge treatment of about 1km of the reserved land, occupies an area of about 4 hectares, the capacity of 300 tons of sludge treatment / day.
Four, the city lighting facilities renovation project
Renovation of North Chengdong Road, hydraulic plant, and Ji Hospital, Yu police court, Shijiazhuang intersection of 18 medium-pole lighting, and renovation of automatic monitoring system.
Fifth, the construction of urban sanitation facilities
***4, the estimated total investment of 532 million yuan. Including: a new sanitary landfill for domestic waste (can absorb the main city 5 years of domestic waste), 10 new public toilets, 6 new refuse transfer station; construction of a domestic waste incineration power plant.
Sixth, urban underground pipeline census planning and construction projects
Completion of urban underground pipeline census, comprehensive underground pipeline management information system construction and urban underground comprehensive pipeline network planning.
Seven, three rivers and one canal comprehensive management project
Before the end of May 2015, Shizi River Ten Middle School Bridge to Zifang Bridge to complete the storage of water. before October 1, the East Flood Control Canal, Heishui River with the conditions of water; Shizi River, the East Flood Control Canal by the end of the year is fully completed; Heishui River and the South Moat by the end of the year to complete 80% of the project volume each.
Social public welfare facilities construction projects
I, Changzhi Railway Station renovation project
Total investment of 30 million yuan, has been prepared to complete the construction drawings design.
Second, Changzhi National Urban Wetland Park Construction Project
The proposed Changzhi National Urban Wetland Park 12 square kilometers of water and the available land along the scope of the implementation of transportation, lighting, sanitation, science exhibitions, ornamental excursions and other 7 basic supporting facilities construction.
Three, Changzhi Airport expansion project
New 12,000 square meters of the terminal building, the release of 350m of the runway, the new apron 10120 square meters, four new corridor bridges, expanding the airport plaza, supporting the improvement of lighting and power supply systems and water supply and drainage systems, a total investment of 369 million yuan, and the current preliminary work has been completed.
Improve 6 construction projects
1, Xiangyuan Intercity Connector Project:
Total length of 20.2 kilometers, at present, in addition to the transfer bridge, the bridge project involved in the 1 ~ 5 bridge and under the railroad box culvert has been basically completed, the road project roadbed has been basically formed.
2, Chang'an Expressway Connection Project:
Total length of 11.62 kilometers, in July 2013 to start construction, is now open to traffic conditions, to be completed in June 2015 before full completion.
3, sports road construction project:
Total length of 300 meters, in November 2014 to start construction, to be completed by the end of June 2015.
4, the administrative center overpass:
Located between the business building and the sports center, across Taihangxi Street.
5, Torch Middle School overpass:
Across West Taihang Street.
6, improve the city god temple, guanyin hall, on the party gate, the six fu tower heritage protection and restoration project:
The total investment of the project is 0.45 billion yuan, has completed the investment of 0.03 billion yuan, in 2015 to complete the investment of 0.15 billion yuan. To be completed by the end of August 2015.
Urban landscaping construction projects
One, improve the 2014 landscaping projects
***12 items, respectively, the Fu Hou East Street, the county in front of the Lane, the West Diagonal Street, Zhongshan Lane, Zhangze West Street, Weifang 25th Road, the South First Ring Road, Taihang Street, Heroic North Road, Sports Road, Chang'an Expressway Connection Road greening project and Taihang Street (Hydraulic Factory to Hubin Road) on both sides of the Green space restoration project.
Two, the city beautification greening project
In the spirit of thrift, embellishment of the principle of the city beautification project in 2015 is proposed to invest 1.6 million yuan, beautification of the time period according to the May Day Labor Day, summer, Eleventh National Day to implement the implementation of more than the use of the ground planting of persistent flowers or set up pots and other ways, in principle, do not have a large flower racks, flower beds, flower realm, and so on.
Three, the park park facilities renovation project
Park park facilities renovation project includes: Bayi Square east and west sides, Zijin Square, the pole factory 4 public toilets, the riverfront park fountain maintenance and renovation, Mengjiahuayuan renovation.
The main urban shantytown (village) renovation projects
A, shantytown renovation projects
In 2015, started to promote seven shantytown renovation projects, involving 1855 households, 6866 people, covering an area of 97,946 square meters, building area of 85,628 square meters. Respectively: bearing factory shantytown, long defense electrical appliances Co., Ltd. shantytown, 114 geological team shantytown, Yan Dong a lane shantytown, Jiuding auto parts Co., Ltd. shantytown, the city of Taihang grain machinery factory shantytown, sewing machine factory shantytown.
Two, urban village renovation projects
In 2015, focus on promoting 19 urban village renovation projects. Respectively: urban Mafangtou, Taoyuan, Lijiazhuang, Southwest Pass, after the Park, Xinhua, Nanguan, attached to the city, Changzimen, Huadong 10 urban village renovation projects; suburban Hukou, Guandujiazhuang, Daxinzhuang, Zhan on the Liangjiazhuang, Mijiazhuang village 6 urban village renovation projects; high-tech zone, Dahuajiazhuang, Shijiazhuang, small Huajiazhuang 3 urban village renovation projects.
State Road Transit Section Reconstruction Project
One, National Highway 208 Changzhi Transit Highway Reconstruction Project
Starting point is located in the suburbs of Changzhi Bone Crucible Village West, the route is in the Yuzhuang East under the Changzhi Yingbin Avenue, along the National Highway 208 West Transit to the south, the end point is located in the Changzhi County Sima. Route length of 13.6 kilometers, the whole line according to the two-way four-lane primary highway standard design, design speed of 80 km / h, the overall roadbed width of 24.5 meters, the total investment is estimated at 846 million yuan (an average of 62.275 million yuan per kilometer cost).
Second, National Highway 207 Changzhi Transit Highway Reconstruction Project
Route layout in Changzhi City, Lucheng City, east of the old top of the east side of the mountain, the end point is located in the village of the four pools of Hu Guan County, the route total length of 40.926 kilometers, the entire line according to the bidirectional four lanes of Class I highway standard design, the design speed of 80 kilometers per hour, the overall width of the road base of 24.5 meters, the total investment is estimated to be 2,440 million yuan (average cost per kilometer 5 million yuan). The total investment is estimated to be 2.440 billion yuan (average cost per kilometer is 59.58 million yuan).
Three, National Highway 207-208 line connection road project
Starting point is located in Changzhi County Sima Village, and the existing National Highway 207, the route from west to east, the end of the end of the village stops at Jia Palm, and the proposed National Highway 207 Changzhi Transit section of the highway, the route is 11.719 kilometers long. The entire line of technical standards according to the two-way four-lane primary highway standard design, design speed 80 km / h, the overall roadbed width of 24.5 meters, the project's total investment is estimated to be 542 million yuan (an average cost of 46.21 million yuan per kilometer).