1. equipment department work plan how to write a model
First, the campus information technology construction work
The new year, will be the school information technology construction work of the key year, we will be around to further improve the construction of hardware, to strengthen the construction of the application system and the integration of the construction of the system, the establishment of rules and optimization of the process, the good application of information technology training, etc. to carry out the work.
1. Application system
In 20xx, the information technology work shifted from hardware construction to the construction of the application system, and promoted the testing and operation of the constructed application system, such as the office system, the personnel system, the alumni system, and the network teaching platform. Assist the use of the department to carry out research management, student integration, virtual experimental teaching and other systems of investigation, procurement and construction work, to ensure that the key application systems deployed under a unified standard, a unified specification and a unified platform. Assist departments to carry out workflow reengineering and optimization for application systems.
2. Network interconnection with the West Campus
The use of leased fiber optic cable operators to solve the problem of interconnection between the two campuses (just yesterday afternoon the end of the negotiation of bids).
3. Multiple entrances and multiple exits
To solve the problem of slow access to the public network of the university website. Through technical means, to achieve the optimization of our school network of multiple entrances and multiple exits, to improve the speed of external access to our school website.
4. Mobile office technology research
Through technical research, to determine the realization of mobile office form, and at the right time to realize the school's business systems of mobile office.
5. New campus campus network construction
According to school planning, the new campus will be opened in September. To this end, this year should be planning and designing the new campus network layout, complete the new campus network construction and one card system construction work.
Second, laboratory construction and management
1. Do a good job in 20xx laboratory construction project demonstration, evaluation, construction work.
2. Strengthen the assessment of completed projects. This semester, the organization of the 20xx year part of the laboratory construction of completed projects for inspection and acceptance. Acceptance results will be linked to the laboratory assessment and as an important basis for the next year's laboratory construction projects.
3. Strengthen laboratory management. According to the adjustment of school disciplines and specialties, the timely adjustment of the laboratory of the faculty; laboratory information collection, to ensure that the provincial Department of Education basic statement of the data required to summarize, enter and report the successful completion of the work; do a good job of the target responsibility system assessment and other work.
4. Do a good job of public **** experimental teaching platform demonstration and research work. Promote all kinds of experimental teaching resources *** enjoy, *** use, and gradually formed by functional distinction, cross-college public *** experimental teaching platform; strengthen the construction of experimental technology team, and promote the scientific, standardized and modernized laboratory management.
Third, equipment management
1. Instrument and equipment account management. The school post employment work has ended, the department name, functions, personnel and other changes, the next step, the Equipment Department will work with the Finance Department of the Office of State-owned Assets, re-employment of equipment managers of various departments, and the instruments and equipment belonging to the actual situation of the transfer of the account processing. At the same time, to strengthen the management of donated equipment, the current year will be the previous and the school celebrates the period of donated equipment from outside organizations to be accounted for.
2. Disposal of used instruments and equipment. Our school in the account to be disposed of more and more instruments and equipment to be scrapped, urgently need to be resolved. This year, the Laboratory and Equipment Management Division will introduce the "xx College instrument and equipment transfer, scrapping management approach", the next step, according to the school's equipment funding, will be in accordance with the procedures, in line with the principle of first urgent and then slow, 1-2 times a year for the disposal of scrapping.
3. Management of large instruments and equipment. With the school precision valuable and large instruments and equipment increased year by year, the management of large equipment needs more and more urgent. In order to strengthen the management, this year to complete the construction of large instrumentation resources **** enjoy the platform and the development of related management system.
In short, the level of laboratory construction and management is not only a sign of the strength of higher education, but also an important reflection of the level of teaching, research and management. With the development of the school, the laboratory construction and development of our school is facing new problems. As the competent department, the Laboratory and Equipment Management Department will continue to do a good job of organizing, coordinating and serving the work of our university laboratory construction and management work out of the characteristics of the level, make our efforts.
2. How to write a sample work plan for the equipment department
First, equipment maintenance
1, according to the report quickly find the cause and solve the problem.
2, for the maintenance of equipment to make a good record for future reference.
3, if the equipment beyond the department's ability to repair, timely delivery to the relevant units for repair.
4, has been repaired equipment timely notification of repair personnel to receive.
Second, the server room maintenance
1, servers and switches regular maintenance.
2, computer room health regular cleaning.
Third, information technology equipment supervision
1, the company's computers whether there are privately installed software unrelated to work to do occasional spot checks.
2, the company's information technology equipment for the daily use of maintenance and health to do irregular spot checks.
3, for the violation of the use of information technology equipment in accordance with the provisions of the penalty.
Fourth, the inventory of supplies
1, supplies to do a good job of written registration.
2, consumables inventory form regularly updated.
3, for the immediate exhaustion of supplies timely notification of procurement.
3. How to write a work plan for the Ministry of Equipment
First, the work of the idea
The work of the idea of 20xx "to ensure that the equipment is good operation, improve the quality of equipment maintenance personnel, strengthen the implementation of the system and the fulfillment of job responsibilities, and comprehensively enhance the level of management of equipment. management level, to play the economic benefits of equipment management."
Second, the specific work objectives
(1) equipment integrity rate of 97% or more.
(2) to put an end to large, major equipment liability accidents.
(3) equipment repair cost rate in line with the requirements of the factory regulations, to prevent equipment repair.
(4) Strengthen the management of information to ensure its authenticity, accuracy and practicality.
Third, the main work and measures
1, change the idea of equipment management, from passive aftermath maintenance to active preventive maintenance. Strengthen the management of equipment maintenance, strict implementation of the rules and regulations, according to the use of machinery and equipment in recent years and intact condition, the development of equipment maintenance plan and maintenance plan of the month, by a person responsible for and check, on time and at the level of maintenance of machinery and equipment, regular maintenance testing, and carefully do the maintenance of machinery and equipment records.
2, do a good job of equipment inspection. Each workshop equipment maintenance personnel should be noted in the equipment checklist to do a good job daily, weekly, monthly, annual equipment inspection, and make records. Problems found in a timely manner, so that the maintenance of equipment is really down to earth.
3, the equipment manager should often go into the workshop production line to check and understand the operation of the important equipment, tracking the inventory and procurement of major spare parts, urge the Procurement Department of the main shortage of procurement of accessories, check the workshop homemade parts of the processing of the production situation to ensure that the main accessories with the use of with; check and supervise the workshop to do a good job in the day-to-day maintenance of the equipment, and to make the technical guidance!
4, increase equipment management assessment. In accordance with the new formulation of equipment management assessment management regulations, to do a good job in the implementation and execution of the new provisions, one is to organize equipment maintenance personnel to seriously study and understand the new equipment management assessment regulations. Secondly, on the basis of comprehensive inspection, the inspectors should strengthen the inspection and assessment of important equipment and key contents every month. Third, according to the actual needs of equipment management, and constantly add to improve the equipment assessment regulations, so that it is more in line with the laws of equipment management, as well as better 'promote and improve the level of equipment management.
5, improve equipment management system, regulations. The existing equipment management system to review, improve, supplement and increase, so that the equipment management work constantly adapted to the company's production and business environment.
6, do a good job of equipment maintenance personnel training, enhance the quality of training. First, actively organize the selection of outstanding personnel to participate in government departments to organize skills business training and learning. The second is to do a good job of internal training and learning, learning equipment maintenance knowledge. Third, with professional manufacturers, the production process of operation, maintenance and failure of more equipment, special training, focusing on the operation of the main. Fourth, professional and technical personnel are invited to carry out on-site practical operation training for equipment maintenance personnel. Fifth, to participate in training personnel, the requirements of writing training experience, learning to achieve gains and training recommendations to enhance the effect of training, participation in training and learning personnel, training and learning to the end of the training within 7 days to the equipment section of the submission of training and learning experience.
7, clear data management of the main body to strengthen data management. To fill out the model in accordance with the factory requirements uniformly, standardize the content, and put an end to the alteration, the data is not true.
4. How to write a work plan for the Ministry of Equipment
A mechanical equipment, the use of vehicles:
1, mechanical equipment, the use of vehicles must be carried out in the "management of maintenance and repair combined with a relatively fixed" principle. Principle, the implementation of fixed, fixed-post responsibility system, multi-person operation, multi-shift operation of machinery and equipment should be a captain, the establishment of the captain's responsibility system, in the small form of machinery and equipment, the implementation of the mechanic's responsibility system.
2, without the training of qualified personnel, are not allowed to operate, is strictly prohibited without a license to drive vehicles (including motorized construction machinery), is strictly prohibited to the main mechanical equipment to the operation of civilian workers.
3, the captain of the project by the Ministry of appointment and dismissal, the captain can enjoy the captain's allowance.
4, the driver traveling allowance, mechanical dust operation allowance according to the relevant provisions of the company documents.
Second, the operator's job responsibility system:
1, machinery and equipment operators, car drivers, must be subject to the production scheduling or mechanical department of the work arrangements, strict implementation of safety and technical regulations, is strictly prohibited to operate the locomotive after drinking, to ensure safe production, to ensure the quality of the construction, and strive to reduce energy consumption and other indicators.
2, seriously do a good job of daily maintenance of the locomotive. Before starting the machine, we should carefully check the tightness of the screws in each part, and grasp whether the lubrication, fuel, cooling water, etc. are normal, and after stopping the machine, we should carry out the cleaning and cleaning inspection, stopping in a neat and orderly manner, and keep the machine in good condition and neat, and should not dismantle the parts and auxiliary devices, etc. We should also check whether the machine is in good condition.
3, the implementation of multi-shift operation handover system. When handing over a shift, you should hand over the operation record of the locomotive to the person who takes over the shift, and make sure that the handover procedures are complete.
4, adhere to the weekly routine maintenance system, routine maintenance for four hours, usually on Saturdays, such as busy work can be used after hours. When contracting operations, the person in charge of the contracting group to arrange maintenance. No falsification, maintenance date records and monthly inspection form submitted to the machine, if found not carried out or maintenance is not good, the machine has the right to penalize.
5, the use of automobiles to implement the dispatch list system. By the mechanical or scheduling or office unified dispatch vehicle, the driver with the dispatch sheet out of the car.
6, mechanical vehicles, unless the project department arrangements, no one shall not operate without authorization, once found, mechanical or safety officer has the right to impose penalties.
7, the locomotive operator in principle, the implementation of fixed person, fixed machine, fixed post "three" system, if the work required by the scheduling of flexible arrangements.
8, the operator without any arrangement, shall not unauthorized custody of the locomotive to others to operate or private use. Otherwise, the person concerned, the locomotive custodian to bear full responsibility and compensation for all economic losses.
9, the operator, such as violation of safety and technical operating procedures, resulting in machine damage or safety accidents, depending on the degree of damage, the severity of the case, the implementation of the "three do not spare" principle, and according to the relevant provisions of the company to be punished.
10, cars, motorized bucket trucks, cranes, mixing stations, generators and other machinery and equipment, arranged by the machine or shift fixed operator, according to the number of machine operation, use, maintenance, without permission shall not be switched.
11, the operator of the custody of the locomotive, need to timely and accurately fill out the operating records (filled out with charcoal ink) on the 25th of each month to the machine statistical report.
12, motorized bucket trucks, cranes, loaders, without the leadership or scheduling or the Department of Mechanical Services arrangements, no one may not drive away from the site site, may not be used as a means of transportation, is strictly prohibited in the construction site, commuting to and from work at will to carry a person, such as found in violation of the penalties.
13, actively engage in energy conservation, vehicles and construction machinery, the implementation of energy consumption assessment. The operator of the equipment to be overconsumption of written reports on the reasons for handing over the machine analysis, the implementation of the section has a prize, super to be punished.
14, the operator should strive to study technology, to achieve multi-talented, to achieve "five understand" (understand the structure, understand the principle, understand the performance, understand the use, understand the use of oil common sense), "three will" (will operate, will be routine maintenance, will be able to troubleshooting).
15, the operator must actively participate in the red flag equipment competition, machine organization for assessment, was named red flag equipment, according to the provisions of the award.
Third, mechanical equipment, vehicle repair and maintenance:
1, mechanical equipment, vehicle accessories by the mechanical department plan, the material department is responsible for purchasing, mechanical personnel to receive, and indicate the number of locomotives, on the 25th of each month by the Ministry of Materials to transfer the receipt of a single link to the machine so that the single machine accounting.
2, the repairman must obey the machine, scheduling arrangements, to do the urgent engineering needs, the mechanical failure in a timely manner, to ensure quality.
3, machinery and equipment second guarantee, third guarantee, overhaul by the mechanical planning arrangements, to be sent out for repair of locomotives, by the mechanical selection of the plant in charge of the deputy manager agreed to set out the repair project, the level of repair, the budget repair costs, repair is completed, to be inspected by the mechanical technician factory, the internal repair and maintenance of machinery and equipment vehicles, by the mechanical technician is responsible for the inspection and acceptance.
4, the car on the way to failure, the need to enter the factory to repair and replace parts assembly, to report the project department of the relevant leadership or the Department of Mechanical Services in a timely manner.
5, the new machinery into the field and the transfer of machinery installation, repairmen, operators should actively cooperate with the mechanical technicians to install and debugging.
6, mechanical equipment configuration to the sub-project team, contracting group use. When the mechanical equipment needs maintenance, the project team, the contracting team should actively send people to cooperate with the repair.
Fourth, rewards and penalties system:
The end of the year assessment of equipment management, use, maintenance, repair to do a more outstanding operator to give certain rewards, to do a poor operator to be punished.
5. How to write a work plan for the Ministry of Equipment sample
I. Team building
1. Team resource integration, the right people in the right positions, so that people make the best use of their talents, make the best use of their resources in practice, and the gradual implementation of the youth, knowledge, specialization.
2. The management team according to its performance in 20xx to implement fine-tuning and change, and strengthen the echelon construction of the management team. The implementation of internal job competition,
Second, the implementation of the plan
This year, before the arrival of the peak season, we made a comparative analysis of the production capacity of the production department of the peak season in 20xx and the actual production in 20xx, the peak season of each month's production, manpower loading, the existence of risk have made a detailed prediction, and its determinants take the appropriate measures to ensure that the plan is achieved.
Third, the construction of the system
1. Newly developed equipment inspection management form, so that it is more in line with the requirements of the current state of equipment management;
2. Promote the 6S on-site management, and the strong implementation of the target system, the system of daily clearing, incentive system.
3. Signed with the sections of the "equipment management objectives and responsibilities", and strictly implemented. To break the pattern of doing a good job and eating a pot of rice, continue to promote the construction and improvement of TPM independent maintenance.
Third, the equipment transformation
1. × × × a complete set of automated assembly line equipment design and customization;
2. × × × conveyor belt, the design and customization of the selection machine;
3. × × × drying room new projects;
4. The introduction of automated packaging equipment, the introduction of the color sorter equipment.
Fourth, equipment energy improvement projects
1. Boiler water mill dust water recycling;
2. The reuse of cleaning water in each workshop;
3. Brine concentration project;
4. Multi-functional steam back to the recycling of water.