How to write a commission contract

1. How to write a commissioning contract example

Commissioned by the party (Party A): the processing party (Party B):

Commissioned by the party (hereinafter referred to as Party A) and the processing party (hereinafter referred to as Party B) collectively referred to as the two parties. Party A and B on an equal and voluntary basis, after friendly consultation signed this agreement.

First, commissioned the processing project

1, commissioned the processing of products: _______________

2, the number of products processed: _______________

3, the product delivery period: according to the Party B to take the order from the delivery of the _____ working days.

Second, commissioned the processing mode

1, Party B package materials, Party B must be in accordance with the requirements of Party A selection of raw materials.

2, Party B on the quality of raw materials warranty period of one year.

3, quality requirements and technical standards

1, Party B strictly in accordance with the quality requirements put forward by Party A for processing.

2. Technical standards refer to GJ standards.

Fourth, packaging requirements and delivery location

1, Party B according to Party A's requirements for packaging; for Party A does not have special requirements for the parts of Party B to choose their own packaging.

2, Party A designated location for delivery, the location is limited to _____.

Fifth, the cost of settlement

1, the total cost of the processing of RMB (upper case) _____, (lower case) _____ yuan, the price does not include tax. The specific details are shown in Annex II.

2, Party A first pay Party B 30% of the total purchase price as a deposit. Party B delivery by Party A acceptance is determined by Party B to issue an invoice to Party A, invoicing to pay the tax amount by Party A back to Party B. Party A receives the invoice within 5 working days to pay 50% of the total purchase price, delivery of 20 working days from the date of payment of the remaining 20% of the total purchase price.

3. Party A will settle with Party B by bank remittance or direct payment from the State Treasury.

VI. Default responsibility

1, Party B must be strictly in accordance with the provisions of the two sides of the time of delivery, such as late delivery, Party B shall pay Party A 5% of the purchase price of liquidated damages.

2, Party B conceals the defects of raw materials or the use of non-compliant raw materials and affect product quality. Party A has the right to require Party B to redo, reduce the price or compensation for damages and other liabilities.

3, Party B shall not unauthorized production of Party A's patented products or infringement of Party A's patent products, shall not disseminate the drawings provided by Party A to any third party, otherwise the infringement caused by Party B, Party A reserves the right to pursue Party B's legal responsibility.

VII, the way to resolve contract disputes

1, the two sides of this agreement signed and sealed will come into force, the implementation of the process of dissent, the two sides should be friendly negotiation to resolve the consultation fails to be in accordance with the relevant provisions of the "Contract Law". Eight, other agreed matters

1, this agreement, if any outstanding issues, the two sides can be negotiated separately, on the basis of consensus for additional modifications.

2, this agreement in four copies, each party holds two copies, with the same legal effect.

Commissioned by (Party A): (seal) representative signature (or seal):

Monthly

Processing party (Party B): representative signature (or seal):

Monthly

Attachment: the name of the bank of account, account name, account number and line number of Party B are as follows:

Accounting Bank: Account name: Account number: Line number:

2. How to write a commissioning contract model

Party A: Party B:

Now the unit commissioned to assist in marketing, A and B should consciously abide by the following agreement:

1, Party B should be taken from the party A Party B shall take samples from Party A and market them according to the scope of the sales area designated by Party A.

2.

2, Party B in the determination of sales customers, sales quantities and sales unit price, to provide the corresponding valid address and contact person to Party A, Party A shipments.

3, as Party A does not force Party B to single engage in this work, so in Party B to complete the box / month after the sales task of Party A to pay Party B yuan / month of the award, the task is not completed do not cash prizes; the basic task of the part of the order price can not be lower than the unit price of the 1.18 times out of the warehouse; more than the basic task of the part of the difference in the price of the unit (the order unit price and the difference between the unit price and out of the warehouse za) and the number of prizes. And Party B bear all the personal expenses such as social security, medical care, work injury, travel expenses.

4, Party B is obliged to assist the purchasing unit to fill out the purchase order, Party A received the order payment before the goods out of the warehouse, and give the shipment according to the requirements of the order. Sales staff are obliged to monitor their expanding customers in accordance with Party A's designated market unit sales price of $ / box for sales.

5, such as purchasing units in a single purchase of more than boxes, Party A combined with the prevailing freight market renegotiation of the unit price of the warehouse to give free shipping. (Specific to each purchase order shall prevail)

6, Party B's new sales customers can be opened up in a single month out of the box, then Party A to give Party B yuan reward.

7, the amount of incentives according to the 6th point of the award percentage increment.

8, such as Party B to open up sales customers are Party A has customers, will not be honored.

9, all the resolution of this product is owned by Party A.

Party A is the sole owner of the product.

Party A: Party B:

3. How to write a commissioning contract model

Commissioned by: (hereinafter referred to as Party A)

Trusted by: (hereinafter referred to as Party B)

In order to ensure that high quality and high speed to complete the construction of the project, by the full consultation between the A, B and the two sides. Following the principle of equality and mutual benefit, voluntariness and openness, Party A cooperates with Party B, which has good reputation and strong financial strength, and entrusts Party B to carry out the procurement of engineering materials/equipment required for the construction of the project. After full consultation between Party A and Party B on the basis of equality and mutual benefit, *** with the agreement reached and signed as follows:

Article I commissioned content

Party A entrusted Party B to purchase the following engineering materials/equipment within the scope of the project on behalf of the project:

Article II commissioned by the way

1, Party B in its own name in accordance with the terms and conditions of the Party A with the supplier to sign a material/equipment Purchase contract. However, Party B shall instruct the supplier to issue an invoice with Party A as the payer (purchaser) and hand over the original invoice and a copy of the material/equipment purchase contract to Party A.

2.

2. Party B accepts Party A's entrustment to deal with the entrusted contents agreed in this contract without compensation.

Article 3 Contract Price and Payment Methods

1. Contract Amount: According to the expected quantity of materials/equipment and the unit price of materials/equipment agreed by both parties, the contract amount is expected to be _____ million yuan. (See attachment) This amount is the estimated amount of estimated or designed quantities and cannot be used as the basis for final settlement and payment. The final settlement amount will be determined by multiplying the actual quantity of materials/equipment consumed by the unit price of materials/equipment signed by both parties at the end.

2, the project quarter / month measurement:

Party A quarter / month before the completion of the quarter / month of Party B quarter / month purchases and supervisors, quality inspectors check and experimental inspection qualified, in line with the requirements of the project quality of the materials signed, Party B shall be responsible for the provision of the purchase of materials / equipment related information.

Party A approved Party B quarter / month after the purchase of materials / equipment volume, according to the unit price agreed upon by the two sides to calculate Party B quarter / month to complete the materials / equipment, less quality assurance deposit and other deductions, the person in charge of Party A and B signed by the recognition, the settlement as the month / month for the payment of the basis and completion of the settlement of the voucher. Party A in the receipt of the owner to pay the current measurement of the project, Party A financial personnel to verify the written agreement, the actual amount payable to Party B at a later date.

3, the completion of the project settlement:

In this agreement, the project is fully completed, by the supervision, the owner of the acceptance of measurement, Party A will be the agreement with Party B for the completion of the project settlement.

According to the quarterly/monthly quarterly/monthly statement signed by Party A and Party B, the completion of the project settlement, the completion of the settlement of the quality deposit according to the completion of the project settlement of 5% of the amount of money withheld by the signature of the person in charge of Party A and Party B, after the settlement of the completion of the project to pay the basis for recognition.

4, the balance of payment:

The remaining 5% of the contract price as a quality deposit (warranty period of years, calculated from the date of acceptance of the completion of the project), no quality problems during the warranty period or Party B completely fulfill the obligations of the warranty, the warranty period expires within _____ days of the balance of the payment, the warranty deposit does not accrue interest.

Article IV Quality of Materials/Equipment

1. The materials/equipment purchased by Party B must comply with the current standards and specifications issued by GJ and the Ministry of Transportation, as well as the relevant requirements of the owner of the project, and provide the corresponding quality certificates (e.g., material reports, factory certificates, etc.) in accordance with the requirements of the Party A, the owner and the supervision requirements of the inspection and approval of the Party A reported to the Supervisory Board and the owner before being used in the project. Agreed before being used in the project.

2. At any time during the construction of the project (even after acceptance and measurement), Party B must be responsible for the rework costs and the resulting fines and damages if the materials/equipment purchased by Party B are found to be unqualified or have hidden quality defects in any way (including various inspections organized by the government's quality supervision department, the Owner, the Supervision Engineer or Party A).

4. If Party B is responsible for purchasing and supplying materials/equipment, etc., which leads to the failure of this contract section to win awards or penalties in various inspections and competitions organized by units at all levels, Party B shall bear the full responsibility and all the losses caused by Party A.

5, if the owner, supervision or Party A quality control engineers found that the quality of Party B's supply of materials/equipment does not meet the requirements of the construction specifications and the responsibility is borne by Party B, Party B shall be responsible for the return of defective materials/equipment out of the field without any compensation, and Party B shall bear the overdue delivery and economic losses caused by the defective materials/equipment.

6. Party B is responsible for purchasing and supplying the materials/equipment for the reason that the quality of the project accidents, defects and losses caused by Party A shall be borne by Party B.

Article 5 Obligations of both parties

(a) Party A's obligations

1, is responsible for quarterly/monthly measurement and settlement of Party B's materials/equipment on time; Party B shall be paid in accordance with the provisions of this Agreement.

(2) Party B's obligations:

1, Party B should be in accordance with the conditions agreed by Party A and the supplier to sign a contract, timely payment to the supplier of materials / equipment required by Party A payment;

2, the main materials / equipment into the field before the main materials / equipment are in accordance with the requirements of the Certificate of Conformity and test reports, and samples are provided by the construction side, the Supervisory and the Party confirmed that, or not be used.

3, the main materials / equipment into the field, are in accordance with the requirements of the certificate of conformity and test reports. According to GJ regulations, the materials/equipment to be retested are sampled and tested by Party B in cooperation with the supervisory unit, and the cost is borne by Party B.

4. All raw materials/equipment, semi-finished products, components, equipment, etc. used in the project must have a quality certificate or inspection certificate, otherwise it shall not be used in the project agreed in the contract, and Party B shall be responsible for the obligations and costs of raw materials/equipment, semi-finished products, components, equipment, etc. for on-site retesting.

5. Party B shall make full and timely payment to material/equipment suppliers and other payments. If Party B fails to make full and timely payment to the material/equipment suppliers and other payments, resulting in the occurrence of Party A's direct payment to the material/equipment suppliers, Party A has the right to deduct directly from the amount payable to Party B (including quality guarantee). If Party B fails to pay the material/equipment suppliers in full and on time for the goods and other payments, causing losses to Party A, Party B shall compensate.

6. If the supplier violates the contract it signed with Party B, the supplier should be held responsible for the breach of contract in time.

7, Party B is responsible for all materials / equipment equipment unloading fees, site site materials / equipment equipment, secondary handling costs, vertical transportation costs.

8. The construction contract and all documents signed between Party A and the owner are equally binding on Party B, and Party B must comply with them.

Article 6 Commissioning Period

The validity period of this contract is from the date of signing this contract to the time when Party A informs Party B in writing of the termination of this contract.

Article 7 Dispute Resolution

Party A and Party B shall first resolve the contractual dispute through full consultation, and if the consultation fails, it shall be submitted to the Wuhan Railway Transportation Court for litigation.

Article IX other

1, the contract is not yet complete, A and B can be based on the specific circumstances and relevant laws and regulations **** with the consultation, to make additional provisions, additional provisions and the contract has the same effect.

2, the original two copies of this contract, the two sides each hold a copy, Party A four copies, by the legal representative of both parties or the legal representative authorized by the proxy signatures take effect. (If this contract is authorized by the legal representative of the commissioned agent, must be attached to the power of attorney before signing the contract). The original and the duplicate have the same legal effect.

Party A: (seal) Party B: (seal)

Address: Address:

Legal representative: (Signature) Legal representative: (Signature)

Entrusted agent: (Signature) Entrusted agent: (Signature)

Accounting bank: Accounting Bank:

Account: Account Number:

The contract is concluded Date: month and year

4. How to write a sample contract of entrustment

Entrusted by: __________________ (hereinafter referred to as Party A)

Entrusted by: __________________ (hereinafter referred to as Party B)

In accordance with the relevant provisions of the _________ Municipal Land Resources and Housing Administration and the Municipal Price Bureau, Party A entrusts Party B to undertake the application for real estate legal documents. Party A and Party B, after consultation, reached the following agreement:

First, the subject matter of the commissioning of the overview

The premises are located: _______________________ No. _________ building; building area: _________ square meters; _________ sets.

Second, Party B undertakes the work

1. Organize all the relevant legal documents, instruments and other information submitted by Party A.

2. Fill in all kinds of application forms and send them to the relevant departments for review.

3. Coordinate the fulfillment of the various approval procedures of the relevant departments.

4. Acting on behalf of the Party to establish the relevant files to the relevant departments.

5. Agent Party A to receive the title certificate after the approval of the relevant departments, the title certificate of the mortgage according to the agreement by Party B and the school **** with the transfer to the developer, a one-time payment of the title certificate according to the agreement by Party B to deliver to Party A.

3.

Third, Party A to provide the following auxiliary work

1. Submission of complete information:

(1) ID card, a copy of the hukou book (a copy of the property owner's seal,

(2) a copy of the invoice for the purchase of a copy of the invoice

(3) the contract for purchase of the purchase of a copy of the bill of sale and settlement

(4) the Beijing Municipal residents to buy affordable housing audit form and a copy of the property book. One copy each of the form and property book.

2. Fees to be paid

(1) Deed tax: _______% of the purchase price of the house

(2) Stamp duty: _______% of the purchase price of the house

(3) Fees for the drawing of plans and forms: _______ yuan/square meter

(4) Tax invoices: _______ yuan/set

(5) Excessive standards: _______ yuan/set

(6) Taxation fee: _______ yuan/set

(5) Comprehensive land value payment for over-standard purchase of affordable housing: _______% of the house price of the over-standard area

Fourth, the date of commissioning work and time limit for the work

This power of attorney shall take effect on _______ the _______ day of the _______ month. The contracted work shall be completed by _______ _______ (the deadline shall be based on the date of receipt of the document replacement). If this contract cannot be performed on time due to force majeure, it shall be postponed by mutual agreement.

V. Commissioned service fees

Party B on the date of acceptance of the commission to charge a service fee of _______ yuan / set

VI. Liability for breach of contract

Due to Party B for every two months after the completion of the work returned to Party A service fee of _______%, due to the reasons of Party A can not be performed in accordance with the agreed time limit of the contract to be coordinated by the two sides to resolve.

VII. If there are any outstanding issues, the two sides need to make another agreement.

VIII, this contract in duplicate, A and B each party.

Party A: _____________________

Party B: _____________________

Date: _____________________

5. How to write a sample of the commissioning contract

Party A:

Legal representative:

Address:

Tel:

E-mail:

Party B:

Legal representative:

Address:

Tel:

E-mail:

Party A and Party B on the commissioning by Party A of the Party B to purchase the _______________ under this contract, Party B accepts Party A's entrustment matters, according to the "Chinese People's *** and the State Contract Law" of the relevant provisions of this entrustment contract (hereinafter referred to as this contract):

I. Entrusted content

Party A entrusted Party B to purchase the contract agreement on behalf of Party B, or Party A otherwise orally or in writing entrusted to Party B to Purchase _______________.

Second, (a) the list of quotations

1, Party A entrusted Party B to purchase on behalf of the specific products are:

Serial number

Product name

Specifications

Brand

Quality requirements

Quantity

Unit price

Total price

The total price of the amount: RMB _______________ (capitalized: _______________ whole).

2. Party A may also entrust Party B to purchase other products at any time verbally or in writing.

(2) Party B's responsibility

1, Party A's required purchasing business by Party B due diligence in the implementation of the supervision, and at any time to Party A to report progress.

2, for Party A to find qualified manufacturers, truthfully provide the factory production and operation status.

3, for Party A to find the required samples and items, for Party A to take samples, goods inspection, shipping matters.

Third, the scope of Party B's responsibilities

1, Party A directly order to Party B, Party B is solely responsible for a series of services from the receipt of orders to shipment (Party B in any third-party manufacturers have nothing to do with Party A). Party B then order to the factory for production.

2, Party B received a detailed description of the inquiry form, must be in _______ days to provide product quotations to Party A (in the event of special and force majeure factors except).

3, Party B to ensure that the goods provided by Party B's profit margin within the unit price in the _______________ region's lowest, such as Party A has found the same model with the same style, the same material under the premise of the unit price is lower than the unit price of the goods provided by Party A and Party B to the Party A investigation and forensic evidence (non-original manufacturers and the exception of the vicious competition), Party A has the right to recover the difference of the goods to the price of the price problem to the party. The difference in price of the goods.

Fourth, on the delivery date and quality

1, delivery date: each batch of goods need to be agreed in accordance with the purchase order of the period of shipment. Party B is responsible for supervising the production progress. If the delivery is delayed due to objective reasons, Party B should submit a written explanation of the reasons for Party A, in order to obtain Party A's understanding of the permission to extend the delivery time. If the delivery is delayed due to Party B's unauthorized changes, Party A's related economic loss and legal responsibility borne by Party B.

2, quality: Party B must be completely in accordance with the quality of the sample to organize production and shipment. (Sample confirmation to be signed and stamped by both sides of the respective seal.)

V. Acceptance criteria and breach of contract

1, before the goods out of the warehouse, Party B must provide into the goods sample to Party A to confirm. To be confirmed by Party A no quality problems before shipping arrangements, at the same time, Party A should have a commodity acceptance letter to Party B. If the goods do not meet the quality standards, Party B will not be able to accept the goods. If the goods do not meet the requirements of Party A, there are two kinds of responsibility:

(1) If Party A is caused by the quality requirements on the purchase order is not clear, Party A will bear the responsibility.

(2) If the quality problem occurs because of the loopholes committed by Party B in the referral to the factory, the responsibility is assumed by Party B.

2, Party B purchasing inspection will have to fully comply with Party A's instructions and requirements of the operation. To do strict product inspection, if necessary, need to do a full inspection of the product, Party A should pay in advance the corresponding inspection labor costs. To ensure the quality of the products. If the quality of the products delivered is defective due to Party B's negligence in purchasing and inspection, thus causing Party A's economic loss, Party B shall bear the corresponding responsibility.

3, if one party defaults on the other party's economic losses, the other party can immediately terminate the contract, and have the right to pursue the default of the relevant legal and economic responsibilities.

Sixth, the payment method

Party B needs to provide shipping documents, inspection reports and official invoices, to be confirmed by Party A after the error, in _______ days Party A to pay the payment into the account of the company Party B, the consignment of goods required by Party B to bear the cost.

VII. Other costs borne by Party A

1, Party A's goods, such as the need for additional deep processing, such as barcode, repackaging, classification, etc., and the temporary need to cut, the processing costs incurred by the increase in staff, agreed by Party A Party B can apply for subsidies to Party A.

2, Party B can apply for subsidies to Party A, and Party B can apply for subsidies.

2, if there is a need to go directly to the factory inspection, the accommodation costs by ¥ _______ standard by Party B, beyond the accommodation costs borne by Party A itself.

3, the party's company personnel and customers, if they come to do business visits and procurement, Party B has to assist in sending cars and send staff to participate in business activities, transportation arrangements, accommodation and other matters, the costs incurred by the party to bear.

4, Party A guarantees that within the validity of the contract _______________ region only accept all the goods provided by Party B, Party A shall not contact _______________ regional manufacturers and agents. If Party A's breach of contract causes Party B's economic loss, Party A shall compensate Party B for the corresponding economic loss.

Eight, confidentiality agreement

A and B should be the two sides of the cooperation of information and sources of goods channel is responsible for confidentiality, confidentiality responsibility. A and B shall not disclose any personnel of the two companies to any third party cooperation information, such as leakage behavior caused by Party A or Party B's economic losses, after Party A or Party B to verify and provide relevant evidence, the leaking party to be leaked to compensate for the party's economic losses.

Nine, the duration of cooperation

The two sides of the cooperation period for _______ years, that is, _______ year _______ month _______ to _______ year _______ month _______ day, the two sides of the cooperation period if there is any disagreement can be modified by negotiation or another supplementary agreement. After the expiration of the agreement, Party B enjoys the right to sign the agreement on a priority basis.

X. Dispute resolution

In the event of differences during the cooperation period, the two sides can negotiate to resolve the failure to resolve 'by the _______________ people's court for adjudication.

This agreement is in duplicate, each side of the two sides, since the two sides signed and sealed after the entry into force.

Party A (seal):

Legal representative (signature):

Date: _________ year _________ month _________ day

Party B (seal):

Legal representative (signature):

Date. _________ month _________ day