Engineering construction bidding tender documents
Project No.:
Project Name:
Tender Document Content: Bidding Documents Bidding Letter Part
Bidder: (Seal)
Legal Representative or his proxy: (Signature or Seal)
Date: Table of Contents Legal Representative Identity Certificate Tender Documents Signing Authorization Letter Tender Letter Tender Letter Appendix Tender Stretcher
Bank Guarantee Format Tender Guarantee Tender Documents Other Tender Information Required to be Submitted by the Bidder
Name of the Unit:
Nature of the Unit:
Establishment:
Operation Period:
Name: Sex: Age: Position: Department of the ( Bidder Name: Gender: Age: Position: is the legal representative of ( Bidder Name ). Hereby certify that. House building and municipal infrastructure construction tender documents
Two, the tender documents signed by the power of attorney
This power of attorney declares: I (name) is the (name of the authorized person) of the legal representative of the (name) is authorized to delegate the (name) of the (name) of the unit to sign the bidding documents for the project for my company's legal representative of the authorized agent, I recognize that the agent has full authority to sign the tender documents of the project on behalf of I recognize the contents of the bidding documents for this project signed by me.
The agent has no right of sub-delegation, hereby entrusted.
Agent: (signature) gender: age:
ID number: position:
Legal representative: (signature or seal)
Date of delegation:
To: (name of the bidder)
1, according to the bidding documents of your bidding project No., in accordance with the relevant provisions of the project, after a site survey and study the bidding instructions of the above tender documents. And after studying the bidding instructions, contract terms, drawings, construction standards and bill of quantities and other relevant documents of the above bidding documents, we are willing to (currency, amount, unit) (lower case) of the bidding price and according to the above drawings, contract terms, construction standards and bill of quantities of the construction of the above construction, completion of the construction, and bear any quality defects in the warranty responsibility.
2, we have examined in detail all the bidding documents, including modification documents (if any) and relevant attachments.
3,We acknowledge that the addendum to the bidding letter is an integral part of our bidding letter.
4,In the event that we are awarded the tender, we undertake to complete and hand over all the works within a period of calendar days as specified in the contract agreement.
5,If we are awarded the contract, we will submit a bank guarantee for % of the above total price or a performance guarantee for % of the above total price issued by a qualified and competent guarantee institution as a performance guarantee.
6,We agree that the bidding documents submitted by us shall be valid during the bidding validity period specified in Clause 15 of the Instructions to Bidding Applicants, and we shall be bound by it if we are awarded the bid within this period.
7, Unless otherwise agreed and effective, your notification of award and this tender document will become part of the contractual documents binding the parties.
8,We will submit (currency, amount, unit) as a bid security together with this bid letter.
Legal representative or agent: (signature or seal)
Accounting bank name:
Accounting bank account: date
Four, the bid letter appendix No. item content contract terms No. agreed content Remarks performance bond bank guarantee performance guarantee amount of the contract price of the % of the construction of construction preparation time after the signing of the contract of the days after the missed liquidated damages amount of yuan days missed Compensation fee limit advance schedule award construction total construction period calendar days quality standard project quality advance payment amount advance payment bond amount progress payment time days after the issuance of monthly payment vouchers completion settlement payment time days after the issuance of completion settlement payment vouchers warranty period based on the warranty agreed period
Four, the bidding documents
Five, the tender security bank guarantee format (the specific format provided by the guaranty bank)
Four, the tender documents
Five, the tender security bank guarantee format (the specific format by the guaranty bank) Provided by the guarantee bank)
VI. Bid Guarantee
To: (Name of Bidder)
Based on this Guarantee, (Name of Bidder) as the principal (hereinafter referred to as the Bidder) and (Bid Guarantee Agency) as the guarantor (hereinafter referred to as the Guarantor)**** the same (name of the Bidder) (hereinafter referred to as the Bidder) bear the responsibility of paying (currency, amount, unit) (lowercase) (hereinafter referred to as the Bidder), and both the Bidder and the Guarantor shall be bound by this Guarantee.
The Guarantor is willing to provide the Bidder with a Bid Security in view of the Bidder's participation in the Bidding of the Bidder's (Bidding Project).
The conditions of this guarantee are as follows: if the Bidder, after receiving the Notice of Award from you during the period of validity of the Bid: fails or refuses to sign the Contract Agreement as required by the Instructions for Bidding; fails or refuses to submit the Performance Bond as required by the Instructions for Bidding; withdraws the Bidding Documents during the period of validity of the Bid. Provided that you specify the conditions under which any of the foregoing occurs, the Guarantor shall, upon written demand by you, pay to you the full amount of the foregoing without the necessity of adequate proof of demand by you.
The Guarantor shall not be liable for any amount greater than the amount specified in this Guarantee, or for any amount greater than the difference between the Bidder's Bid Price and the Bidder's Award Price. The Guarantor hereby confirms that the liability under this Guarantee shall be valid for a period of 28 days after the expiry of the validity period of the tender or extended tender, and that in the event of an extension of the validity period of the tender it shall not be necessary to give notice to the Guarantor but that any claim for payment shall be delivered to the Tenderer during the validity period of the tender as aforesaid.
Guarantor: (seal)
Legal representative or proxy: (signature or seal)
Postal code:
Seven, bid bond: (name of the construction unit) I accept your invitation to participate in the project bidding, in accordance with the requirements of the bidding documents, I now submit the bidding bond yuan (capitals: whole)
The conditions of this guarantee obligation is: if the bidder in the bid specified in the bid validity period to withdraw the bid; if the bidder in the bid validity period to receive the construction unit issued by the notice of award; failure or refusal to bid in accordance with the provisions of the notice of the contract agreement signed on request; failure or refusal to bid in accordance with the provisions of the notice of the contract agreement, the failure or refusal to provide a performance bond. Violation of the provisions of the relevant bidding laws and regulations on the abolition of the bid. The bidder has the right to forfeit the bidder's deposit. When a bidder is unsuccessful, the bidding documents and accompanying drawings and other information may be returned, and the bidder may also return the bid deposit to the bidder. (No interest) bidding unit (official seal) bidding unit legal representative (signature, seal)
Eight, the bidding documents require bidders to submit other bidding information (this item has no format, when needed by the bidder with the form of text) bidding documents business part of the format
Bidding documents: bidding documents, business part of the table of contents (the use of the comprehensive unit price form)
(). This part of the requirements of the bidding documents and the forms of the software of the quantity of work shall prevail)
Specifications of the tender price
Two, the tender price summary table
Three, the main list of materials quoted price
Four, the list of equipment quoted price
Five, the works list quoted price
Five, the measures of the project quoted price p>
Seven, the other items quoted price
VIII, other items quoted price p>
VIII, the works list quoted price
VII. p>
VIII. Price Calculation Sheet for Bill of Quantity Items
IX. Other Information Required for Bidding OfferThis offer is prepared in accordance with the relevant provisions of the bidding instructions for the project and the text of the contract. Bill of quantities of work price list filled in the comprehensive unit price and the average price including labor, materials, machinery, management, profit, taxes, and the use of fixed-price projects measured risk and other costs.
Measures to fill in the project bidding table measures project offer. Including the cost of measures that must be taken to complete the construction of the project.
Other items entered in the bidding table of other items, including the bill of quantities and measures outside the project bidding table, in order to complete the construction of the project must be incurred in other costs.
The bill of quantities of each single item should be filled in the unit price and the total price, the cost of the project without filling in the unit price and the total price, is considered to have been included in the bill of quantities of other unit price and the total price.
The currency of this offer is the bidder should be bidding for the matters that need to be clarified, written in writing and bidding for the table together.
The technical part of the bidding documents format
Tender documents: technical part of the bidding documents
Bidder: (seal)
Legal representative or his proxy: (signature or seal) construction organization design project management organization equipped with the project to be subcontracted table
1, the bidder shall prepare the construction organization design, including Bidding documents, volume I, chapter 1, bidding instructions 11.4 basic content of the construction organization design. Preparation of specific requirements are: the preparation should be used in writing and combined with the form of charts to illustrate the construction method of sub-parts of the project; to be invested in the main construction machinery and equipment, labor force plans, etc.; combined with the characteristics of bidding for the project to put forward a practical quality of the project, safety, civilized construction, construction progress, technical and organizational measures, at the same time should be the key process, the complexity of the link focusing on corresponding technical measures, such as the winter and rainy season construction technical measures, such as the construction of the construction of the project. Rainy season construction technology measures, reduce noise, reduce environmental pollution technology measures, underground pipelines and other underground facilities on the ground to protect the reinforcement measures. Work organization design in addition to the text should be accompanied by the following charts, charts and format requirements are attached.
2, construction organization design in addition to the text should be accompanied by the following charts, charts and format requirements attached.
2.1 to be put into the main construction machinery and equipment Table 1.1
2.2 labor schedule Table 1.2
2.3 plan to start, completion date and construction progress network diagram 1.3
2.4 construction plan diagram 1.4
2.5 temporary land table 1.5 to be put into the main construction machinery and equipment table ( Project Name) Project Table 1.1 Serial No. Machinery or Equipment Name Model Specification Quantity Country of Origin Year of Manufacture Rated Power (KW) Production Capacity Used for Construction Parts Labor Schedule (Project Name) Project Table 1.2 Work Type by Construction Stage of the Project Input Labor Force
Note:1. Bidders shall submit the estimated labor schedule including subcontractors in the listed format.
2. This schedule is prepared on the basis of an eight-hour work shift. Planned Start and Completion Dates and Construction Schedule Network Table 1.3
1,The Bidder shall submit a construction schedule network or construction schedule showing the various critical dates for the construction of the project in accordance with the schedule required by the Bidding Documents. The successful bidder shall also submit a detailed construction schedule in accordance with the relevant provisions of the Conditions of Contract.
2, the construction schedule can be used network diagram (or crosswalk diagram), indicating the planned start date and the completion date of each phase of the sub-projects and the date of signing the subcontract.
3, construction schedule should be compatible with the construction design. Construction general plan 1.4 The bidder shall submit a construction general plan, drawing the temporary facilities on site layout diagram with text description, explaining the temporary facilities, processing workshop, site office, equipment and storage, power supply, water supply, sanitation, living and other facilities and layout.
Temporary land table (project name) works table 1.5 use area (m ) location of the time required to total
Note: 1. Bidders should fill out the table, pointing out all the temporary facilities and detailed use of the land area.
2. If the table is not enough, you can add the attached page. Project management organization is equipped with table 1.6 project manager resume table table 1.7 project technical director resume table 1.8 project management organization is equipped with auxiliary information table 1.9 project management organization is equipped with table 1.6 (project name) engineering position name name name of practice or professional qualification certificate has been assumed in the construction of the project certificate name level number professional original service unit project number of the main Project Name Once we win the bid, we will implement the project manager responsibility system, and equipped with the above project management organization. We guarantee that the above content is true, if not true, willing to accept the relevant provisions of the treatment. Project management team set up, the division of responsibilities and other information attached to explain the project manager resume form (project name) engineering table table 1.7 name gender age title qualifications to participate in the work time as a project manager for the number of years the project manager qualification certificate number of the project under construction and completed projects construction unit project name construction scale opening, completion date under construction or completed (3) project technical responsible person resume form (project name) engineering table (project title) engineering table 1.7 name, sex, age, title qualifications to participate in the work time as a project manager years project manager qualification certificate number in the construction and completed projects construction unit project name construction scale opening, completion date in the construction or completed (3) project technical responsible person resume form ( Project name) engineering table 1.8 years as a technical person in charge of (4) project management organization with auxiliary information (project name) engineering table 1.9
Note: 1. Auxiliary information mainly includes the management body of the agency setup, division of responsibilities, the relevant photocopying of the information as well as bidders think it is necessary to provide the information. Auxiliary description of the information format is not standardized, by the bidder's own design.
2. Project management team with the situation of auxiliary information is attached (bound with the tender documents).
(Project name) Project Table 1.10 subcontractor name address legal representative business license number qualification certificate number to be subcontracted project main content of the project is expected to cost (million yuan) has been done in a similar project