Electrical engineer technical personal work summary

Summary is also a discipline, because if we can our work will summarize the experience, learn to summarize the failure, that we are not far from success, so do not ignore the importance of the summary, hurry up to write a it. Below by me to bring you the electrical engineer technical personal work summary sample, take a look at it!

Electrical engineer professional and technical work summary (a)

Looking back on the work of the year, under the leadership of the company's leadership, the assistance of colleagues, the cooperation between the various departments, strict requirements for their own, in accordance with the requirements of the company's system, and better complete their own work. Through a year of study and work, the work mode has a new breakthrough, the way of work has been a big change, is now a year to summarize the work situation, please company leaders to put forward valuable advice and suggestions.

A ﹑ 20X year to complete the main work

1 ﹑ complete the handover of the design institute, collect all the electrical design information provided to the design institute, formally carry out the work with the design institute, the design work to the normal process;

2 ﹑ and the design institute to communicate with the site to view the opening and closing of the substation, the arrangement of the high and low voltage equipment layout plan. With the design institute professionals to exchange design opinions, complete the opening and closing, substation out of the map;

3 ﹑ with the electric power installation company leather museum high and low voltage equipment installation to complete the work;

4 ﹑ with the construction unit to complete the leather museum project of each floor of the strong and weak power cable laying, each floor of the strong power wells power box location arrangement and each floor of the regional power supply power supply metering laying to each store and communication, Network, monitoring position;

5 ﹑ to complete the preliminary design of the boutique business building substation and statistics of the late project power consumption.

two ﹑ 20X years to complete the main work

1 ﹑ with the general contracting, supervision, fire and other relevant acceptance units of the leather city to achieve a qualified project, and the transfer of electrical equipment to the Ministry of Operations;

2 ﹑ to do a good job of wood carving and cultural square project electrical map review work, found that there are doubts about the place in a timely manner to contact the design institute to confirm the confirmation of the confirmation of the first time feedback to the construction unit, while the civil engineering, plumbing, heating, and the construction unit. At the same time with the civil engineering, plumbing engineers work;

3 ﹑ boutique business building distribution substation project installation procedures and safety work tracking until x month x power supply operation, has completed the air conditioning room electrical equipment normal operation.

Third, there are shortcomings and improvement measures

1, communication skills should also be strengthened, do not make full use of resources;

2, the professional face of the narrow, as an electrical engineer, should be a multi-functional, so as to meet the needs of the company's development. In the future work process, strengthen other professional learning, so as to improve their own business, technical level, when strict requirements for themselves, focusing on their own development and progress, to be careful;

3 ﹑ for the work process of foresight, planning is not strong enough, in the future work to improve their work for the problems that will occur in the work of the foreseeability of the problem as far as possible, when encountering problems when you can do! Organized to deal with.

Next year will be a more busy year, the next work I will be closely around the company's overall program program, practical and feasible to complete their own work, more efforts, more progress, so that their ability to work with a greater improvement, to do a qualified X staff, and strive to create greater benefits for the company, in the next year to better complete the work.

Electrical engineer professional and technical work summary (two)

I entered the site in 20X, this season is the project team task, building number, time is urgent and the battle of 100 days of the construction of the climax, as an engineer in the x director and the second group of the x team leader under the direct leadership of the director, to overcome the lack of personnel, replacement of the difficulties of many. Combined with the actual work of the project, in line with the principle of law-abiding, fair, scientific and honesty, the construction unit strictly follow the "three control, two management, one coordination" supervision policy, supervision and help, the purpose of the construction unit of warm service, rigorous and conscientious to carry out professional supervision of the project, the total and the x leader of the work of the spirit of dedication, demanding themselves, and so far it has taken many months of work, the x director and two x group leader, under the direct leadership of the x director, overcoming the lack of personnel, replacement of many difficulties. So far it took many months of work, and achieved better results. Faced with the end of the year, now the individual specific work situation is summarized below.

First, the X area of the third phase of the C District Project Overview

X residential area of the third phase of the C District Project, located in X City, X County, X County, X Township under the X Village X Village, covers an area of 505 acres, will be the construction of a new 72 8 types of 2724 households residential buildings and kindergartens, comprehensive clubhouse and other utilities, construction area of 290,000 square meters. Its supporting facilities such as outdoor water supply, drainage, heat, neighborhood roads, natural gas, strong and weak electricity, fire fighting and other supporting facilities. The project was started on April 1, 20X, and will be fully completed in June 20X and delivered to use.

The project is designed by X Science and Technology Engineering Limited Liability Company (X Survey and Design Research Institute) and X Survey and Design Institute*** with the same design, the residential building 6 floors above ground (with basement) are large excavation ash foundation, reinforced concrete bar foundation, the main body of the brick and concrete structure, concrete cast-in-place floors and roofs, anti-seismic fortification intensity of 7 degrees.

The building numbers of Supervision Group II in Area C are: 14, 15, 16, 17, 19, 20, 21, 24, 25, 26, 27, 29, 47, 48, 49, 50, 55, 56, 57, 58, 59, 60, 61, 62, 63, 64, 69, 70, 71, 72, 73, 76, 77# and kindergartens, activity centers **** 35 buildings. The construction area is about 140,000 square meters.

Second, the supervision of the work of the attitude and understanding

Construction works is a special product, the value of large, long service life, but also related to the people's lives and property safety, health and the environment. Therefore, to ensure the quality of construction works and the use of safety has become a very important issue, because our supervisors are technical, management, understanding of the economy, through the law of the specialists, our supervisors on the contracted construction units to carry out excellent supervision and management, it will be the construction of the quality of work and the use of safety to play an important role in ensuring the quality of work and the use of safety.

Therefore, we supervisors in the work, that the construction does not meet the project design, does not meet the project quality standards and quality requirements, should be promptly reported to the team leader, the industry in charge of supervision and, if necessary, reported to the director of x. And timely rectification notice to the construction side to ensure the quality of the project, we must strictly abide by the implementation of GB50319-2000 national standards of engineering supervision; from the supervision since the stationing of the site site to the completion and acceptance of the project, we must follow the "law-abiding, good faith, impartiality, science" professional guidelines to carry out their work; seriously study the GB50303-2002 "Building Construction", "Building Quality Standards", and "Construction Quality Management". GB50303-2002 "Building Electrical Engineering Construction Quality Acceptance Specification", GB50168-92, GB50169-2006 national standards and norms and more specifications. At work, I am able to seriously study the relevant norms, and play a positive role in carrying out professional supervision.

Seriously familiar with the drawings, review the construction drawings design, do a good job of supervision of the preliminary preparatory work, when nearly three months more, in the construction process can be from the quality, progress, safety control in all aspects, in the process of work to comply with the company's development of the various rules and regulations, listen to the x director of the direct leadership and the x team leader of the normal work arrangements; encountered the construction of the project with the drawings of the contradictions that occur in the construction and the new problems, do Carefully consult the history of changes and other documents; can communicate and coordinate with the construction unit to cooperate and collaborate with each other.

Third, three C current electrical construction process characteristics

Three C electrical construction supervision delivery is not yet perfect. Drawings are incomplete and many details, nodes have omissions, coupled with the monolithic and floor plans by the two hospitals *** with the design, resulting in drawings appeared in a number of contradictions, diagrams and tables do not match; for example, C-70 # building wiring diagram of the distribution box is designed on 2007.09.15, the meter metering box is placed in the basement centralized management, the intercom doorbell installation system is designed on 2007.09.22, the doorbell decoder is a single-family The doorbell decoder is single-family and must be placed in two wiring lines for the east and the west. The wiring diagram of distribution box of C-48# building is designed in October 2007, and the meter metering box of each sub-family is managed independently by each sub-family on different levels; the system diagram of intercom doorbell installation is designed on September 24, 2007, and the doorbell decoder is one for each household, and it only walks on one line. The same is a design, the same building, two buildings design time difference of only a few days, but the function and construction methods completely different. (The above problems have been changed in the A area) I did not find the change notice to the C area, only to find part of the building number of similar drawings, after the serious checking, check all the electrical changes in 20X years to supplement the notification list and made a registration, and in the A area of the supervisory engineers communicated to the problems of the drawings one by one record, the three C-area omission of the problem of timely in the buildings one by one, can be changed immediately on the construction of the construction of the building. The problems missed in Phase III Area C were recorded one by one in each building in time, and corrective measures were immediately proposed to the construction unit if they could be changed. At the same time, the problems raised by the construction side were determined to reply. Received a lot of results.

The electrical engineering of the third phase of the C area is characterized by: the construction of group buildings and groups of people living. A drawing of the household type to build a number of buildings, each building is inhabited by decades of work in a unit of old colleagues, old acquaintances, in the residence are scurrying door to door, you and I compare, so in the electrical construction, there is a unified size and specifications on the requirements are very strict.

3. More sub-projects, construction difficulties. The building electrical installation project is mainly strong, weak power and lightning protection and grounding system installation. Strong electricity is divided into multi-channel air conditioning, multi-channel water heater, general outlets and lighting. Lighting is also divided into common hallway lighting, basement lighting, indoor lighting and so on.

4. More processes, long construction period, more electrical construction personnel replacement. Project from the start that began grounding network, a variety of buried wire pipe, buried, grounding leads, foundation buried with the civil construction, and then in accordance with the requirements of the electrical engineering construction specifications for cable, wire laying, equipment, appliances, installation, testing, testing, debugging, rectification, and finally, the system is a joint test, after passing the quality assessment and acceptance of the completion of the project, the duration of the entire construction process will take one year. Above.

5. Electrical installers of poor technology, construction supervision is difficult. As the electrical installation in the building construction is an incidental construction, often the builder will be subcontracted to others, and others subcontracted to the second subcontractor, and even the emergence of the third subcontractor, so the first subcontractor in the construction of the first subcontractor is still licensed to construct, while the other two packages of the three packages are unlicensed construction of most of the construction, as well as the construction of personnel of varying ages, the smallest of the 17 years old, the largest of the more than 60 years of age, the cultural level and technical skills are very low. Cultural level and technical skills are very low, difficult to manage.

Fourth, strict compliance with the guidelines and norms of supervision

Based on the principle of law-abiding, impartiality, science and integrity, to the construction unit to do the supervision of the work of the "three control, two management, a coordinated" approach. Strengthen the supervision of the construction unit's strength, do a good job of dynamic control. Weiyuan three C area of the second group of supervision of the construction area of about 140,000 square meters, the work, adhere to the quality first, prevention first, process control, terminal gatekeeper's guiding ideology, abide by the professional ethics, to maintain the image of the supervision company, strict supervision of the construction unit, the combination of supervision and assistance to the construction unit of warm service. In terms of quality control, we have done the following.

1. Quality control. Do a good job in the construction of quality control points set

(1) key parts or weak links, generally to analyze in advance the causes of problems that may cause quality, and then formulate countermeasures for the causes of pre-control.

(2) the key processes or links in the construction and hidden works, the use of altered parts and new materials parts or links, the construction of difficult, construction conditions or technical difficulties in the process or link.

(3) control of construction personnel. Supervision, unqualified, undocumented, low cultural level of personnel, insensitive response to the construction staff should be controlled, focusing on supervision; the quality of construction materials, due to the direct impact on the quality and safety of the project, should be focused on the quality and performance control. (eg: low temperature in winter PVC pipe is easy to break, etc., in the pouring of the plate, the electrician is strongly required to stand by to watch over)

2. The contracted construction unit to do a good job in the control of the technical bottom. It is one of the conditions to ensure the quality of construction, therefore, each sub-projects to be carried out before the start of implementation.

(1) strict control of materials, finished products, semi-finished products, components and accessories inspection work, to eliminate the unqualified products used in the project.

(2) review the construction unit's technical delivery information, to understand the site delivery situation, to avoid disjointed, to grasp the dynamics of the construction unit. X Urban and Rural Project Department of 20 buildings electrical *** divided into six teams, I paid attention to the construction of the quality of personnel between the various teams, construction methods, construction quality, etc., the differences between the targeted measures to control the quality of the construction of a certain degree of improvement.

(3) sample room to start: in order to reduce large-scale errors and rework, make a sample room to start to standardize the behavior of the construction unit and the quality of construction plays an important role. Process construction of each team to take the sample room to start the method, the control effect is better. Requirements for each construction unit and each team to make a set of sample room on each building, after acceptance can be fully launched after the installation work.

(4) construction, take on-site supervision, inspection, parallel inspection methods, hidden works, important parts, key links, weak links to strengthen quality control, to do everything personally. For the emergence of anomalies, serious analysis, responsibility, serious treatment, larger problems in a timely manner and the engineer line of communication.

3. Control of incoming materials and components. Where the raw materials delivered to the construction site, before entering the site should be submitted to the supervision of the "project materials / components / equipment declaration form", colleagues with product certification and technical instructions, and by the contracting unit in accordance with the provisions of the requirements of the test inspection report, reviewed by our supervisory engineers and confirm that qualified before entering the site.

4. progress control. X a project department of the construction progress compared to the X two project department slow, and construction quality is poor, in this case, by analyzing the personnel, machinery and volume of work and other circumstances, remind the construction unit of the Anda not to change many times to increase the number of advanced machinery (such as the need to increase the bender, etc.), to take the X two department of the electrical installation of the advanced experience, urged the construction unit to adjust the personnel, machinery, to guarantee the foundation of the total construction period. Ensure that the total construction period laid the foundation.

5. Quality acceptance of construction. Engineering construction quality acceptance is an important part of engineering construction quality control. Must implement GB50300-2001 "unified standard for quality acceptance of construction works," which is a general guideline for acceptance specifications for various specialties of construction projects.

(1) line pipe laying:

①, concealed piping steel pipe, the interface has butt welding phenomenon. In the inspection process will often encounter this problem, thick-walled steel pipe (wall thickness greater than 2mm) butt welding connection, will produce internal tuberculosis, so that when wearing cable damage to the insulation layer, thin-walled steel pipe (wall thickness of less than or equal to 2mm) fusion welding connection will produce a burn-through, buried in the concrete will seepage of slurry, resulting in clogging of the conduit. These phenomena are not allowed to happen. Therefore, GB50303-2002 14.1.2 mandatory provisions: metal conduit is strictly prohibited butt welding connection, galvanized and wall thickness less than or equal to 2mm steel conduit shall not casing welding connection. Thick-walled steel pipe should be casing welding, weld seam requires full and dense. Galvanized steel pipe is required to be threaded connections, connections at both ends with a special grounding card fixed across the grounding wire. Thin-walled steel pipe threaded connection, tight connection, etc., but the interface is required to take blocking measures to prevent moisture penetration into the tube caused by wire insulation layer aging, and increase the electrical conductivity of the connection.

②, steel wiring pipe laying depth does not meet the specification requirements. Concealed piping buried depth is too deep for connection with the box, box, sometimes too deep groove will affect the quality of the wall and other buildings; too shallow, also unfavorable for connection with the box, box, will also make the building surface cracks, in some wet places (such as basements, etc.), steel conduit corrosion will be visible in the wall, so the depth of the proper burial, both to protect the conduit and does not affect the quality of the building. Therefore, GB50303-2002 requirements: concealed with the conduit, the thickness of the protective layer is greater than 15mm, and the groove should be not less than M10 strength level of cement mortar plaster protection. Grooving requires mechanical grooving, prohibit manual grooving. There is, inside and outside the steel pipe does not brush rust protection paint, for these problems, in the inspection site when it urged the construction side to immediately correct.

③, PVC20 pipe dosage, in the laying of the distance is not allowed, the corner of the bend is too small, docking is not coated with glue, the width of the groove is not enough to carve, to fill the drum, carve the groove with the phenomenon of horizontal walk. These problems are almost daily constraints in the field view.

(2) power distribution box installation: a, the reserved hole of the distribution box. Due to the drawings to the electrical installer to give way to a coordinated note: "electrical construction, electricians should work closely with, do a good job of reserved holes and buried pieces of work", and drawings of the reserved holes are not detailed marked specific size, so, resulting in most of the building appeared to be without a unified standardized user metering box reserved holes. After careful statistics, 47 # building 3 units, only the construction of 5 floors, in the 15 metering box reserved holes, only 2 holes are still qualified, the rest of the 5 did not leave a hole; 6 reserved holes do not have a beam, GB50203-2002 "masonry construction quality acceptance specification" Article 3.0.7, masonry wall left a hole width of more than 300 should be set up over the beam; 2 holes and its bad (15 holes in the photos), examples like this are more prominent on building C-64#. Other buildings have more than one. b. The quality of the box has the following problems: ① Not according to the drawings of the size of the stereotypes. ② sent to the site of the product size does not match the drawings. In response to the above problems: ① requirements should be strictly in accordance with the design drawings and the relevant specifications for ordering. After the arrival of the appearance of the inspection should be carried out to check whether there is a factory certificate of conformity, whether the nameplate is correct, whether the accessories are complete, whether the insulation parts are defective, cracks, whether the coating is complete. ② distribution box iron box should be consistent with the drawing size, where inconsistent with the size, to find out the factory is to explain the production of data according to the requirements. Then figure out the delivery notice.

(3) a variety of concealed installation: ①, the height of the socket concealed box to the ground does not put the 50 line installation or 50 line misplaced 3-4 centimeters installation, so that the installation of various types of concealed box height is not allowed; with the wall a few concealed box installation is not in a plane. ②, air conditioning, water heater high plug box height is not allowed; ③, switch box location is more chaotic, the new requirements are: encounter concrete columns, can be 300 from the side, so, after the completion of the painting, in the invisible columns, the switch distance from the side is considered to be different. Such problems are corrected one by one during the inspection.

(4) lightning protection and grounding system installation

Some lightning straps and grounding devices lap length is not enough, and single-sided welding. Lightning protection belt and grounding device installation requirements: ① flat steel lap length should not be less than two times its width, three-side welding, when the flat steel width is different, the lap length of the wide shall prevail; ② round steel lap length should not be less than six times its diameter, double-sided welding, when the diameter is different, the lap length of the diameter of the large shall prevail; ③ round steel and flat steel connection, the lap length should not be less than six times the diameter of round steel, double-sided welding; ④ round steel and flat steel connection, the lap length should not be less than six times the diameter of the round steel, double-side welding ④ flat steel and steel pipe, flat steel and angle welding, should be close to the surface of 3/4 steel pipe, or close to the outside of the angle on both sides, on both sides of the welding; ⑤ in addition to welded joints buried in the concrete, the other should be corrosion-resistant measures. Do not do the above specifications, will not be accepted.

(5) equipotential bonding

①, the total equipotential bonding (MEB) "Low-voltage Power Distribution Design Code" requires: the use of ground-fault protection, in the building should be the following conductive body for the total equipotential bonding: PE, PEN trunking; electrical device grounding pole of the grounding trunking; water pipes, gas pipes, heating and air conditioning ducts and other metal piping in the building; the condition permitting Conductive body of the building metal fixtures and so on. The above conductive body should be connected to the total equipotential connection terminal in the building, equipotential connection in the metal piping connections should be reliably connected to conductive. Equipotential construction, the general use of welding, will be 40mm × 4mm galvanized flat steel, from the MEB copper connection busbar connected to the conductor. For a variety of metal pipe coupling hoop, generally should be used not less than 25mm × 4mm galvanized flat steel or copper tape.

②, bathroom local equipotential connection (LEB): GB50096-1999 in the sixth paragraph of Article 6.5.2 requirements: the bathroom should be equipped with bathing equipment for equipotential coupling. C area requires the construction method is to use 25mm x 4mm flat steel to the ground 30cm to do a one to be a band-type week, and then make the top of the four need to be grounded to the M8mmX50mm screws ****! Grounding objects to use. Mainly control the connection with its lead wire.

Fifth, the emergence of engineering quality problems in a timely manner

Construction without drawings, construction without a license, multiple subcontracting, dependency, construction management is not in place, the use of unqualified raw materials, over-sized poor slotting and drilling, unqualified holes, weakening of load-bearing cross-section of the construction, the supervisor found that it should be timely to stop its construction, serious or do not listen to supervisory verbal stops, can be sent to a temporary suspension of the supervision of the notice. The supervision of the notice.

The small quality problems in the construction of the project, as far as possible in the inspection of the construction site to solve and in the sub-item, the acceptance process of branch projects in a timely manner. For the general can be reworked, repair the quality defects of the project, the contractor should be instructed to write a report on the quality of the first, explain the situation and put forward processing advice, after the supervision engineer to verify and study, if necessary, after the construction of units such as recognition, to determine the treatment program, approved the contractor to deal with the treatment of the unit, after processing re-acceptance.

Electrical engineer professional and technical work summary (three)

I X, July 20X graduated from the X University of Technology, majoring in automation, in August went in to work in the X power plant, into the power plant to learn the first time the specialty is the operation of the dust removal desulfurization, through their own efforts to struggle, and continue to forge ahead, in July 20X was hired as an assistant engineer. Through my hard work and continuous improvement, I was employed as an assistant engineer in July, 20X. In this work period, I study the profession, constantly forge ahead, and strive to learn professional and technical knowledge. In May 20X, I was transferred to the centralized control of the electrical operation of professional learning, from learning inspection to become the main operation I used less than a year's time, in the centralized control of the operation of a comprehensive study of professional knowledge. In the same year, I was admitted into the master of engineering, and continued to study. Learning professional control engineering. 20X April was transferred to the maintenance of thermal engineering specialties, mainly engaged in the company's power plant control system work.

Now I am in my current position since the professional and technical work is summarized as follows:

First, hard work, not picking positions, do a good job in all aspects of the work

20X in July I entered the X power plant work, the first to learn the specialty of the dust and ash, before and after the participation of the power plant dust, ash removal equipment, the preparation of debugging as well as the operation of the timely improvement of the work.

During the dust and ash removal work, I am mainly responsible for the operation, maintenance and training of dust and ash removal. And for dust removal thermal control system in operation to put forward the system improvement plan. In the commissioning stage, in order to better grasp the control system function, responsible for and participated in the before and after the s system networking, duty system, control screen settings, system configuration, screen production and modification, the system under the load and other debugging work. Through this system preparation, debugging work and later equipment operation exercise, so that their own professional knowledge is richer, but also to make their comprehensive quality has been further enhanced.

20X March for the dry slag system characteristics and environment, its transformation, reduce the dry slag system old plugging slag problem, to ensure the safe and stable operation of the power plant boiler; 20X April I was transferred to the centralized control of the electrical operation of the X power plant to carry out the transformation of the power plant to the boosting station, the former 220kv is a boosting station, through the transformation, to become a two independent boosting station. The original double busbar structure was upgraded to a 4-section busbar structure. One busbar interval, two busbar pt intervals, and two power outlet intervals were added. During the transformation period, we carried out large-scale operation 42 times and technical transformation 27 points. There is not a single violation and error operation. 20X March according to the characteristics of the power plant turbine ets trip protection system, its optimization and renovation, through the renovation, to avoid the unit protection error, to ensure the safe and economic operation of the power plant.

In the technical study, the theory of the daily review of operating procedures, and in the team to learn a variety of communication channels to continuously improve the skills of self; practice strict compliance with operating procedures, to develop the ability to operate independently, to ensure that no mishandling of the accident, the work of the problems encountered in the experience gained, attention to the matter of the note at any time, and humbly to the specialists and the leadership of the teachings of the efforts of the year 20X. I was promoted from the deputy operator position to the main operator position. However, I know that in order to learn the electrical profession thoroughly, we still need time to hone our skills and accumulate knowledge, so we can make progress step by step and be stronger than one day at a time.

Second, loyal to the enterprise, the courage to bear the heavy burden

Due to their excellent performance in the centralized control of electrical operation, the leadership of the department as well as the superior unanimously affirmed. 20X April, he was transferred to the equipment maintenance department of the thermal engineering professional work, responsible for the highest technical content of the work of the power plant. The new work, I put forward new higher requirements, I comprehensively study the thermal engineering in a timely manner of the various professional knowledge, to improve their own professional business comprehensive quality. In the leadership as well as the help of colleagues, they excelled in the completion of various tasks:

1. Participated in the #1 unit overhaul, during which the successful completion of the overhaul of the standard project 1503 items, 33 special projects, 27 items of transformation, metal inspection 23 items, 27 items of pressure vessel inspection, the whole process did not appear a safety incident. Through this overhaul, it can be said that our #1 unit has nearly reached the advanced level of similar units in the region. The opportunity of this overhaul was fully utilized to reduce the power consumption and improve the economic efficiency of the plant;

2. In 20X, we participated in the renovation project of the X power plant indirect air-cooled 200mw unit heat pumping project, in which the heat supply from the medium-pressure exhaust steam was first supplied to the heat network through a tee pipe from the side of the unit; the upper pipeline of the tee pipe was connected to the heating butterfly valve, and the flanges on the heating butterfly valve were connected to the flanges of the connecting pipe. The rated heat supply and steam extraction capacity is set at 150t/h, and the maximum heat supply and steam extraction capacity is set at 200t/h, corresponding to a steam extraction pressure of about 0.30mpa and a steam extraction temperature of 253.4℃. In order to consider the possibility of steam turbine heat supply under low electric load, the lowest saturation temperature of the extraction steam is set at 119℃, and the corresponding extraction steam pressure is 0.196mpa, which greatly improves the plant gas consumption rate after the transformation, and even more improves the economic efficiency of the power plant.

3. Participate in the X power plant dcs system upgrading company, solve the insufficient protection problems in the system, for the X power plant equipment stability has made great contributions.

Third, adhere to continuous learning, comprehensively improve their overall quality

From the beginning of the work, I more y recognize the importance of learning, no learning there is no progress, in the continuous learning and practice in an effort to improve their own professional qualities and personal comprehensive quality. As the saying goes: "To do a good job, you have to first sharpen your tools". In the study of professional and technical theory, take the principle of internal and external combination, to self-study as the main, supplemented by the company's training. Over the past few years, I have maintained an uninterrupted learning, and played an effective role in guiding the actual work. 20X when I started to read the master of engineering control specialization. Vocational qualification intermediate skills to obtain thermal engineering control and protection worker, centralized control watchman, electrical watchman, electric dedusting watchman.

In the study, I do not forget that I am a party member. In the study of professional and technical knowledge at the same time, I also do not forget to strengthen their own political theory, focus on their own ideological construction, and constantly improve their political quality. In the past few years, when I was in the power generation operation department, I was the organization member of the party branch, and when I was in the maintenance department, I was the propaganda member of the party branch. In the work of their own higher requirements, I will be a *** member of the party's strict standards to require themselves, in their own work to make greater contributions.

Electrical engineer professional and technical work summary (four)

Time flies, turn to the company has been almost a year, feel much, gain much. Into the X electric box variable company, for me is a good opportunity for development, but also a good exercise and enhance their ability in all aspects of the opportunity. Here, first of all, special thanks to the company's leadership and colleagues to give me strong support, care and help, so that I can quickly adapt to the company's management system, and strive to do their jobs. Since entering the company, I seriously understand the development of the company's profile, learning the company's rules and regulations, familiar with the company's process. At the same time, it is really feel the positive, stimulating corporate culture, so that I benefit greatly. I now summarize my work over the past year as follows:

First, solid work

In the workshop installation group, a flexible line group, a copper group and secondary line group for three months. We entered the box variable from the workshop, it can be said that the workshop is our first impression of the box variable company. I have to say that the workshop workers set up a good image for me and benefited me a lot. In October, I entered the technical process office for internship, and I y felt my colleagues' spirit of conscientiousness and striving for perfection. Since I entered the office of technical department, I know my burden is very heavy, and I always keep in mind the words "to give others a bowl of water, you need to have a bucket of water". Because I know to become a qualified technician is not an easy thing, as a technician not only to be able to deal with the requirements of the customer, but more importantly, to be able to solve the problems on the scene, the scene of the operation of machinery and equipment to do a good job.

Second, hard to learn, continuous progress

In the work, study carefully, constantly improve themselves, and use other time, learn more new knowledge. From the simplest manufacturing specifications to draw, to draw a complete set of drawings, where both their own diligence, more inseparable from the office colleagues to answer questions and solve problems. From the old engineers I not only learned a lot of things, but also gave me a lot of insight. For my first design drawings, colleagues not only carefully help me to review and patiently explain to me, thank you very much for the help of colleagues, but also in our company such a cultural atmosphere of better work with sufficient confidence.

Third, shortcomings and deficiencies

As I joined the work not long ago, so in many areas of technology and experience are insufficient, encountered many problems, dealing with the problem can not do. In the future work, we must dare to solve and deal with problems, encounter problems, never escape, and learn from experienced technicians, old workers; in addition, timely organization of lessons learned, the existence of doubt, do not understand the aspects of the record, and seize the time to solve the problem, do a good job of recording, in order to meet the same thing in the future, to be able to solve the problem faster and deal with good. Seriously study the knowledge of the box change, so that they are in the future work, can better complete the work and tasks assigned by the leadership, so that they are faster to mature.

Fourth, self-evaluation

Although I participated in the production of labor and technical learning time is only half a year, but in the ideological and technical have been greatly improved and progress. Both enriched knowledge, but also improve their management and business level, and most importantly, for their own work in the future, to be able to better fulfill the work task has laid a good foundation.

Summarize the work of the year, both achievements and shortcomings. In the future work, only continuous serious summary, find deficiencies, and strive to correct, in order to get faster progress, in order to better serve the company, to realize the value of life.