Rescue and relief work summary template five

After the establishment of the People's Republic of China*** and the State, the State has implemented a unified leadership of disaster relief work, and has planned and systematically deployed disaster prevention, disaster relief and rescue work. It is not a good idea to have a good time, but it is a good idea to have a good time. More rescue and relief work summary template please click " 2021 Summary " to see.

Summary of rescue and relief work 1

In order to do a good job of flood control in 20__, fully prepared to prevent floods, floods and dangers, in the case of sudden disasters can be efficiently and orderly implementation of flood control and rescue, flood damage to the highway damage to the minimum, to ensure that the flood season Jingwang highway, bridges safe and smooth, in accordance with the traffic and transportation, the highway is not only the best way to prevent floods, but also the most important thing is to ensure the safety of the highway, so that the highway is safe. Bridge safety, in accordance with the traffic group on the overall deployment of flood control and rescue work, the branch combined with the actual situation, grasp early, grasp, grasp the jurisdiction of the flood control and rescue work, set up flood control organizations, improve the flood control plan, timely inspection of the jurisdiction of the existence of flood safety hazards, the successful completion of this year's flood control work. This work is summarized as follows:

First, flood control measures

In accordance with the Department of Transportation, the Highway Bureau and the Transportation Group's deployment of flood control, adhere to the "plan for the worst, to the most beneficial efforts, prevention is better than cure," the principle of implementation of the "safety first, Always be prepared, prevention-oriented, all-out rescue, safeguard the smooth flow" policy, establish a solid awareness of flood control, overcome paralysis and the mentality of chance, and effectively do all the preparatory work for flood control, the development of a safe flood emergency program, and actively mobilize flood control materials, equipment and equipment, and adhere to the flood control and disaster relief, "leadership and organization, supply of materials, machinery and equipment, The four key environments of the rescue team, arranged for the deployment of the branch area of the flood control work, so as to save for a rainy day and take precautions before it happens.

(a) Raise awareness, improve the system

Branch to establish the manager as the first responsible person for the flood control responsibility system, combined with the actual situation, the development of a practical flood control plan, at the same time, there will be a higher level of the relevant documents on flood control in a timely manner to reach the grass-roots units, so that the units fully understand the importance of flood control work. Requirements for each unit to set up the unit's flood control institutions, develop specific measures, organize rescue teams, the implementation of flood control materials, the establishment of flood 24-hour duty, zero reporting system and night inspection system, in accordance with the duty schedule to adhere to the flood season day and night duty work, designate a person to pay close attention to changes in the weather, to keep abreast of the weather, detailed records of the weather and rainfall, flood forecasts, flood damage occurs to ensure that the flood situation in a timely manner to monitor, report quickly and accurately, respond in a timely manner, to monitor the flood situation. The first thing you need to do is to make sure that you have a good understanding of the situation, and that you are able to make a good decision.

(2) seriously check, grasp the implementation

First, do a good job of flood safety inspections, and in a timely manner on the Jingwang highway bridges, culverts and safety facilities, drainage facilities for regular inspection, maintenance, repair and reinforcement. At the same time, but also vulnerable to water damage section of the key inspection, a clear person in charge, in the event of danger, timely repair measures, and immediately report to the branch to ensure that the flood season Jingwang highway safe and smooth.

The second is to organize the relevant technical staff of the branch, the management of the service area and the toll booths, garages, telecommunication facilities, electrical facilities, maintenance machinery, flood control materials reserves, such as regular and occasional inspections, so that the maintenance of machinery and materials to deal with floods can be in a good state to play a role in ensuring that once floods occur, are able to be used, withstand, and win the war to ensure that the flood control work! To do a foolproof.

Third, the establishment of flood control and rescue teams. Drew competent cadres and workers to form a flood rescue commando, and organized flood control drills, to achieve rapid response, strong action, in the event of danger, immediately mobilized to ensure that the Jingwang highway flood relief work successfully completed.

Second, the water damage management experience

1, a comprehensive road inspection

Before the flood season, the road department in the flood season to strengthen the frequency of inspections, maintenance personnel to take a net-type inspection of the entire line of the roadbed, pavement, bridges and culverts, drainage, security installations and housing to carry out a comprehensive and detailed investigation of the problems found in the registry in a timely manner to arrange for the construction of the unit to be found in a timely manner before the flood season. Problems in the flood season before the arrival of timely repair and improvement. According to the requirements to do before the rain, rain, rain after the flood season inspection, in the inspection of the vehicle speed can not exceed 40KM / H, easy to occur on foot inspection of the road sections. The important sections and locations along the route that are prone to water damage will be monitored.

2, improve the drainage facilities in advance

Combined with the actual situation of the road, the study of roads prone to the formation of water damage section of the reasons, come up with solutions, which will be included in the annual maintenance plan, through the installation of additional water retaining walls, drainage ditches and evaporation pools and other drainage facilities limited prevention of water damage disaster.

3, timely repair of water damage

When the water damage occurs, in accordance with the practical plan has been developed, the organization of construction units to step up rescue work, set up a timely and obvious warning warning signs to prevent secondary accidents.

4, strengthen communication with higher authorities and relevant units

In the flood season to strengthen communication with security, medical, high traffic, meteorological and brother units, the establishment of emergency rapid police, rapid rescue, rapid rescue disposal mechanism. When the danger occurs the first time to communicate with the higher level of the relevant departments and offices, and first-hand data (video, images) and information reported to the higher level of the relevant departments and offices, and exchange views with them to further optimize the construction of the rescue program.

Third, the implementation of

This year _ month rainfall process is frequent, the branch at all levels of flood control personnel to stand firm, the leadership of the test before the command, the timely start of the emergency plan, give full play to the role of flood rescue personnel and equipment, do a good job of water damage caused by heavy rainfall weather, to ensure that the road is normal. This year's flood season, the road under the jurisdiction of the road section *** repair roadbed water damage 293m, pavement 30m, berm 6.4m, drainage ditch rapids 27m, retaining wall 110.7m, landslide 1674.5m, the cumulative water damage of about 182,900 yuan.

In the provincial highway bureau, the traffic group under the correct leadership, in all staff *** with the efforts of the branch, although the successful completion of this year's flood control tasks, but the flood control work is a long way to go, we will continue to play its role, and continue to develop and innovate for the driver and passenger convenient, safe and smooth out of the new to provide a strong guarantee.

Summary of rescue and relief work2

Since the flood season this year, the form of flood control is becoming increasingly severe, in order to ensure that the construction of the smooth progress and construction site safety flood, the Director of the Office of the construction units under the jurisdiction of the early flood control preparations for the key parts of the flood and flood season work plan arrangements, the development of practical measures to prevent flooding. Now on the flood control work is summarized as follows:

First, the guiding ideology and basic objectives

In the director of the Office and the leading group of safety work under the guidance of the implementation of the "safety first, unremitting, prevention-oriented" policy, strengthen the awareness of the responsibility of flood control, to do early planning, early arrangements, early discovery, early reporting, early treatment, the flood safety and protection work to be done in a safe and secure manner. Handling, the flood safety protection work as a priority, grasp, grasp, always grasp unremittingly, to ensure that the flood safety without incident.

The basic goal of flood control is: to ensure construction safety, construction quality, on the basis of promoting the construction of the entire project in an orderly and smooth progress, to ensure that the project is safe for the flood, without engineering safety and construction safety accidents.

Second, the working mechanism

1, strengthen the awareness of the responsibility of flood control, clear flood control duties, scope of responsibility. During the flood control period, the flood control and engineering construction to do the same deployment, the same check, the same assessment, in order to ensure the safety of the premise of flood control, to promote the orderly progress of site construction.

2, conscientiously implement the leadership responsible for the core of the flood control responsibility system, the director of the Office of the establishment of a Pang Ge as the head of the flood control work of the leading group, focusing on the "organization and leadership, the development of measures, the implementation of the task, supervise and inspect the work of the four, so that the organization is in place, the staff is in place, in place, measures in place, so as to be prepared for any problems.

3, urge the construction unit to develop effective and feasible flood emergency plan, set up a flood control organization, the implementation of the responsibilities, the establishment of flood control duty, the construction area before and after the rain inspection system, the formation of flood control rescue team, and related knowledge education training and plan drills.

4, supervise the construction unit to develop and implement the main flood control project construction schedule, construction measures, flood season materials storage, require the construction unit for unstable parts of the strengthening of safety monitoring work and according to the design requirements to complete the flood control project construction.

Third, the work summary

1, flood season, the Office of the Superintendent has always been the construction safety management and flood control work together, the organization of the owner to participate in the joint safety and flood inspection team, the construction of the project safety and flood control work to check, and urge the construction unit in accordance with the requirements of the time to complete the construction of the flood control project, the important parts of the flood control measures to convene a special meeting to review and coordinate the flood control measures. Review and coordination.

2, in short, in order to Pang Ge as the leader of the correct leadership, the Office of the Superintendent to conscientiously fulfill their responsibilities and the construction unit to actively implement the successful completion of this year's flood control tasks, to ensure that the construction site is safe flooding and the smooth progress of the order.

Summary of rescue and relief work 3

Since entering the flood season this year, the form of flood control is increasingly severe. And persistent high temperature and hot weather in order to minimize or eliminate the construction in the main flood season may occur flood emergencies or accidents caused by the loss, according to the national "National Emergency Public **** event overall emergency plan", "Flood Control Act", "Flood Control Regulations" of the relevant provisions of the relevant provisions of the company's flood control system, combined with the construction project this year, the flood control situation facing the project, my project analysis of the project flood The form of safety, the key parts of the flood control preparations and flood construction plan arrangements, the development of practical flood control and hot weather construction measures, now on the flood control work summarized as follows:

A guiding ideology and objectives

The guiding ideology of the flood control is: the implementation of the safety first, unremitting and preventive measures to the main rescue policy. Strengthen the awareness of the responsibility of flood control, based on flood prevention and flood resistance, early planning and early arrangements, flood control focus, pay close attention to the weak links, and effectively do a good job of all the preparatory work.

The basic goal of flood control is to ensure construction safety, construction quality on the basis of advancing the construction of the project in an orderly and smooth progress, to ensure that the project is safe for flooding, no safety accidents.

Second, the preparation of flood control plans and implementation of emergency rescue drills

The project department to prepare flood control plans for flood control needs, the organization of emergency rescue drills and at the same time for the deficiencies in the drill, and the flood control plan to modify and improve the flood control to lay a solid foundation for the safety of the flood.

Third, the development and improvement of flood control and flood control work plan and measures

1, build the flood control organization, the implementation of the duties and responsibilities, the establishment of flood control duty. Formation of flood rescue team, and related knowledge education and training.

2, for the unstable parts to strengthen the safety monitoring work.

3, according to the design requirements to complete the flood control construction.

Fourth, equipment and material security

1, seriously implement the requirements of the flood control work, do a good job of material and equipment management preparations;

2, the establishment of emergency supplies, equipment accounts, do a good job in the implementation of the organization of the work of flood control, implementation of the personnel, material implementation, implementation of measures;

3, the establishment of the post of responsibility for flood control, the flood season on duty, the pre-flood inspection, reporting system, flood control material management system and so on. system, flood control materials management system, etc.;

V. Increase flood control and flood safety inspection efforts to implement the flood control measures, carry out safety special inspections.

Flood project department always construction safety management and flood control work together, the construction team to check the important dangerous parts of the arrangement of special people regularly patrol check.

In short, the project department conscientiously fulfill their duties and actively implement, and successfully complete this year's flood control and flood control tasks, but there are some shortcomings, will be corrected in the future work.

Summary of rescue and relief work 4

_ day, heavy rainstorms suddenly hit our region. Heavy rainfall to the town flood control and drainage, key construction projects, landscaping, road access and other serious impact. In the face of this disaster weather, the district construction committee leadership attaches great importance to the immediate organization of all the middle level above the leading cadres, the development of relevant strategies, in accordance with the district party committee, the district government deployment, the departments urgently start the "___ District Meteorological Disaster Emergency Response Plan" and "___ District Flood Control and Drainage Emergency Response Plan", the emergency rescue team full staff to the post, put into the drainage and rescue work, and effectively defending against torrential rains and floods as the current central task, the Go all out, do a solid job of flood control and rescue work to ensure that the flood season property intact, with the shortest possible time will be in the construction projects, landscaping, roads and residential areas of water all cleaned up, with the fastest speed to restore the smoothness of the town's roads, and do our best to minimize the disaster losses.

I. Overall disaster situation.

1, engineering construction site water situation: my area **** there are 159 projects in construction by the rainstorm and water affected by the suspension of work. Among them, 140 construction sites appeared to be large areas of water, water accumulation of serious projects such as North Shilin, Wangjiachang Elementary School, Yuetan New Building and other 19 projects.

2, landscaping damage: the affected area amounted to more than 61,000 square meters, mainly distributed Panjiawa, five hundred acres, Jingu Road, Jinqi Road, Li Shuang Road, Jin Gang Road, Han Gang Road and other sections. *** caused more than 3600 fallen trees, mainly poplar, paulownia, thousand-headed toon, fragrant acacia and other trees, economic losses of nearly 9 million yuan.

3, roads and residential neighborhoods waterlogging situation: heavy rainfall caused by Xianshuigu township within the scope of the road waterlogging in many places, some sections of waterlogging is serious, mainly: the whole of the Red Flag Road, South China Road, Jianguo Street, Tsugu Road, Stadium Road North and the surrounding neighborhoods, to varying degrees of the existence of waterlogging phenomenon, waterlogging the deepest sections of water depth of up to 80 centimeters.

4, bridge damage is serious: due to heavy rainfall so that the water level of the Crescent River soared, once more than the alert level, the days of heavy water flushing, so that the Crescent River on a number of bridges are damaged, the most serious full red bridge has appeared safety hazards, is being reinforced maintenance.

Second, prevention and emergency measures.

1, strengthen organizational leadership, strengthen the sense of responsibility. The establishment of the building committee flood control work leading group, clear division of labor in all departments to do their respective duties. Led by the main leader, along the township sections, municipal drainage pumping stations and sewage pumping stations throughout the region all-night inspection, command flooding.

2, strengthen the logistics to ensure that emergency facilities to keep running. Municipal Institute in advance to do a good job of emptying the various drainage pipes. Check the pumping station all mechanical equipment, electrical equipment waterproof line, pumping pipe, submersible pump safety, to ensure normal operation, at any time in a state of readiness. Material field flood control equipment is well-prepared, snakeskin bags filled with sand and soil standby, to ensure that the pumping station engine room and material field storage room is not flooded. Drainage workers dressed in warning clothing in the rain standing in the center of the road and around the drainage wells, for passing vehicles and pedestrians navigation.

3, the full implementation of four levels of twenty-four hour duty system. During the flood control period, every day by the director of the construction commission, middle leadership, flood control personnel and full-time drivers composed of four-level duty team, all-weather duty, pay attention to changes in the weather situation at any time, to maintain up and down the linkage, communication, belonging to the scope of responsibility of the risk, disaster, etc., to do the first time to know, the first time to dispose of the first time, the first time to report, and effectively improve the response speed of the flood control work.

4, to take FMS, SMS, network transmission and other ways to notify the participating units to further improve the flood control work. Remind the participating units to pay attention to rain drainage, deep foundation pit monitoring, temporary electricity, large machinery and epidemic prevention after the rain and other safety matters. At the same time, urged to see the unit to migrant workers to be transferred to a safe place, and minimize the outing. This time during the heavy rainstorm, the total number of notices sent *** counted more than 3,000.

5, full service key projects in our region. During the flood control period quality security detachment implementation of one-on-one service mode, the arrangement of specialists to carry out on-site guidance, strengthen the dynamic tracking, for the project to do the work, such as the opening of a green channel, and make every effort to promote the key projects as early as possible to build, as early as possible to complete, as early as possible to put into operation, to reduce the impact of the flood season on the progress of the construction.

6, strengthen the degree of mastery of the flood situation. During the flood control period, the construction commission departments in accordance with the emergency work plan, the implementation of irregular flood reporting mechanism, dynamic tracking of the flood control situation in various sectors, and timely reporting to the construction commission and the district government.

7, the deployment of the rain resumed inspection work. In order to further improve the safety management, the quality and safety detachment issued a "notice on the ___ District construction site temporary electricity and building construction elevator safety special inspection" document to participate in the construction of units based on self-inspection and self-check, comprehensively carry out the work of the rain resumption of work inspection and focus on the temporary power lines, leakage protector and construction elevator for building the whole number of inspections to ensure that the construction site safety production.

Third, flood relief.

District quality and safety detachment during the flood control actively organize the construction projects in the region to carry out safety checks on circuits, racks, large-scale equipment, migrant workers dormitories and canteens. Take effective measures to eliminate hidden dangers, the construction site water all excluded, clean up the site in a timely manner. By now, the affected projects have all resumed construction.

The main leadership of the gardening department and the entire Institute of emergency action, *** more than 130 vehicles, rushed to the main roads and green belts, in the first time to rescue the greening results. By the garden workers to fight, *** counting about 1800 cubic meters of drainage, righting, reinforcing the fallen trees about 1600 plants, invested in manpower of more than 560 people, using 6-inch, 8-inch water pumps 18, generators 16, cranes, excavators, large and small chain rows of machinery such as more than 39 shifts. Parks to take temporary measures to prohibit the park, in the flooded park road intersections and lakeside and other dangerous locations to place the cue cards, determined to avoid the occurrence of safety accidents.

In order to remove the roads and residential neighborhoods as soon as possible, the municipal staff of all cadres and workers, in the relevant units of the 'cooperation, emergency rescue personnel more than 100, deployed engineering vehicles, temporary pumps, generators and other facilities for rescue. From 22:00 on the 25th to the early morning of the 28th, Nanhua Road pumping station, Zhou Xinzhuang pumping station, Jingu Road pumping station, the body of the North Road rainwater pumping station and other 10 pumping station 23 drainage facilities running at the same time, and for the Haihe River Road, the new purchase of a new large-scale pumps, a new transformer 4, after two days and two nights of fighting, remove the waterlogged main road Hongqi Road, Stadium Road North, Nanhua Road and Jingu Road, 4,457,400 cubic meters of water;; and Utilities Management Section **** 41 trips, 96 trips, in time to start the Tianjia Lake pumping station, Happy River temporary pumping station, Jingji Golf pumping station and other 7 pumping station 33 drainage facilities, the overall flow reached 25.5 cubic meters per second, the roads and residential areas of the water in a timely manner to remove, to ensure that the roads are smooth, and to maintain the safety of public utilities.

Fourth, the next step.

1, do a good job resuming work after the rain check. On the basis of self-check by all parties involved in the construction, focusing on temporary electricity, large machinery, deep foundation pits, scaffolding body, emergency plans and other aspects of the inspection.

2, urge the construction unit to effectively improve the ability to flood control work. In improving the emergency work plan at the same time, the purchase of flood control facilities, reserves of flood control materials, the implementation of flood control personnel, and in accordance with the emergency plan to organize regular flood control drills.

3, to further improve the flood season landscaping protection. Ensure that the flood protection and the prevention and control of pests and diseases after the rain, to create a good living environment in our region.

4, improve the emergency work plan of each department. Use the opportunity to compile the service system, the organization of personnel to improve the emergency work plan in detail, for the problems exposed in this work, the comprehensive development of improvement measures to ensure that the emergency work plan in the future flood control work to play a greater role.

Summary of rescue and relief work 5

According to the requirements of the city flood control office, the city supply and marketing this year, effectively strengthened the flood rescue and relief of safety precautionary work, specific to strengthen the leadership, the implementation of the responsibility to strengthen the measures, strengthen the inspection, etc., to ensure that the flood season safety, is summarized in the following work:

A strengthened leadership, to put the responsibility in place, to ensure the safety of the flood season.

First, grasp early, at the beginning of the year, the supply and marketing society held a special working meeting, this year's flood prevention, rescue and relief work has been arranged and deployed.

The second is to grasp the real, the city supply and marketing society and belongs to the eight directly under the enterprise are to implement the prevention of rescue disaster safety precautions "one job, two jobs", the development of flood prevention and rescue disaster relief work plan.

The third is to grasp the fine, the municipal society affiliated enterprises added flood rescue and relief flood prevention measures, flood rescue and relief supplies, funding and organization of rescue, specific evacuation lines, programs and other preparatory work into practice.

Second, strengthen the inspection to ensure flood safety

July to August, the city supply and marketing agency in accordance with the relevant requirements, the organization carried out a flood safety inspection. the end of July, the city supply and marketing agency's main leaders and leaders in charge of the three inspection teams, led by the eight directly under the key parts of the enterprise's flood safety facilities, equipment and so on, carried out a comprehensive inspection; in mid-August, and specifically on the fireworks company's Warehouse, part of the chain of distribution centers, tonic brewery, Lu brand wine company two production, operation of the enterprise's flood control and rescue emergency measures, etc. carried out two comprehensive inspection.

Their respective enterprises basically achieved "three", "four strengthened", namely: a work plan and emergency measures, emergency rescue teams and materials prepared, flood control safety duty records; strengthened leadership, strengthened the implementation of the responsibility, strengthened the Emergency measures to strengthen the development and implementation, strengthen the duty check, to ensure that the enterprises in this year's flood season in the production and operation of safety.

Rescue and relief work summary template five related articles :

★ 2021 flood relief work summary report 5

★ Flood rescue work summary template

★ 2021 the latest flood relief work summary

★ 2021 flood rescue work summary example Selected ten

★ Emergency management personal work summary template 5

★ 2021 flood control and flood relief work summary 10

★ 2021 Henan flood work summary report 5

★ 2021 flood relief personal work summary

★ 2021 Flood Control and Flood Relief Summary

★ Flood Control and Flood Relief Work Summary

★ 2021 flood control and flood relief work summary

★ Henan flood relief work summary 2021 latest