Shenzhen Yier Automation Equipment Co., Ltd.
Name: Yier AOI Operation Instructions
Version:
Equipment number: 201111
Date: Year, Month, Day
1. Purpose
1. To improve production quality and efficiency and ensure the best operation of equipment.
2. First Steps
1. Check the power supply of the machine to see if it meets the requirements of the machine.
2. Check whether there are foreign objects in the machine and on the machine track, and whether it is in the normal shutdown position.
3. Turn the red power supply inside the lower front door of the equipment to ON ONOOONON
Turn on the emergency stop switch
Turn on the power supply of the industrial power supply machine
Double-click E2 AOI AOI
Reset the equipment and return to the origin
4. Call up the detection program and adjust the track.
3. Close the E2 AOI software
Shutdown steps
1. After detecting the last PCBA,
Click to exit Windows< /p>
Turn the red power supply in the front and lower door of the equipment to OFF
IV. AOI process diagram
Loading machine
Printing machine
p>SMT machine
Reflow soldering
NG
AOI detection
OK
QA Sampling inspection
5. Repair
Notes
1. Do not put hands or other objects inside the equipment when the equipment is running.
2. Non-designated personnel are not allowed to enter the machine programming menu, let alone change programs, machine parameters, etc.
3. When the equipment is running, please do not open the front cover of the equipment to avoid accidents.
4. Repeatedly turning the power ON/OFF (off) may cause machine host failure. After the power is turned off, please wait 30 seconds before turning the power back on again.
5. When adding lubricating grease for maintenance, please cut off the power supply.
6. Please connect to the power supply according to the standards on the equipment nameplate. If it does not match, please contact our after-sales service department.
Production
Yier AOI
Peng Yongqiang
Review
Approval