How to control the quality of building production factors.

1, control of labor subject.

During construction, the control of the labor force should be considered first.

First, by strengthening ideological education, improve the quality awareness of cadres and workers, and establish the concept of quality first, pre-control first, serving users, speaking with data, and combining enterprise benefits with social benefits.

Second, the quality skills of cadres and workers can be improved by selecting the best and strengthening education and training in skills, so that leaders have strong quality management decision-making ability and organizational ability, managers have strong quality target management, construction organization, technical guidance and quality inspection ability, operators have superb technical skills, can strictly implement quality standards and operating procedures, and logistics personnel can do a good job in service and logistics support.

Thirdly, reasonable organization, strict examination and necessary incentive mechanism will make employees' potential ability get the best combination and give full play, thus ensuring that the labor subject plays a self-control role in the quality control system.

2. Control of labor objects.

The main contents of quality control of raw materials, semi-finished products and equipment are: controlling the conformity of materials and equipment performance, standards and design documents; Control the technical performance indicators, inspection and test indicators of materials and equipment to meet the standard requirements; Control the acceptance procedures of materials and equipment and the integrity of quality documents.

3. Construction technology control.

The quality control of construction technology mainly includes:

First, comprehensively and correctly analyze the engineering characteristics, key technologies and environmental conditions, and define the quality objectives;

The second is to formulate a reasonable and effective construction technical scheme and organization scheme. The former includes construction technology and methods, while the latter includes construction section division, construction flow direction and labor organization.

Third, choose construction machinery and temporary construction facilities reasonably, and arrange the general construction plan and construction plans in each stage reasonably;

Fourth, choose and design construction equipment such as molds and scaffolding to ensure quality and safety;

The fifth is to prepare the special technical scheme and quality management scheme for new technologies, new processes and new materials used in the project;

Sixth, in order to ensure the quality of the project, it is still necessary to work out the influence of unfavorable environmental factors such as meteorology and geology on the construction and its countermeasures according to the specific conditions of the project.

4. Control of construction equipment.

Mechanical equipment used in the construction, including lifting equipment, various processing machines, special technical equipment, inspection and measuring instruments and equipment, and elevators for both people and goods, should be controlled in terms of equipment selection, main performance parameters and operation requirements according to the needs of the project.

5. Control of construction environment. The influence of environmental factors on engineering construction is generally difficult to avoid. In order to eliminate its adverse effects on construction quality, the control methods of prediction and prevention are mainly adopted.