Detailed calculation method:
1) First of all, you can ask the other party to provide the preliminary process arrangement of key or complex parts, and explain in detail the time-consuming of each process.
2) The processing cost can be calculated according to the hourly cost of equipment required for each process. You can also ask the supplier about the specific equipment cost, such as:
Ordinary equipment such as milling machines and general cars with 60 ~ 80 hours (including tax) is generally 30. . .
3) Add packaging and transportation, management fees, tooling tools, and make a profit in proportion to get the price.
Of course, the price will have a great relationship with the annual purchase volume and difficulty of this part to a certain extent.
It is also easy to understand that there will be a big difference between single piece and batch.
Rough estimation method:
1) For large pieces, it is bulky and heavy.
The difficulty is average: the ratio of processing cost to the whole raw material cost is about 1: 1, which is inversely proportional to the purchase amount;
Difficulty: the ratio of processing cost to raw material cost of the whole parts is about 1.2 ~ 1.5: 1, which is inversely proportional to the purchase quantity;
2) For small and medium-sized parts
The difficulty is average: the ratio of the processing cost to the raw material cost of the whole part is about 2 ~ 3: 1, which is inversely proportional to the purchase volume;
Difficult: the ratio of the processing cost of the whole parts to the raw material cost is about 5 ~ 10: 1, which is inversely proportional to the purchase volume;
Because machining has great process flexibility, that is, a part can have many process arrangements, then the cost is of course different.
But suppliers sometimes tell you a complicated process to raise the price when quoting, but other simple processes will be used in actual production, so buyers themselves.
The reading of drawings and the knowledge of parts processing will determine your grasp of the cost, so the procurement of mechanical parts requires comprehensive machining knowledge.
The composition of processing expenses is generally given according to working hours!
If you want to process a workpiece, the first is the material cost of the other party; Then there are some travel expenses for purchasing workpieces (generally not);
The most important thing is the processing time of the workpiece you want to process. General Turner 10-20 yuan/hour, fitter is a little less, about 10- 15/ hour; The rest are not listed one by one;
If you don't have ready-made tools (such as knives and molds), you have to bear part or all of the purchase costs. Finally, it adds up to the processing fee you have to pay!
Material costs, machine depreciation, labor costs, management fees, taxes and other foundations are very important. Or the cost of materials, processing and taxes, as well as business expenses and transportation expenses. Budgeting requires a thorough understanding of many markets. If you don't stay in it for a few years, you won't get any clues at all. Even my teacher often feels sad! It's impossible to be completely careless!
Technical problems should include material cost, processing cost (which processing price is different), equipment depreciation cost, workers' wages, management fees, taxes and so on. Mainly to determine the process, that is, the processing method, and then calculate the working hours according to the process, and determine the basic processing cost of a single part by working hours, plus other expenses. Technology is a very complicated science. The technology used in a part is different, and the price is also different. In fact, the basic price of working hours for each type of work is not fixed, and it will be different according to the difficulty of the workpiece, the size and performance of the equipment. Of course, the key depends on your quantity, but generally speaking, it has a base price, which fluctuates between the base prices.
1. Basic car price: 20-40 depending on the actual situation, like small pieces, simple working hours are within 20 yuan; Sometimes even only 10 yuan, such as some big pulleys, has a large machining allowance, and the boss only earns enough money for cast iron powder; Sometimes when the workpiece is big, it can be a little higher, two or three times, and others can't help it. 2. Basic grinding price: 25-45.
3. Basic milling price: 25-45. 4. Basic drilling price: 15-35.
5. Basic price of planer: 15-35
6. Basic price of wire cutting: 3-4/900mm2. 7.EDM basic price: 10-40, 50 per piece (less than 1 hour).
8.NC basic price: 2-4 times more expensive than ordinary. 9. Sculpture: Generally it is a single piece. 50-500/ piece, of course, it is still a word. A specific price for a specific product. The above prices are for reference only. If you have any experience, I hope you can tell us and communicate with us.
No. Equipment Name TypeNo. Processing Range Processing Fee (RMB/hour)
1 lathe C616 φ 320× 750 ~1000
2 lathe C 6140 φ 400×1000 ~ 200013
3 lathe j1-mazak φ 460×1000 ~ 200015
4 lathe C 6150 φ 460×1000 ~ 200015
5 lathe C630 φ 630×1000 ~ 2000 21
6 lathe C650 φ 800× 1500 ~ 5000 30
7 vertical lathe c 5116aφ1600 28
8 radial drilling machine Z 3050 φ 50 ~ φ 63 16 9 radial drilling machine Z 3080 φ 80 20
10 vertical drilling machine Z5 140A φ 32 ~ φ 40 12
1 1 horizontal boring machine T68 1000× 1000 26
12 horizontal boring machine t 6111000×1000 30
13 vertical boring machine t 4163630×110056
14 horizontal boring machine t 611a1200×1200 36
150,000-capacity cylindrical grinder m1420 φ125 ~ 220× 350 ~100015
160,000-capacity cylindrical grinder m1432a m9025× 500 ~100019
170,000-capacity cylindrical grinder m1432b φ 315 ~ 320×1500 ~ 3000 26
180,000-capacity cylindrical grinder m1331φ 315 ~ 320×1500 ~ 3000 26
19 universal cylindrical grinder m1450 φ 500×1500 ~ 200028
20 precision universal external grinder mg1432 φ 320×1000 ~ 2000 3221internal grinder mg1432 φ12 ~ φ100×/kloc-.
22 surface grinder m 7120 200× 630 ~ 6501623 surface grinder m 7130 300×1000 21
24 surface grinder M7 150 500×2000 40
25 guide grinder M501001000× 6000 28
26 spline grinder m 8612a φ120×1800 28
27 thread grinder y 7520 wφ200×500 20
28 gear grinding machine y4632a φ 320× 6m30
29 universal tool grinder M5 MC φ 200× 500 13
30 universal tool grinder MW 6020φ200×500 13+03
3 1 universal tool grinder M9025φ 200× 650 16
32 universal tool grinder m6025h φ 250× 650 16
33 universal tool grinder M6425φ 250× 650 16
Broach grinder m 6110dφ100x1500 ~170016.
35 hobbing machine ym3 150e φ 500× 8m22
36-bar rack ym5 150b φ 500× 8m 18
37 vertical milling machine x5030a φ 300×1120 65438 vertical milling machine x52k φ 320× 1250 18
39 vertical milling machine XA 5032 φ 320×125018
40 horizontal milling machine X63W φ 400× 1600 24
4 1 ram milling machine XS5646/ 1 φ 425× 2000 28
42 shaper B665 650×800 14
43 Shaper B650 650×800 1 1
44 hydraulic shaper consists of 60100900 ~100016.
45 hydraulic shaper B690 900~ 1000 16
46 planer B20 16A 900~ 100028
47 gantry planer B2020A 2000~6000 50
48 bar seat B5032 200~320 12
49 Broaching machine L6 140 40T 15
50 marking fitter φ 200× 650 15
5 1 Assembly fitter φ 200× 650 30 52 Mold fitter φ 200× 650 30
53 machining center φ 200× 650 80
54 wire cutting φ 200× 6509 55
55 welding tool φ 200× 650 7
Due to different regions, different time, different manufacturers, different demanders, different suppliers, different quantities, many differences, different prices, not necessarily. However, it is generally charged according to working hours. Here is a reference (the figures are for reference only, and the difference between region and time is really great): This data does not include electric machining, such as wire cutting, which is generally charged according to the area to be machined. Charge standard for common machined parts
1. Pricing by working hours: Z25 drilling machine, CA6 140 lathe planer, slotting machine and sawing machine will be charged by 15 yuan/hour. Vertical and horizontal milling, wire cutting, large lathe and gantry milling are charged at 20 yuan per hour. The locksmith generally charges for maintenance per hour 15 yuan. The timing unit starts the takeover process and ends the acceptance process.
Second, according to the requirements of parts, quantity and accuracy, charging method:
1, drilling general materials
The basic price of general materials with depth-diameter ratio greater than 2.5 * depth-diameter ratio *0.05+0. 1.2 (the smallest hole is not lower than 0.5 yuan), and the diameter is less than 25MM, 25-60 * 0. 1 mm ... 5. The tapping fee is charged according to the tap diameter *0.2 (for cast iron, it is charged according to */kloc-.
2, lathe processing general precision optical axis processing.
If the aspect ratio is less than 10, it will be charged according to the blank size of the workpiece *0.2 (minimum 5 yuan); If the aspect ratio is greater than 10, it shall be charged according to the general optical axis base price * aspect ratio number *0. 15, and if the accuracy is required to be within 0.05MM or the taper is required, it shall be charged according to the general optical axis base price *2. Spindle, etc. ) The basic price of optical axis machining with general accuracy is *2. If the stepped shaft has taper and internal and external ribs, the basic price of optical axis machining with general accuracy is *3. The basic price of optical axis machining with general accuracy is *4. Generally, the charging standard for flange parts is *0.07, and *0. 12 for those with a diameter greater than 430MM. General round nut parts are charged according to diameter *0.25 (including materials), general trapezoidal nut parts are charged according to diameter *0.3 (excluding materials), and general shaft sleeve parts (diameter less than 100, diameter-length ratio less than 2) are charged according to material outer diameter *0.2, diameter-length ratio greater than 2 and diameter-length ratio * base price *0.6. Generally, the diameter of bearing seat parts with wear less than 2MM is less than 40MM. If the diameter is greater than 40MM, it will be charged according to the diameter *0.2.
3, milling machine processing general keyway processing.
Key slot width *0.5 (aspect ratio less than 10) (minimum 5 yuan). If the aspect ratio exceeds 10, it will be charged according to the aspect ratio * base price *0. 1 If there are strict location requirements, it will be charged at the base price of *2. Materials with hardness greater than HRC40 shall be processed according to the reserve price *2. For general spline machining (the aspect ratio is less than 5), it is calculated as spline shaft outer diameter *0.8 (minimum 15 yuan), and for general gear machining, it is calculated as modulus * number of teeth *0.5 yuan. Worm gear is charged according to cardinal number * 1.2. Bevel gears, bevel gears and modified gears are charged at the base price of *2. Ordinary plane machining is charged at per square decimeter 1.5 yuan (minimum 5 yuan), and ordinary boring is charged at aperture *0.25.
4. The cutting of general round steel, thick-walled tube and square steel for band saw processing is calculated according to 5 yuan per square decimeter (minimum 5 yuan), and the cutting, slicing and opening of general steel plate is calculated according to per square decimeter 10 yuan (minimum 10 yuan).
5. The cutting area of WEDM universal parts is (square millimeter) *0.008 yuan. For parts that need threading, add 5 yuan to each threading hole.
6. Ordinary covered electrode with a diameter of 3.2 1 yuan and TH506 welded castings/3 yuan are welded, gas cut and plasma cut. Gas cutting processing: plasma cutting stainless steel is calculated according to the thickness of iron plate MM* cutting length m, and charged according to the basic price of gas cutting *3, and cutting carbon steel is charged according to the basic price of gas cutting *2.
7. With regard to urgent parts and overtime parts, the definition of receiving urgent parts according to the standard base price of *2 is to arrange maintenance or manufacture emergency parts for specific customers at the first time. Overtime parts refer to parts that must be manufactured continuously outside normal working hours. 60 yuan/hour 200 lathe is used for curve grinding of optical tools 20 yuan/hour lathe over 300 30 yuan/hour milling machine 20 yuan/hour boring machine 15 yuan/hour 35 yuan/hour grinder 30 yuan/hour slotting machine 15 yuan/hour shaper 20~25 yuan/hour planer, milling roller 30 yuan/hour (rolled steel plate thickness less than 20 yuan). C6 140 Basic 20 yuan hour 30 lathe hour 30 yuan lathe hour 60 yuan rocker drill hour 20 yuan T68 boring machine hour 30 yuan cattle planer \ Small vertical milling and horizontal milling 20 yuan one hour gantry milling and planer 60 yuan one hour 400 square meters and less than one meter cylindrical bed one hour 20 yuan three meters away one hour 60 yuan machining center 80 yuan one hour (milling and car counting are the same) Electric welding gas cutting is basically calculated by piece, which is inconvenient to calculate. One-hour 30 yuan is used to calculate the fitter's one-hour 20 yuan. In addition, labor remuneration is also related to the quantity of external processing. When finishing, the market precision tolerance is 0.005 40 yuan/hour, the spark tolerance is 0.0 1 80 yuan/hour, the wire cutting tolerance is 0.005 100 yuan/hour, and the optical bending tolerance is 0.003 180 yuan/hour.
1. Annual output (determine input scale)
2. Distribution of plant and land input. Number of welders and depreciation rate of assembly line (assembly line allocation)
4. Quantity and depreciation rate of welding equipment (equipment input and configuration)
5. Cost of welding consumables. Welding fixture and depreciation rate (fixture input and distribution) 7. Wages (including wages, bonuses, meals, transportation expenses, medical funds, unemployment funds, pension funds, housing accumulation funds and personal adjustment taxes, etc.). ) and man-hour utilization rate 8. Input and distribution of energy consumption and environmental protection expenses.
9. The daily maintenance cost of welding equipment, fixture and assembly line is 10. The cost of scrapping and repairing is 1 1. Product development cost 12. The communication fee is 13. Profit rate 14. Various tax rates generally include the above aspects, and there may be many omissions! !