Research and Development Department annual work summary 5
Time is an arrow, come and go in a hurry, a period of time has come to an end, review this time, our ability to work, experience has grown, so let's summarize it well and recorded in the work summary. The following is my annual summary of the work of the R & D Department, I hope you like it!
R & D Department of the annual work summary (Selected Part 1)
20__ year is coming to an end, we will usher in a new and challenging 20__. As a technology research and development department we have many gains in the past year, there are also shortcomings. Looking back over the year, there are unforgettable comfort, there are also unforgettable past. Review the past, look to the future, so that people wake up, so that people are wise, urging people to move forward. The so-called "ambition to store high, sincere write spring and autumn", the following, I will report to the leaders of the main work in 20 ___:
First, efforts to coordinate the various departments, according to the sales plan to arrange the production
According to the company's sales plan, the overall consideration of raw materials, production equipment, personnel arrangements and other aspects of the factors to determine the success of the production of the product. Factors, to determine the sequence of production products. Develop the production process parameters of the products and arrange the production of each department. Coordinate with the production workshop, front-end, composite workshop and inspection workshop.
Second, the work of pragmatic, pioneering and innovative
In 20__ new product innovation, we have a new breakthrough. After a long time of research and practical attempts, we successfully produced a beautiful appearance, wear-resistant quartz sand flooring and antibacterial material, waterproof flocking flooring; previously need to buy embossed surface layer, we have gone through independent research and development, can be produced by themselves; in 20__ through the continuous summary of the declaration of a number of patents. In the process of continuous experiments and practice, we boldly use new materials to reduce costs and improve product quality, in order to bring greater benefits to the company. 20__, the quartz sand flooring is still in the early stage of trial production, this year, the production of 3,550 meters, about 7,100 square meters, the research and development costs of about 500,000 yuan. Flocking flooring production of 1600 meters this year, about 2400 square meters, research and development costs of about 100,000 yuan. Pool texture series products produced 2,800 meters, about 5,040 square meters, R & D cost of about 200,000 yuan. Commercial flooring new products include natural series, Du Shang series, Carle series, Hill series, Fury series, Renaud series.
Third, continuous learning, serious conclusion
Whether it is the improvement of old products or new product development requires me to constantly learn new knowledge, improve their theoretical level. For the development of new products, we need to consider a variety of factors before the production of new products, and then through the experiment to determine the preliminary parameters of the process, and then through the actual production to test the correctness of the process parameters, and then through the experiments, summarize, think and repeat the practice, and finally to get our process parameters to ensure that the production of qualified products.
Fourth, the direction of future efforts
1, study hard, the courage to practice, theory combined with practice, to improve the overall quality and business capacity, to make their own contribution to the work.
2, strengthen the sense of innovation, strengthen the cooperation between departments, and constantly open up, bold innovation.
I am confident that together with all departments, I will work hard to learn and constantly develop new products. Through the efforts of all of us to make our enterprise in front of the industry, let us for the enterprise tomorrow, *** with efforts, *** create a better tomorrow. If the above report is insufficient, please leaders and comrades to criticize and correct.
R & D annual work summary (Selected 2)is our company to the market in a comprehensive and vital year, in this year, our R & D department actively cooperate with the work of various departments, and strengthen the research and development of new projects to ensure that the company to adapt to the rapid and steady development. Now the work of the R & D department is summarized as follows:
First, product development
From the second half of the year to the end of this year, oxygen-free copper tube research and development is the focus of our R & D department. At the beginning of this year, we research and customize the equipment needed for copper tube research and development, to visit outside and negotiate with the supplier, customized ten tons of pipe pulling machine 2 sets, header machine, grinder, cleaning equipment, pure water equipment, each 1 set. And to determine the production of oxygen-free copper tube experts, the development of new processes to ensure stable product quality, to ensure the development of new products. In the second half of the year, we ordered the corresponding supporting facilities, developed a feasible production process, timely communication with customers, integration of resources and information, to make new product samples, self-tested product roundness, curvature, outer diameter, inner diameter, wall thickness, length, appearance, and so on, and the product will be sent to the relevant material testing centers for analysis of the composition, along with the material testing report and product data together with the customer to send a sample of timely feedback on the The existence of problems for modification, and re-testing samples.
Second, technical support, quality improvement, reliability enhancement
R & D Department in the development of new products at the same time, adhere to the production of manufacturing, quality inspection, sales and service of technical support, and constantly improve and enrich the technical support of the information and content, from the preparation of manuals to the modification of the operating instructions and technical training of employees have done a certain amount of work. Increase the popularization of basic knowledge for new employees and strengthen the training for employees in special positions (such as melting furnace). Assist the manufacturing department to solve the existing equipment and products in the production process problems, such as solder, ring piece and solder tape cleaning; improve the melting method to solve the problem of excessive gas content inside the solder products; reduce the temperature of the water tank, increase the flow of drawing liquid to solve the problem of oxidation of the solder. We cooperated with the workshop to successfully complete the relocation of the company's equipment to ensure the normal production and quality stability. In order to meet the production, to assist the workshop to complete the installation of new equipment, debugging, expanding production.
Third, ISO9001 quality management system
From July this year, the company began to run ISO9001 quality management system to meet the needs of the company's development. In the process of operation, our R & D Department has developed a series of system documents, such as "product design procedures", "technology update control program", "new product trial production management program", "technical document management system", "new product standards", etc., to clearly define the responsibilities of the R & D Department of the various positions, and to strengthen the communication between the various departments. In the process of product design and development, the steps of planning, input, output, evaluation, and verification and confirmation have been improved to ensure the rigorous effectiveness of the product development process. According to the provisions of the system requirements to standardize the work of the department, seriously study the provisions, and participated in the internal auditor's examination achieved very good results.
Fourth, there are shortcomings
1, and other departments in the strengthening of contacts, but still lack of communication. In the work of the work, to strengthen the communication and collaboration with various departments, can ensure the practicality and stability of the product.
2, the lack of research and development personnel. On the one hand, to recruit new technical personnel, on the other hand, to strengthen the direct communication with customers to exchange information and technology.
3, research and development of new products at the same time, strict quality control of old products, stabilize the market of existing products, do not focus on the pursuit of new products and lose the market advantage of old products.
Fifth, the next step of the work plan
First, market research, positioning the direction of product development. Further strengthen the understanding of customer products, actively conduct market research, strengthen cooperation and communication with customers, the development of reliable, cost-effective products, accelerate the development of the company.
Second, conscientiously implement the company's quality policy objectives, the implementation of departmental objectives and responsibilities, improve the quality of work, improve on-site technical support, take the initiative to study the existing products, to ensure that the guidance of the production, reduce the chances of error.
Third, according to the research and development of new products, improve the technical documents, the preparation of relevant process documents and technical documents, improve and perfect the equipment, and constantly improve production capacity.
R & D annual work summary (Selected 3)
Time flies, busy and fruitful 20 __ past the wind, at this time of resignation and welcome the new occasion, our company all up and down the gathering, at this moment of ease will be the technical department in 20 __ work to do a review, in order to make up for the shortcomings, to update the concept of the 20 __ can achieve better results for 20 __ to make the technical department of work to open up a new situation, laying a solid foundation for the work of the technical department, to make the technical department of the new situation. In 20__ in the company's leadership in the correct scientific leadership, under the guidance of the personnel department to assist, my department to adhere to the spirit of excellence, pioneering, advancing with the times, in line with the scientific concept of seeking truth from facts and adhere to the prudent, careful work attitude leading the overall work. In accordance with the requirements of the scientific concept of talent, grasp the professional and technical personnel team building, and has made certain achievements. At the same time there are certain shortcomings in the work, now will do the following four-point summary of the work in 20__:
First, is building a strong professional and technical team
As the company's personnel according to the procedural guidelines are not mature, each department has a lack of procedures to deal with the incident, the technical department is no exception. But in the strong support of the company's leadership, in the company's personnel department's strong assistance, for the company to recruit a large number of technical personnel, according to the company's needs, in line with the principle of meritocracy, in the continuous efforts of the technical department is gradually left and consolidated a strong professional and technical team. However, due to the newcomers are not familiar with the company's products as well as the weakness of professional basic knowledge, the training task for next year is still relatively heavy. However, I believe that under the support of the company's leadership, my department will overcome the difficulties, remove the problem, so that all personnel in all departments in the new year to achieve rapid improvement in professional and technical.
Second, the completion of the company's work tasks
The work of this year because of various reasons, there is a heavy task, time constraints of the difficulties. But after the correct guidance of the company's leadership and all the personnel of the whole department are united, sincere cooperation, unremitting efforts, basically to ensure that the tasks in the company's specified time, high standards, strict requirements for the completion. This and the company's leadership of the correct guidance, strong support, all the staff of the department's unremitting efforts are inseparable. But sometimes also because of the schedule, drawings appear a certain omission of size, mislabeling size mistakes, which is the next year should vigorously address the issue, and strive to avoid and reduce the drawings in the new year should not make mistakes. 325 kinds of specification drawings.
Third, this aspect of the product
Fast and safe completion of the product transition, next year, CBB65 capacitor is our company's seedling, on the true to this seedling, we have a dereliction of duty and there is a fan to make up for the place,
Fourth, revolutionized the process
After the establishment of the new concept, the purchase of high-precision equipment for the reform of the process to create the conditions. Due to the original equipment is relatively backward, the original production process has not been able to meet the current production reality, in the company's strong cooperation with various departments, my department of the original process of bold reform, the innovation, reducing unnecessary production processes, improve production efficiency, but also for the company to save costs. Currently to, the original welding production process has been completed process innovation.
However, there are still welding cover process needs to be revolutionized, which is also next year's work. A focus.
Looking back, the results are gratifying, but the results belong to the past, the future task will be more difficult. At the same time to see the results, my department also has some problems that need to be solved, such as: new employees to improve professional knowledge needs a long process, the original old process of innovation is still heavy (such as filling workshop), the production of technological innovation is slower, less research and development of new technologies and so on, next year's work is the focus of the work. I believe that in the new year, the technical department will make greater achievements, but also wish the company to achieve more brilliant achievements!
The technical department will make greater achievements, but also wish the company to achieve more brilliant achievements!
R & D Department of the annual work summary (Selected 4)
Light like an arrow, the sun and the moon like a shuttle, 20__ year rushed past. In a year, in the unit leadership of the careful cultivation and teaching, I through their own continuous efforts, whether in the ideological, technical or in the daily work, have made great progress and great gains, but there are also many shortcomings. Looking back on the past year, now summarizes the work as follows:
First, ideological
Through the careful training of leaders at all levels, patiently taught, I more comprehensive grasp of professional knowledge, enhance the safety awareness, and strengthen the cultivation of their own ability; support the company's guidelines and policies, consciously abide by the rules and regulations, and focus on learning technology, in order to do a better job of this work and efforts.
The company's guidelines and policies, consciously comply with the rules and regulations, focus on learning technology, in order to better do their jobs and strive.
Second, work
Three months of internship and a year. Apprenticeship life, I participated in the "mountain aluminum project" and "Hengshui City, waste incineration flue gas purification treatment project". In my daily work, I am in line with "what we do today is not to wait for tomorrow, what we do is not to wait for others." I actively fulfill my duties such as technical briefing and on-site coordination. At the same time, I often participate in the construction process, learning and solving problems in practice, to achieve a real combination of theory and practice.
In Hengshui City, waste incineration flue gas purification treatment project construction process, in the high manager, manager Zhang's detailed layout, serious guidance and Wang manager's personal supervision, now the project has been basically finished. Accompanied by the project on and end, where I have gained particularly valuable experience and improved my ability to deal with problems on site and the operation of the project operation. In addition, based on the work experience of my predecessors, I apply the use of engineering-related mapping software combined with theoretical data to the calculation of the amount of work and the review of drawings, which improves the accuracy of the data, but also improves the efficiency of data verification.
Third, there are shortcomings
Over the past year, in the leadership and comrades of the care and support, the work has made certain achievements, but from the leadership and comrades of the requirements of a number of gaps.
1, due to the requirements of the site work, did not arrange a good daily work time, resulting in frequent "night train".
2, in the comprehensive consideration of the problem to be further improved.
3, in the work of communication with the leadership communication is not enough, sometimes only know the head pull car.
Fourth, the future work ideas
1, co-ordinate the work, understand the priorities of the work, and do a good job of work records.
2, the work of the middle school will be open-minded, active thinking, fully consider the issue, and constantly explore the work methods and ideas.
3, actively communicate with the leadership, work and ideological problems in a timely manner to report, but also hope that the leadership of my work in a timely manner to criticize the shortcomings of the correction, so that my work can be more perfect.
20__ year, is a brand new year, but also a year of self-challenge, I will strive to correct the shortcomings of the past year's work, forge ahead, upward, with the times, and strive for greater progress and achievements. Do a good job in the new year, on the basis of the existing work further, for the development of the company to do a part.
R & D Department of the annual work summary (Selected Article 5)I since March 2, 20__ joined the ___ company, October of the same year to date as R & D a project assistant. In these two years of work, I work diligently, constantly enterprising, study hard, learn from experience, in the coordination of customer relations, and internal communication, project planning and production, technical document writing and filing, activity organization and planning, as well as project promotion and operation of the various aspects of the work ability has been greatly enhanced and obvious progress, but also achieved some results, the following is the main content of my current work.
I am responsible for project initiation, follow-up, management, communication with customers, and coordination of cooperative relations
At present, I have participated in the coordination and project management of the main projects are: ___ company's business emergency response system, enterprise communication, mobile home and school management platform, ___ City State Taxation Bureau website, Forestry Bureau touch-screen website, ___ value-added tax anti-counterfeiting and tax-control server management system, and so on. Mainly responsible for the project requirements analysis, coordination between the mobile company and the R & D team cooperation, follow up the project progress, the requirements of the document, technical documents, contractual programs, such as drafting and writing as well as archiving and management, to assist in the acceptance of the project.
Among them, the business emergency system after more than a year of program development, demand changes, functional overlay and upgrade maintenance process, in November this year has successfully passed the final inspection, and get the final inspection of the mobile company's qualified report, by the mobile company's marketing department, business department, business technical support room, network maintenance room and other departments of the user's affirmation and unanimously praised; enterprise communication also passed the initial inspection in July this year, now entering the hardware upgrade stage. Enterprise Communication also passed the initial inspection in July this year, is now entering the hardware upgrade stage, will enter the final inspection, the mobile company users responded favorably; national tax website also successfully passed the acceptance in September this year; in addition, the mobile home and school management platform has also been put into use in the cities, the function in the gradual improvement of the.
Second, responsible for the project bidding program, planning programs, demand analysis and other document writing and planning
Have participated in the bidding projects are ___ company's integrated application management platform, mobile easy payment system, and in the ***___ City ___ Teachers Training School distance education management system, etc., to assist in the completion of the bidding platform integrated application management platform business bids, ___ mobile home school bidding program, continuing education platform bidding program, etc., to assist in completing the bid. Assisted in the completion of bidding proposals, such as the business bid for the comprehensive application management platform, the bidding proposal for the __mobile home-school communication, and the bidding proposal for the continuing education platform, etc., and planned for the overall design of the "broadband home-school communication" project, the __mobile home-school communication white paper, the white paper for the comprehensive information management platform, the demand analysis of the health care system, the Bureau's website, the social security short message system construction program, and the ___ Municipal Tourism Bureau's enterprise communication system program. etc. The projects involved in the functional framework planning include ___ City Primary and Secondary Schools Integrated Information Management Platform, Mobile Home and School Management Platform, Broadband Home and School Management Platform, etc.; among them, in the bidding for the Integrated Application Management Platform, we were successfully selected as the finalist partner for the year of 20__; and we were ranked the second in the bidding evaluation of the Easy Bill Payment.
Third, the project promotion and website operation
From October, I began to telecom broadband home-school project to carry out a series of work, including the preliminary website functions, mailbox content planning, contract revision, project follow-up and the preliminary promotion to the three pilot schools.
Since the trial run on December 21, the Telecom broadband home and school green mailbox system has 2580 mailbox users, I am responsible for arranging training in the three pilot schools, hoping that through training to draw the attention of teachers to the mailbox to mobilize them to use educational mailboxes, has been activated more than 700 users, teachers and students reflect a good.
Fourth, the project contract writing, approval process follow-up and archiving
Responsible for the project contract drafting, revision, follow-up, high-tech enterprise applications, software copyright registration applications and other administrative applications of the relevant information writing, contract filing and organizing.
V. Coordination and management of departmental administrative affairs, the development of objective, reasonable and effective incentives
The development of relevant policies to assist the department to coordinate the relationship between internal colleagues, as well as the development of the "staff image of the etiquette guidelines", objective and reasonable development of effective incentives.
Six, organization and planning of departmental activities
Successfully planned several activities. New Year's Day New Year's Day dinner, Dragon Boat Festival Happy Valley tourism activities, weekly table tennis, badminton departmental sports, etc., successfully mobilized departmental colleagues' enthusiasm, improve departmental morale.
VII, the future vision and determination
In the past, I walked in the ___ company another fulfilling year, dutifully fulfill their duties, as far as possible, to do the work. Although, the work will occasionally do not perfect place, but through the lessons of failure so that I have accumulated more work experience.
Looking ahead to 20__, I will independently manage the process of manipulating the flow of projects as a personal development goal, and strive to promote the process of each project, coordinate with the implementation of the project, promotion, operation and other work, in order to maintain the quality of the previous work on the basis of the search for a higher level of breakthroughs. Toward this direction, I have been working hard, hoping to make the work more perfect, and constantly improve self-worth.
I would like to express my heartfelt thanks to the leaders of my superiors for giving me the opportunity to learn and exercise, as well as the trust and support for my work! I will continue to work hard, and strive to be able to get a greater improvement in the future work.