Cable construction general contract

The contract is a behavior with legal benefits, the moment the contract is signed on the legal benefits, can not be easily modified, change or default. The following is my compilation of cable construction general contract Model Daquan, welcome to read and share to learn, I hope to help you.

Cable Construction General Contract 1

Lessor (hereinafter referred to as Party A): _______________

Lessee (hereinafter referred to as Party B): _______________

In accordance with the principle of equality and mutual benefit, in order to clarify the rights of the lessor and lessee. The rights and obligations of the lessor and the lessee, Party A and Party B signed this contract by consensus.

First, Party A is willing to provide Party B with power cable construction tools and equipment, with Party B in the lease period of the use of technology and operational guidance.

Second, the rental equipment and the detailed list is as follows

Serial number: _______________

Name: _______________

Specifications: _______________

Unit: _______________

Quantity: _______________

Remarks: _______________

1. Cable conveyor _____ set with __________.

2. Tractor _____ sets with ______________.

3. Straight skid _____.

4. Ring skids _____ with _____.

5. Turning skid _____ pcs.

6. Cable tray _____ set with _______________.

7. Master control box ____ pcs with _______________.

3. Rental plan time _____ _____ month _____ day ~ _____ _____ month _____ day, *** booking _____ days. The lessee shall extend the lease period due to the need of the project and shall re-sign the contract within _____ days before the expiration of the contract.

Fourth, the rental cost: the total amount: ¥ _____ yuan (RMB: ___ million positive).

V. Rights and Obligations

Party A guarantees to provide Party B with machinery and equipment as shown above, and to ensure that all machinery and equipment running well. In the use of the rental process, Party B must take care of machinery and equipment, proper storage, careful use, do not barbaric operation, can not be privately folded and unloaded, if there is serious damage to machinery and equipment according to the cost of maintenance price required to charge compensation. If during the lease period due to Party A project needs, Party B must be required by Party A unconditionally return the rented equipment.

Sixth, the settlement method: after the expiration of the lease period, Party B to pay a one-time agreement to determine the cost of the lease. If you need to renew the lease, the cost of negotiation between the two sides.

VII. Matters not yet resolved, the two sides to negotiate.

VIII, this contract in a single four, the lessee, the lessor holds two copies of this contract signed and sealed by representatives of the two sides can take effect.

Lessee: __________________ Lessor: ____________________

Manager: __________________ Manager: ____________________

Phone: ____________________ Phone: ______________________

Unit Address: ________________ Unit Address: __________________

_________ Year _______ Month ______ Date. _______ _______ month ______ day

General Contract for Cable Construction 2

Party A: ______________ ID No.: ________________

Party B: ______________ ID. No.: ________________

In order to ensure the quality, progress, safety and civilization of the construction, and to clarify the responsibilities and rights of both parties, in accordance with the provisions of the Civil Code and other relevant laws and regulations, combined with the specific circumstances of the project, by the consensus of the A and B parties agreed to enter into the contract and strictly abide by the implementation.

1. Project name: ________________

2. Quality grade

Party B must be in accordance with the requirements of A and the relevant operating procedures, technical regulations, technical specifications for construction; required to excavate the cable trench width of ____cm, the depth of ____cm or more. Strictly in accordance with the relevant engineering quality standards, engineering quality control standards, engineering assessment standards, engineering quality inspection and assessment of uniform standards, construction quality acceptance of uniform standards, engineering quality inspection and assessment of standards for inspection and assessment; the quality of the project must reach the qualified level of the relevant standards.

3. Contract price:

3.1 The contract price is set as the total **** per meter of excavation cable trench and earth backfill ________ RMB.

3.2 After signing the contract, it will be executed in accordance with the pricing standard agreed in this contract, and no adjustment will be made by both parties regardless of any price increase or any other reasons.

4. Project Settlement:

4.1 The length of cable trench shall be calculated based on the actual useful length specified by Party A.

4.2 cable trench all excavation is completed, pay all the excavation is completed after the completion of the total project cost of 50% of the project cost, to be laid after the cable, all cable trench backfill is completed after all the work will be settled.

5. Progress plan: Party B started construction in ____________, Party A in the laying of cables at the same time, Party B must cooperate with Party A to do a good job in a timely manner of earth backfill work, otherwise all the losses caused by Party B is responsible for.

6. Party B must comply with the "People's Republic of China *** and the State Safety Production Law", in accordance with the national and relevant industry procedures, norms, rules, requirements, methods and national standards of the People's Republic of China *** and the national standard "safety inspection standards for building construction," jgj59-99 and the Party's safety production management system and other production safety management to ensure that the construction is safe. Party B shall handle its own construction personnel within the scope of the accident insurance.

7. Party B must set up a construction site safety management department and equipped with familiar with the safety of construction management business, through the safety management training of safety management personnel in the construction site. Any safety problems in the construction process are Party B's responsibility.

Party A: ____________ Party B: ____________

____ year ____ month ____ day

Cable Construction General Contract 3

Lessor (hereinafter referred to as Party A): _______________

Lessee (hereinafter referred to as Party B): _______________

In accordance with the principle of equality and mutual benefit, in order to clarify the rights and obligations of the lessor and the lessee, A, B and the two sides by consensus, signed this contract.

First, Party A is willing to provide Party B with power cable construction supporting tools and equipment, with Party B in the lease period of the use of technology and operational guidance.

Second, the rental equipment and the detailed list is as follows

Serial number: _______________

Name: _______________

Specifications: _______________

Unit: _______________

Quantity: _______________

Remarks: _______________

1.Cable conveyor _____ set with __________.

2. Tractor _____ sets with ______________.

3.Straight skid _____ pcs.

4. Ring skidder _____ pcs.

5. Turning skid _____ with.

6.Cable tray _____ set with _______________.

7. Master control box ____ pcs with _______________.

3. Rental plan time _____ _____ month _____ day ~ _____ _____ month _____ day, *** booking _____ days. The lessee shall extend the lease period due to the need of the project and shall re-sign the contract within _____ days before the expiration of the contract.

Fourth, the rental cost: the total amount: ¥ _____ yuan (RMB: ___ million positive).

V. Rights and Obligations

Party A guarantees to provide Party B with machinery and equipment as shown above, and to ensure that all machinery and equipment running well. In the use of the rental process, Party B must take care of machinery and equipment, proper storage, careful use, do not barbaric operation, can not be privately folded and unloaded, if there is serious damage to machinery and equipment according to the cost of maintenance price required to charge compensation. If during the lease period due to Party A project needs, Party B must be required by Party A unconditionally return the rented equipment.

VI. Settlement: After the expiration of the lease period, Party B will pay a one-time agreement to determine the lease costs. If you need to renew the lease, the cost of negotiation between the two sides.

VII. Matters not yet resolved, the two sides to negotiate.

VIII, this contract in a single four, the lessee, the lessor holds two, this contract by the representatives of the two sides can take effect after signing and sealing.

Lessee: __________________ Lessor: ____________________

Manager: __________________ Manager: ____________________

Phone: ____________________? Phone: ______________________

Unit address: ________________ Unit address: __________________

_________ _______ _______ _______ ______ Day

Cable Construction General Contract Model Book Related Articles :

★ Purchase of cable and wire contract model

★ Wire and cable procurement contract model

★ Purchase of wire and cable contract

★ Simple wire and cable supply contract model 3 latest

★ cable supply ★ Cable supply contract

★ Cable supply contract

★ Simple construction commissioning contract model 3 the latest

★ Engineering plumbing and electrical installation contract model 5

★ Cable purchase and sale contract model

★ Cable purchase contract model