Introduction to the bidding process for material procurement

In the process of bidding for procurement, the bidding process for different projects is much the same. Today I will introduce the material procurement bidding process is how, interested friends may wish to take a look!

Introduction of material procurement bidding process

1, bidding announcement: equipment section will require medical equipment project name, technical indicators, bidding time, bidding location and bidding process and so on successively online publicity, publicity time ≥ 30 days. In case of special circumstances, delayed bidding or change the technical items, indicators, will be one week in advance of the online statement.

2, qualification examination: the bidding unit is required to bidding within the effective period, according to the bidding requirements, the relevant documents at the designated time to the equipment section. Equipment Section is responsible for the collection and summarization of the qualification materials of the bidding unit, reported to the bidding agency for review.

3, bidding publicity: bidding units need to be in accordance with the requirements of the tender, the sealed standard bidding instruments at the designated time to the designated location, unified publicity.

4, bidding evaluation: evaluation (negotiation) bidding group in the publicity of the bid, the bidding of the cost-effective comprehensive evaluation, evaluation of the results of the summary reported to the Ministry of the finalization.

The concept of material and equipment procurement bidding

Engineering construction project equipment and materials refers to all types of equipment and engineering materials used in construction projects (including steel, cement, sand, gravel, commercial concrete, prefabricated concrete components, wall materials and piping, windows and doors, waterproofing materials, etc.).

Tendering for the procurement of engineering materials and equipment refers to the bidder for the required engineering materials and equipment, to suppliers for inquiry or through the bidding method to set up, including the quality of commodities, period, price based on the subject, invite a number of suppliers to compete through the tender offer, the bidder from which the winner is selected and reached a transaction agreement with it, and then according to the contract to realize the subject of the procurement method. Material and equipment procurement bidding not only includes pure procurement of bulk construction materials and small and medium-sized equipment of stereotyped production, but also includes the whole process of the implementation stage of the comprehensive procurement of materials and equipment, transportation, installation, commissioning and other work in accordance with the requirements of the project.

More about engineering/service/procurement tender writing production, enhance the winning rate, you can click the bottom of the official website customer service free consultation:/#/?source=bdzd