Emergency plan for rainstorms

2021 under the rainstorm emergency plan (General 6)

In the reality of learning, work, life, it is not guaranteed that you will encounter some unexpected events or accidents, in order to minimize the harm, it is often necessary to prepare an excellent emergency plan in advance. What are some of the characteristics of an excellent emergency plan? The following is my 2021 emergency plan for rainstorms (general 6), welcome to learn and reference, I hope it will help you.

Under the rainstorm emergency plan 1

a. Purpose

In order to ensure the personal safety of employees, the company's property safety, defense plans, formulate countermeasures and measures in advance for a wide variety of typhoons and rainstorms, when the typhoon and rainstorms, the company's emergency leadership team's safety work to command decision-making and scheduling according to the plan. Wind and rain rescue and relief is strengthened. The initiative and foresight of the typhoon and rainstorm prevention work can be made to achieve a more reasonable and scientific command, thus reducing the economic losses caused by typhoons and rainstorms. The scope of application of this program is abnormal weather such as typhoons, rainstorms, thunder and lightning, and high winds. According to the "xx city special natural disaster rescue emergency plan" of the guiding ideology, combined with the actual situation of the company, specially formulated this program.

Second, the organizational structure and responsibilities

1, typhoon and rainstorm prevention work leading group:

Commander-in-chief: xx.

Vice Commander: xx.

Team members: xx.

(The above members of the leading group by the Ministry of General Affairs of the staff and the heads of the departments. Heads of the Department of General Affairs. If there is any workplace adjustment to prevent the typhoon storm program begins.

The post holders will be automatically on board and no change in documentation is required.

2. Responsibilities:

xxx (responsible for the allocation of tasks to various departments)

xxx (responsible for information liaison)

xxx (responsible for the inspection and protection of mechanical equipment in the workshop of the Manufacturing Department)

xxx (responsible for the safety of the company's house)

xxx (responsible for the coordination of the work of various departments)

xxx (responsible for staff safety)

Security Team Leader (responsible for the monitoring of the surrounding environment)

3. Program Initiation:

Upon receipt of the warning signal of typhoon and rainstorm from Zhuhai Meteorological Station, the program will be officially launched.

Third, the program

1, Report:

When the personnel general affairs department received information from the meteorological department or superior typhoon and rainstorm, they should report to the general manager for the first time (when the general manager is not to the deputy general manager to report), and the general manager convened a meeting of the security emergency response to the work of the leading group to start the security emergency plan.

2, organization and implementation:

(1) After the start of the emergency plan, the leading group of safety emergency work should go to the front line to do a good job in monitoring the implementation of related work.

(2) The competent department should evacuate the staff safety area in accordance with the requirements of the company and the company's unified arrangements to avoid casualties, unable to go to the company's employees to find ways to inform them to stay in a safe place.

(3) The company decided to leave the company, the Ministry of Integrated Affairs staff responsible for the return of employees' transportation arrangements.

(4) If the company is really detained for special reasons, the personnel of the Ministry of Integrated Affairs should do a good job of resettlement, and the company should ensure the safety of employees.

(5) Pay close attention to the progress of the typhoon, rainstorms, and maintain 24-hour communication, timely reporting and transmission of disaster information, so that all types of personnel in emergencies to be deployed in a timely manner to minimize losses.

(6) In the event of a disaster, the company should arrange 24-hour duty personnel to deal with emergencies.

(7) After the disaster, we should summarize and report to the superior in time. Notify the relevant departments and business partners of the impact of the disaster on the company. Organize the loss situation and notify the insurance company in a timely manner.

3. Before the arrival of typhoons, rainstorms and other unusual weather:

(1) Strengthen inspections to eliminate potential safety hazards.

(2) Close doors and windows, and remove or reinforce falling objects such as window sills and roofs.

4, staff dormitory building No. 1 by Tan xx supervision;

5, No. 2 dormitory building by Huang xx supervision;

6, office building (including canteen) by the clerical staff management;

7, the workshop by xx supervision.

Under the rainstorm emergency plan 2

In order to further improve the hot season, heavy rainfall, rain and snow weather and other natural disasters emergency work, to prevent to the elderly in the home for the elderly in special hardship and the staff of the life and property of the major losses, especially the development of this emergency plan.

I. Emergency organization

1, extreme weather emergency working group

Group leader: xx

Deputy leader: xx

Group members: the head of each team and team members Responsibilities:

(1) to do a good job of daily inspection, the implementation of the responsibility of the production of safety, to prevent The impact of extreme weather (high temperature, heavy rainfall, rain and snow).

(2) In the event of extreme weather (high temperature, heavy rainfall, rain and snow) leading to large-scale power outages and other accidents, do a timely job related to emergency response, as soon as possible to restore power supply and so on.

(3) According to the impact of extreme weather (high temperature, heavy rainfall, rain and snow), decide whether to start the emergency plan.

(4) timely report to the superior disaster and take strong measures to actively respond.

(5) If necessary, request external support.

(6) All members should be under the unified command of the team leader, each in their own way, each responsible for their own responsibilities, full cooperation, and do a good job of extreme weather preparedness.

2, extreme weather emergency rescue team

Captain: xx

Team: xx

Responsibilities:

(1) Usually to strengthen the power distribution room, fire systems, circuit systems, water and electricity room safety inspection.

(2) the occurrence of extreme weather (high temperature, heavy rainfall, rain and snow) at the same time triggered a disaster, the organization of personnel to implement rescue operations.

(3) timely report to the natural disaster emergency response team on the consequences of extreme weather (high temperature, heavy rainfall, rain and snow).

(4) Afterwards to summarize the work experience of emergency response.

(5) once the extreme weather (high temperature, heavy rainfall, rain and snow) in time to organize the elderly in the home to move to a safe place, to ensure that the elderly in the home life safety.

Second, the emergency procedures

1, the home emergency procedures

(1) Once the extreme weather (high temperature, heavy rainfall, rain and snow), should quickly take appropriate emergency measures.

(2) timely report to the head of the Natural Disaster Emergency Response Working Group (night notification of the general lead staff), report on natural disasters (high temperature, heavy rainfall, rain and snow) caused by specific disasters (such as lightning strikes and fires, lightning strikes and power outages, lightning strikes caused by equipment failures, flooding, etc.) situation.

(3) such as during normal working hours, in the case of time permitting, should be issued by the Office by telephone and other forms of notification to the departments, and actively organize a response to try to avoid the occurrence of unsafe events.

(4) If the time is urgent, it should be immediately reported to the head of the Natural Disaster Emergency Response Working Group (night notification of the general lead staff), explaining the details of the situation, issued a notice to the departments, timely arrangements for the care team to properly arrange for the elderly to do a good job of avoiding the work, such as in the case of strong thunderstorms, the shift should be reminded of the power supply to cut off power-using equipment to prevent damage to the equipment from lightning strikes.

(5) If extreme weather triggers flooding, personnel should be immediately organized to fight the flood.

2, each shift emergency procedures

(1) each shift received a natural disaster (high temperature, heavy rainfall, rain and snow) notification, it should be permitted to cut off the power supply of all electrical equipment first, to be put into use after the weather returns to normal.

(2) After receiving the notice of natural disasters (high temperature, heavy rainfall, rain and snow), immediately do a good job in preparation for fire prevention, flood control, and prevention of power outages.

(3) the sudden occurrence of natural disasters (high temperature, heavy rainfall, rain and snow) triggered by power outages, you should immediately notify all shifts to turn on the emergency lighting, timely activation of the backup power supply, and timely notification of the electrician or duty personnel to actively cooperate with the disposal.

(4) to strengthen the inspection of the elderly room, appease the residents, while paying attention to fire, flood prevention, prevention of electric shock.

Three safeguards

1, the office to strengthen the home security hidden parts of the self-correction work, found that the problem is immediately resolved.

2, the security officer to implement a 24-hour duty system to ensure that 24 hours on standby.

3, the service room is routinely equipped with emergency lights, torches and other lighting supplies, regular checks, to maintain a perfect state.

4, the infirmary to strengthen the daily management, emergency calls to keep open, equipped with enough medicines.

5, the office should be organized to carry out extreme weather (high temperature, heavy rainfall, rain and snow) emergency response drills, through the drill, so that everyone is familiar with the extreme weather (high temperature, heavy rainfall, rain and snow) emergency response procedures, to ensure that all the people in the homes of the elderly life and property safety.

Under the rainstorm emergency plan 3

In order to prevent rainstorms, thunderstorms and other inclement weather, to prevent possible flooding, to ensure the personal and campus property safety of teachers and students, combined with the actuality of our school, the development of this emergency response plan.

First, the guiding ideology

Prevent accidents, ensure the safety of people, reduce property losses.

Second, the scope of application

Rainstorms, lightning, wind and other severe weather.

Third, the preparatory work

1, before the rainstorm, carefully check the condition of the school building, to see if the roof is leaking, whether the wall is rain, clean up the downpipe ditches and other drainage facilities, there is a problem in time to repair.

2, the teachers and students to prevent rainstorms, lightning and flooding safety knowledge education, to be proactive.

3, check the school's surrounding environment, to prevent accidents in the school due to external causes.

4, check the circuit equipment to prevent accidents caused by water showers.

5, division of labor in place, the implementation of personnel and responsibilities.

6, check the water embankment lot around our school, develop flood control arrangements, make personnel and equipment ready;

7, determine the evacuation routes and resettlement places in case of emergency, and organize teachers and students to carry out self-rescue, mutual rescue, escape drills.

V. Emergency measures

1, pay attention to the weather forecast, in case of bad weather or enter the flood season schools must arrange 24-hour duty, all personnel to maintain communication 24 hours a day, in order to be in an emergency can be deployed in a timely manner on all types of personnel.

2, rainstorm hours, the school duty officer and patrol personnel should be frequent patrols in all parts of the school, if found dangerous, immediately report to the duty leader, start the emergency procedures.

3, strong thunder and lightning weather, to do a good job of school personnel and distance learning equipment to prevent lightning.

4, once the school building in danger, quickly organize the orderly evacuation of students, transfer to a safe area, teachers should first ensure the personal safety of students.

5, timely through the campus radio, telephone, school newsletter and other media and communication tools to the relevant departments and parents to pass information, inform the situation.

6, pay attention to the road conditions of students going to school and leaving school, if the road is damaged or there are safety hazards students can not go home, the school should be properly placed students, and contact parents in a timely manner.

7, in accordance with the requirements of the higher leadership, timely organization of the staff, and the implementation of the preparatory measures.

Six, work requirements

1, the ideological importance of the spirit of the party and the people's cause is responsible for overcoming paralysis and laxity, the idea of taking things lightly, and seriously make all the preparations.

2, the work of the implementation of a clear division of labor responsibilities.

3, the organization should be coordinated and strong, to ensure the smooth flow of orders.

Under the rainstorm emergency plan 4

In order to ensure that the beneficiation plant in the occurrence of destructive rainstorms, the emergency work can be efficient, orderly, minimize casualties and property losses, according to the State Council, "the occurrence of destructive rainstorms emergency regulations," combined with the actuality of the work of my beneficiation plant, the special preparation of this plan

First, the emergency organization

1, the leading group

Selection of anti-rainstorm disaster work at the upper level of anti-rainstorm disaster reduction under the leadership of the leading group to organize and implement. Selection of plant anti-rainstorm disaster reduction leading group by the plant director as the leader, the deputy director and the section chiefs for the group members, plant scheduling for the command

2, the main responsibilities

(1) to strengthen the leadership, improve the organization, strengthen the work responsibilities, strengthen the destructive rainstorms and anti-rainstorm disaster reduction work to familiarize with and understand the development of the various contingency plans and implementation of the various measures

(1) to make full use of all channels of seismic disaster prevention and mitigation of the work of the plant to strengthen the work of the plant to prevent and mitigate the impacts of the disaster on the environment. (2) make full use of various channels to carry out publicity and education on knowledge of earthquake disaster, organize and guide the popularization and education of the whole length of knowledge of earthquake prevention and resistance to earthquakes, widely carry out self-rescue and mutual rescue training in earthquake disasters, and constantly improve the awareness and basic skills of the majority of employees in earthquake prevention and resistance to earthquakes

(3) seriously improve the material security, and actively prepare for the implementation of the dietary and drinking water, anti-freezing and rainproofing, rescue equipment and other materials, and strengthen the management so that all emergency plans and the implementation of measures. (4) After the occurrence of destructive rainstorms, take all necessary means to organize all aspects of the force to carry out comprehensive disaster mitigation work to minimize the losses caused by the disaster

(5) scheduling of all the positive factors, the rapid restoration of the production order, and comprehensively safeguard the stability of the production and the life of the staff

< The relevant organizations are ready to implement rain mitigation tasks

2, the organization of the relevant personnel to carry out a comprehensive inspection of the building belonging to the blocking, closure of dangerous places, stop the large-scale activities

3, to strengthen the management of flammable and explosive substances, toxic and hazardous chemicals, to strengthen the large-scale boilers, power supply and transmission of power plant hangars, important equipment, the place of protection to ensure that earthquake mitigation is carried out smoothly:

4, increase the majority of employees publicity and education, do a good job of stabilizing the ideological work of the staff

5, strengthen all kinds of duty duty, keep communications open, timely grasp of the grass-roots level situation, and make every effort to maintain the plant production and life order

6, according to the plan to implement the material preparations

Third, after the earthquake emergency action raw < /p>

1, regardless of whether there is a forecast, the alarm, in the scope of the district or neighboring areas after the occurrence of destructive rainstorms, the leading group immediately went to the local command post, the rescue and relief teams must be in the quake within one hour of the unit assembled to standby

2, the leading group in the higher level of unified organization and command, and quickly organized the selection of the plant rescue and relief

(1) quickly issued an emergency alarm (continuous) The emergency alarm (continuous rapid ringing and shouting), the organization is still stranded in a variety of buildings of all personnel to evacuate:

All sections of the staff in the section chief deputy section chief of the organization to enter the rain shelter place

(2) quickly shut down, cut off the bookstore (except for the emergency lighting system), to prevent heavy rainfall after the birth of other disasters

(3) quickly carry out the rescue of personnel and as the main content of the 'on-site rescue (3) quickly carry out with the main content of the rescue 'scene rescue work, timely transfer of injured people and sent to the annex rescue station rescue

(4) to strengthen the protection of important facilities, important items.

3, actively do a good job of the majority of employees' ideological propaganda and education work, eliminate the panic mentality, stabilize the people, quickly restore normal order, and make every effort to maintain social security and stability

4, quickly understand and grasp the situation of the disaster in the plant, and timely summary of the company's office

Fourth, other

1, After entering the emergency state of rainstorms, the selection of plant command will be issued through a variety of ways of various orders, instructions, earthquake mitigation leading group will be by telephone, oral and other forms of conveyance of a variety of orders, instructions

2, in the earthquake mitigation of emergency operations, to work closely with, obey the command, to ensure that the smooth flow of orders and implementation of all the work

under the rainstorms Emergency Plan 5

First, Purpose:

In the typhoon and rainstorm natural disasters before the arrival of a good job in advance of the emergency preparations, rapid and effective control of the situation and properly dealt with, the typhoon and rainstorm may cause the loss of the minimum.

Second, the start of the plan:

Received from the Zhuhai Meteorological Station issued a typhoon rainstorm warning signal, the plan is officially launched.

Third, the organization:

(a) Typhoon rainstorm prevention work leading group:

Leader: Su Ying

Deputy Leader: Li Jian, Wu Jinhui

Members: Long Qinglan, Ding Hongbing, Hu Zhiguo, Peng Weicong, Tang Zhiqiang, Lu Shan

(b) Typhoon rainstorm prevention Working Groups:

1, Engineering Group:

Group Leader: Lu Shan

Group Members: all employees of the Engineering Department

2, Equipment Group:

Group Leader: Ding Hongbing

Group Members: all employees of the Equipment Department

3, Security and Motorized Group:

Group Leader: Hu Zhiguo

Group Members: all Security team members

4, administrative logistics group:

Group leader: Long Qinglan

Group members: Tang Zhiqiang, Peng Weicong, Bai Zhijie, Yin Ge, Cai Li

Fourth, the duties of:

(a) typhoon storm prevention work of the leading group of responsibility:

1, is responsible for the prevention of typhoon storm work organization, coordination, supervision and monitoring, the work of the leading group of the typhoon storm prevention, coordination, supervision, and monitoring, and the work of the leading group of the typhoon storm prevention. Work of the organization, coordination, supervision, inspection and other comprehensive work.

2, the commander-in-chief Su Ying is responsible for the overall work; deputy commander-in-chief Li Key is responsible for the security maneuvering group and administrative logistics group; deputy commander-in-chief Wu Jinhui is responsible for the management of the engineering group, equipment group.

(b) the duties of the typhoon and rainstorm prevention work group:

1, engineering group:

responsible for the work under the jurisdiction of the supervision, construction and other units of the typhoon and rainstorm prevention work of the layout, inspection, coordination and other comprehensive work.

Responsible for the implementation of the construction site buildings and equipment and facilities of the reinforcement, protection, drainage and flood prevention work.

Responsible for the organization, inspection and implementation of the evacuation of the construction site.

Responsible for the organization of a construction unit composed of emergency rescue mobile team on standby, as a reserve team to deal with emergencies, by the leading group directly deployed.

2, equipment group:

Responsible for the scope of work under the jurisdiction of the supervision, construction and other units of typhoon and rainstorm prevention work layout, inspection, coordination and other comprehensive work.

Define the key elements of anti-typhoon and rainstorm work, and report to the leading group.

Responsible for the implementation of the equipment department under the jurisdiction of the construction site of the building and equipment facilities reinforcement, protection, drainage and flood prevention work.

Responsible for the Ministry of Equipment under the jurisdiction of the construction site personnel evacuation of the organization, inspection, implementation and so on.

3, security mobile group:

Responsible for the area of public security, do a good job of fixed post and patrol post emergency adjustment.

Responsible for the implementation of the necessary materials for the preparation of the rescue.

Responsible for the acceptance and inspection of typhoon and rainstorm prevention reinforcement and evacuation work within the jurisdiction.

Responsible for the coordination of the relevant working groups, the inspection of hidden safety hazards to deal with the work.

Responsible for rescue work in the personnel rescue work.

4, administrative logistics group:

Responsible for timely collection of the latest typhoon and rainstorm warning information, announced the start and termination of the plan.

Summarize the key areas of typhoon and rainstorm prevention reported by the working groups and report to the leading group.

Responsible for the organization, coordination, inspection and supervision of administration and logistics.

Responsible for solving the food and accommodation arrangements for evacuees and staff.

Responsible for vehicle scheduling of the administrative fleet, and arranging emergency vehicles for ambulance.

Contact the medical ambulance agencies to coordinate the arrangement of medical personnel.

Responsible for the coordination of the working groups.

Responsible for the inventory of people, property and goods after the typhoon storm.

Responsible for insurance claims.

V. Evacuation site: Paradise administrative building, staff dormitory

Job responsibilities:

1, the Office of the Security Committee: responsible for the organization of the prevention of rescue work.

2, Administration and Personnel Department: responsible for timely collection of the latest typhoon rainstorm news, announced the start and recovery of the plan, wind emergency and the general coordination of the aftermath of the treatment.

3, the Ministry of General Affairs Security Brigade: responsible for rescue, evacuation, protection of the scene, to assist the relevant departments of the typhoon disaster accident handling.

4, general affairs, market service room: responsible for the typhoon storm disaster injured personnel rescue, rescue accident in the car arrangements.

5, equipment department: responsible for the park equipment safety inspection, maintenance and equipment hidden trouble removal.

6, Engineering Department: responsible for sudden accidents in the water, electricity processing; attractions facilities protection and repair of damaged parts; trees, flowers and plants to deal with. 7, Ministry of Finance: responsible for insurance claims.

8, other ministries: according to the department's scope of responsibility to do a good job of typhoon storm emergency measures, the personnel in principle by the head of each department to arrange their own, to help deal with natural disasters.

Six, work procedures

1, the Ministry of Administration and Personnel, the Office of the Security Committee in the receipt of the higher or related units of the typhoon rainstorm notification, immediately reported to the relevant leadership and reach all departments.

2, the Ministry of Administration and Personnel, the security brigade, the Ministry of Engineering, the General Affairs Department, the Ministry of Tourism, the Ministry of Food and Beverage, the Ministry of Finance, the Ministry of Equipment, the Art Troupe and related departments set up to prevent typhoons and rainstorms working group, the general manager's office duty leader as the chief commander. Each department manager organization set up an emergency response team to lead the department to implement the emergency measures against typhoons and rainstorms.

3, all employees can identify the typhoon and rainstorm signals and meanings, each department in the notification, should immediately organize the Department of staff to do a good job of preventing wind and flood prevention.

4, the departments and offices should organize staff to check the scenic facilities, the rapids will be reinforced and tied to the boat, the tour buses, boats parked in a safe location.

5, the Ministry of General Affairs administrative fleet arrangements for rescue or emergency vehicles, medical office is responsible for the rescue of injured people.

6, if the typhoon rain signal in the typhoon signal to enhance the signal, typhoon red signal or red rainstorm forecast signal, the security brigade should be organized more than 15 people volunteer rescue team, standby at the post, call as you go, as the anti-typhoon rain mobile force.

7, typhoons and rainstorms, such as the opening of the park comes, the Ministry of Tourism received a notice from the Ministry of Administration and Human Resources to notify the tourists to pay attention to the safety of the radio. Security brigade security guards and various positions in the park should pay close attention to the scenic tourists, buildings, facilities and safety, and immediately report the situation.

8, the general manager's office leadership according to the size of the typhoon storm, decide whether to close the park early. If the park is closed early, the general manager on duty should notify the Ministry of Tourism to inform the tourists of the impact of typhoons and rainstorms early closure of the park, the Ministry of General Affairs, the Ministry of Tourism, the Ministry of Equipment, the Ministry of Engineering, the operation of the Ministry of Food and Beverage, the Art Troupe employees should be in the scenic area to guide tourists away from the park.

9, after the typhoon storm, coordinated by the Ministry of Administration and Personnel, the General Affairs Department, the Ministry of Finance should be photographed to obtain evidence, count the loss of supplies, and is responsible for insurance claims.

10, the Ministry of Engineering, the Ministry of Equipment to organize personnel to repair damaged building facilities and flowers and trees blown down by the typhoon and rain, and is responsible for cleaning up the scene.

11, the typhoon storm prevention process of outstanding performance of the department and personnel, in accordance with the "Staff Rewards and Punishments Ordinance" to give recognition and reward. Serious dereliction of duty, resulting in significant losses and serious consequences, in accordance with relevant regulations to pursue responsibility.

Under the rainstorm emergency plan 6

In order to ensure that the Group area in the occurrence of heavy rainfall and flooding disaster, emergency response can be coordinated, efficient and orderly, to ensure the safety of people's lives and property, specially formulated this plan.

I. Organization

The XX Group storm flood prevention and emergency response leading group was established, composed of the following:

Leader:

Deputy leader:

Members:

The leading group consists of seven working groups, an office and a supervisory group

The leading group has seven working groups, an office and a supervisory group

The leading group has seven working groups, an office and a supervisory group.

Establishment of the leading group office of storm water flood prevention and emergency response.

The establishment of storm flood prevention and emergency response work supervision group

Second, the responsibility of the division of the area

The group party secretary, general manager, prevention and emergency response work of the leading group leader Comrade Chen Qiming is responsible for the group's flood control and prevention of storm flood disaster of the overall work; the first working group is responsible for the HuTouLing Agricultural trading company flood control and prevention of storm flood disaster work; the second working group is responsible for the flood control and prevention of The first working group is responsible for flood control and prevention of storm flood disaster in Hutouling Agricultural Trading Company; the second working group is responsible for flood control and prevention of storm flood disaster in Gold Mountain Agricultural Trading Company; the third working group is responsible for flood control and prevention of storm flood disaster in Farmers' Markets, Entertainment Venues, Niutoushan Residential Area, Dahu Pond Residential Area; the fourth working group is responsible for flood control and prevention of storm flood disaster in Middle Schools, Primary Schools and Hospitals; the fifth working group is responsible for flood control of industrial and secondary units (including private enterprises). The fifth working group is responsible for industrial and secondary units (including private enterprises) area flood control and prevention of storm flood disaster work; the sixth working group is responsible for the Dongfeng, Red Flag Farming Company flood control and prevention of storm flood disaster work; the seventh working group is responsible for the Democratic Farming and Trading Company, the breeder's farm flood control and prevention of storm flood disaster work; storm flood prevention and emergency response inspection team is responsible for the supervision of the seven working groups and secondary units to prevent the implementation of the work measures of storm flood disaster. The office of the leading group of storm flood prevention and emergency response is responsible for the coordination between the working groups and the submission of materials and other work. The two units set up a corresponding leading group, the development of work plans, clear responsibility for the area, responsible for personnel and work duties.

Three, early warning prevention focus and work requirements

1, strengthen the safety management of primary and secondary schools, a comprehensive investigation of rainstorm flooding may be brought to the school of the security risks and to be eliminated, in particular, to the student apartments, buildings, cafeterias, toilets to implement the focus of the monitoring as well as elementary school monitoring of the teaching outlets, the discovery of hidden dangers in time to deal with and to the group's emergency work of rainstorm flooding. Report to the Group's leading group of emergency response to rainstorms and floods. Teaching buildings, school canteens, student apartments have safety hazards, after the suspension of classes and then organized repair.

2, to strengthen the security monitoring of residential housing, villagers housing. The working group according to the responsibility of the area to implement the leadership responsibility system, supervise the relevant units to clarify the work responsibilities, develop work plans, village by village, household by household, piece by piece a comprehensive investigation of residential housing, villagers housing security risks, found that the situation in a timely manner to inform the residents or villagers, and to take appropriate measures to ensure that the residents, villagers life safety. Pay close attention to the "five guaranteed households", "difficult households", "working households" and vulnerable groups object housing and auxiliary facilities, to help them eliminate security risks.

3, strengthen the enterprise security monitoring. Comprehensive investigation of the enterprise production area, living area and auxiliary work area safety hazards, found that the problem of timely rectification, such as the unit does not cooperate with the depending on the circumstances of the mandatory closure of the rectification. Golden Phoenix Decorative Materials Company, the third production line next to the mountain there is the possibility of landslides, urged enterprises to take appropriate measures, China Science and Industry in the heavy rainfall and flooding during the construction to stop construction, Eternal Paper, Jiafeng spices, Hengfeng Tea Factory, food factories, garment factories, building materials factories, rice processing plants and other enterprises have varying degrees of security risks, one by one, to ensure that the enterprise staff life safety.

4, to ensure the safety of ponds and reservoirs across the flood, Doumen Pond, Turtle Mountain Lake twenty-four hours a day, the water level reaches the warning line in a timely manner when the release of floods, Hutou Ling, Gold Mountain, democracy and other agricultural companies, ponds and reservoirs every day to send a person to inspect, so that the water storage, the release of floods both.

5, strengthen the public **** place safety management. City Management Office twenty-four hours to monitor the safety of the farmers' market, found hidden dangers in a timely manner to the group's main leadership and storm flood prevention and emergency response team report. Rainstorms are more concentrated when shutting down Internet cafes.

6, strengthen the management of power supply facilities. Power companies in the group area of high-voltage lines, has taken over the full responsibility of low-voltage lines, electricity units are responsible for the area of electricity safety, the units should do a good job of preventing lightning safety knowledge propaganda.

Fourth, strict work discipline

The members of the working group must be in-depth to the area of responsibility, leadership, supervision of the area of responsibility of the relevant units to implement the work of the responsibility system, due to sloppy work, paralysis, lack of duty and absence of responsibility for accidents caused by the law, the responsibility of the relevant leadership to be investigated.

Fifth, do a good job of duty arrangements, as required to report the area within the storm flood disaster

1, the group storm flood prevention emergency duty room in the group hospitality, contact number.

2, the secondary units from June 8 to June 11 to arrange personnel duty, the specific duty personnel list reported to the Group for the record. Every day at 10:30 am, 15:30 pm to the group rainstorm flood prevention emergency duty room to report the disaster. Significant disaster potential at any time to the group rainstorm flood prevention emergency duty room report, and to the group's main leadership report.

3, the group storm flood prevention emergency duty room and the duty room of each secondary unit to make a good duty record for inspection. And keep the record neat and complete.

;