Emergency plan for power outages in hospitals

Emergency plan for power outages in hospitals

In the study, work or life, sometimes there will be some emergencies, in order to control the development of the accident, it is necessary to prepare a specific, detailed, targeted and strong emergency plan in advance. Then how to prepare an emergency plan? The following is my carefully organized hospital ward power outage emergency plan, for reference only, I hope to help you.

Emergency plan for power outages in hospital wards 1

First, the usual work should be done:

① softened water tank water level should be more than three molecules of two, the high water tank should be full of water level.

② boiler should maintain a normal water level.

③ Emergency lights should be in good condition, and a strong flashlight, ready for use at any time.

④ Strict equipment inspection system to ensure that the equipment has the emergency capacity.

Second, the power outage emergency measures:

① need to remain calm, make a judgment on the accident.

② need to be judged as a sudden plant-wide power failure, immediately open the smoke emergency discharge valve, so that the smoke from the emergency discharge channel to prevent deflagration.

③ All the equipment in the control room cabinet power to the "stop" position, to prevent the sudden start of the wrong call.

④ In the water distribution tank, open the high water tank to the water distribution tank contact valve, check whether there is water overflow in the water jacket next to the feeder.

⑤ Check whether the water outlet valve of the high water tank is always open, observe the water level in the high water tank, and estimate how long the high water tank can maintain the amount of stored water.

⑥ Close and gradually close the outlet valve of the split cylinder to reduce boiler water consumption.

⑦ shut down the furnace jacket cooling water replenishment valve, the lower material water jacket cooling water valve, two combustion chamber roof cooling water valve, flue cooling water valve, check who overflow can be.

⑧ check the high water tank water consumption and water level decline, the high water tank water to maintain the time to estimate again.

⑨ check the silo situation, the silo material level situation, the silo iron rod insertion stick, to prevent the silo burned through.

⑩ Contact the power plant to inquire about the power outage and determine the time to restore power.

Need to report to the leadership, the site situation, emergency measures to deal with the situation, the power plant power outage feedback, there are still problems to report to the leadership.

Need to boiler water level, each water jacket water overflow or not, high water tank water storage, split cylinder pressure, steam bag pressure, site conditions, power outage situation for constant monitoring.

Three measures after the call:

① A comprehensive inspection of the plant equipment, to determine the absence of major damage, ready to resume system operation.

② the control room cabinet equipment power to the "automatic" position, start the induced draft fan, the production line flue for blowing, so that the flue to restore the negative pressure operation state. Close the emergency flue gas discharge valve.

③ Start the circulating water pump to replenish the high level water tank, when the high level water tank is full of water, close the water distribution tank to the high level water tank contact valve, restore the water distribution tank to the water jacket valve opening and closing degrees to ensure that there is enough cooling water to cool the water jacket.

④Start the boiler feed pump to feed water to the boiler.

⑤ When everything is normal, restore the incinerator and the second combustion chamber of the `normal combustion, to restore the normal operation of medical waste incineration treatment systems.

Hospital ward blackout emergency plan 2

First, the development of the purpose

Need to respond to the hospital sudden large-scale blackout accidents, rapid and orderly organization and restoration of power supply, to ensure the safety of patients and reduce property losses, to ensure that the hospital electricity smooth, and to promote the systematization and standardization of the accident emergency response, based on the relevant national laws and regulations, combined with the actual situation of the hospital. According to the relevant national laws and regulations, combined with the actual situation of our hospital, the development of this plan.

Second, the scope of application

The need for this plan referred to the "sudden large-scale electricity accident" refers to a serious natural disaster caused by damage to the important facilities or suffered a sabotage caused by the sudden hospital-wide failure of the security of the power system security line, the power grid occurred The accident of large-scale disintegration or collapse of the power grid.

Third, emergency principles

Large-area blackout accident handling work to implement the "prevention-oriented, unremitting" policy, follow the "unified leadership, improve the mechanism, clear responsibility, strengthen cooperation, rapid response, measures decisive" principle. Measures decisive" principle.

Fourth, the organization

Hospitals need to set up a large power outage emergency leading group, under the emergency repair team.

1, the hospital large power outage emergency leading group

Leader: General Manager

Deputy Leader: President

Members: Personnel and Administration Manager

Logistics Supervisor

Electrical repairman

Responsibilities:

(1) need to do a good job of the daily safety of power supply work, the implementation of safety production responsibility system to prevent large-scale power outage accidents.

(2) the need for large-scale power outage accidents, do a good job in a timely manner, power outage emergency work, as soon as possible to restore power.

(3) need to be based on the severity of large-scale power outages, the decision to start and terminate the emergency plan.

(4) timely need to report the accident to the higher level and to the community.

(5) If necessary, request external support.

(6) The leader of the leading group is the first person responsible for the fulfillment of the provisions of this plan. Members of the unit should be under the unified command of the leading group, each in its own way, each responsible for its own responsibility, full cooperation, and do a good job in the large-scale blackout accident when the social integration of emergency work.

2, emergency repair team

Captain: logistics supervisor

Members: electric repairman

Responsibilities: in the event of an accident, the organization of personnel to implement the rescue operation; to the command team to report the accident, if necessary, to the power supply sector to send a request for assistance, and then summed up the lessons learned from the emergency rescue work.

V. Emergency procedures

(a) logistics department electrician class emergency procedures

1 planned blackout emergency procedures

(1) electrician in the power supply company notification of blackout of the phone or other forms of blackout notification, you must ask the time of the power outage, how long the blackout and blackout reasons, and make a record. Do a good job of recording, such as not in the shift, should be clear in the handover of the shift.

(2) notify the head of the emergency leadership team (notify the chief duty officer at midnight), explaining the reason for the power outage, the specific time of the power outage, how long the power outage, and do a good job of the preparation of the backup second power supply.

(3) If during normal working hours, time permitting, should be issued in writing by the Department of Personnel and Administration to the departments to notify.

(4) If the time is urgent, after receiving the notice from the power supply company, should immediately notify the head of the emergency leadership team (night notification of the general duty officer), explain the situation, by the Department of Personnel and Administration to the departments to send a notice, the important departments to talk to the head nurse of the department of the power outage time, and make a good plan for the power outage.

(5) 30 minutes before the power outage to the distribution room, do a good job of switching to the second backup power supply pre-check. When the power outage to ensure the normal start and delivery of the backup second power supply in 15 minutes.

(6) 10 minutes before the power outage, all passenger elevators will be parked in the 1st floor position.

(7) When the external network power outage, start the generator power supply to ensure that the operating room emergency department and other key departments of the power supply.

(8) Make a good record of the operation of the second backup power supply and after the restoration of utility power supply.

2, temporary power outage emergency procedures

(1) a temporary power outage, you should immediately ask the power company by phone, ask the reason for the power outage and the duration of the power outage.

(2) Notify the head of the emergency response team or the general duty to explain the situation.

(3) If the blackout time is short (within 10 minutes), you should wait for the utility to send high and low voltage power.

(4) If the blackout time is longer, you should immediately prepare to switch the backup second power.

(5) For various reasons, the dual power supply can not start, should start as soon as possible standby generator, to ensure that the key departments of power supply.

(6) Make a good record of the operation of the second backup power supply.

(7) hospital internal reasons for power outages, to identify the cause of the power outage, high-voltage circuits or low-voltage circuits. If the high-voltage circuit failure, the hospital electrician immediately introduced into the backup power supply, should be promptly contacted with the power supply department repair class, as soon as possible to restore, to ensure that the electricity; if the hospital mortgage circuit failure, should quickly identify the cause, in accordance with the operating regulations to restore the circuit.

(B) departmental section emergency procedures

1, each section received a power outage notice, should be allowed to bar all of its power supply cut off, to be put back into use after the circuit is restored to normal.

2, after receiving the notice of power failure, immediately prepare for power failure. If there is a patient rescue use the backup power.

3, after a sudden blackout, immediately look for ways to rescue patients and their operation of the power to maintain the rescue work, and open the emergency lights lighting, etc.. And should promptly notify the electrician or the general duty.

4, critical patients using a ventilator in surgery should normally have a simple respirator next to the machine, in the event of a sudden power outage, health care workers immediately disengage the ventilator, the use of simple respirator to maintain breathing. The use of electric nitrogen suction patients, with a 50ml syringe connected to the nitrogen suction tube suction nitrogen.

5, such as double line are suddenly power supply failure, the hospital generator power supply, medical staff should first ensure that the patient resuscitation; nurses should be calm and collected, on the ventilator on the hand holding the ball method, on the monitor on the use of manual measurement of blood pressure and pulse, electric nitrogen inhalation is used to use a 50ml syringe connected to the nitrogen inhalation tube pumping, such as, close observation and please change, the rest of the staff immediately notify the electrician by phone, the Department of Personnel and Administration, and the use of emergency lights. Personnel Administration, and the use of emergency lights for lighting.

6, strengthen the patrol ward, appease the patients, while paying attention to fire and theft.

7, the elevator encountered a sudden blackout, logistics staff to do a good job of passenger thinking, to the outside call, with artificial methods to put all the passengers out.

Six, safeguard measures

1, the electrician daily should do a good job of generator maintenance, to ensure that the generator is always in use.

2, the electrician should usually master the knowledge of power supply and operating norms, pay attention to operational safety.

3, clinical departments routinely equipped with emergency lights, torches and other lighting, regular checks, to maintain a perfect state.

4, the logistics department should be organized to carry out emergency power outage drills, 1-2 times a year, through the drill, so that everyone is familiar with the emergency procedures for emergency disposal of sudden power outages, to ensure patient safety.

;