How to write a personal work situation report 1
I am in education and teaching, dedication, rigorous teaching, love of students, and strive to do a good job of teaching students, so that students succeed in becoming successful. Information technology class, not only for students to learn a few operations, but more importantly, to improve students' information literacy. Can truly be a teacher, teaching and educating people, better fulfillment of the educational teaching tasks, to do a good teacher due diligence. Therefore, I have paid attention to the following issues in education and teaching, now summarized as follows:
I, ideological
I can seriously study the party's line,, policies and guidelines, and always keep in line with the Party Central Committee resignation. Love of the party's educational cause, love of work, strengthen self-cultivation, to achieve high as a teacher, the body as a model, love of students, sincere treatment of students, by the students' praise. Especially during this period, I worked hard to learn political theory, and actively participate in a series of political activities organized by the school, will learn the theoretical knowledge of the practical application of work practice.
Second, teaching
The prerequisite for a good class is to do a good job of preparing for class, do not fight the battle of the unprepared, especially the main courses in this discipline are to be completed on the machine, each class should be carefully prepared for the machine, check the status of the machine, there is no "unavailable machine". In class, we will give lectures carefully, with clear teaching objectives, in line with the actual situation of students, reflecting the scientific and ideological nature of the teaching materials, and strive to achieve the unity of information knowledge, information ability and information sentiment. The objectives of "knowledge and skills", "process and method" and "emotion and value" can be realized. Attention to classroom management, during the classroom students are required to operate in strict accordance with the tasks given by the teacher, and at the same time pay attention to the teaching of the students, the class in a timely manner after the post-class reflection, and constantly summarize the experience.
Three, personal teaching business level learning
Only by constantly updating their knowledge, constantly improve their own quality, and constantly self-pressurized, in order to information knowledge more fluent, easy, complete teaching to students, in order to allow students to always walk in the forefront of information technology knowledge, to keep up with the pace of the times of constant development. Seriously and proactively learn from other experienced teachers in order to be able to work with a solid theory as a guide to better education and teaching.
Four, my future efforts
1, to strengthen their basic skills training, classroom to do fine practice, pay attention to the development of students' abilities.
2, more care for poor students, more love, and then more patience, so that they have more progress in the understanding of the computer.
3, the use of various teaching methods to improve students' attention.
The above is a summary of my teaching work in this semester. Society is developing, the times are advancing, and the characteristics and problems of students are constantly changing. The work of education and teaching is a work that is always new and never-ending. As an educator, we must be highly sensitive and conscientious, timely detection, research and solution of new situations and new problems in student education and management work, to master its characteristics, find its laws, and do a good job, I want to "strengthen the quality of the external image, accelerate the development of first-class! As the goal, practical work, service to the teaching, and strive to contribute to the development of the school's own strength.
How to write a personal work report 2
Time is like electricity, fleeting, snap your fingers, 20_year has passed, in serving as the _ branch of this year's business manager period, I work hard, and constantly enterprising, in their own business level has been greatly improved at the same time, the ideological aspect has also made considerable progress. Now the first half of the work report is as follows:
A work summary
Since serving as business manager, I y appreciate and feel the duties and mission of the position. Account Manager is a business card of our bank to the public service, is the hub of customer and our bank contact.
The social demeanor and demeanor of customers represent the image of the bank. Usually continue to learn communication skills, master the communication method, with "work is my career" attitude and running forward with the work approach to the work.
Collect quality customer information from all sides, keep abreast of customer dynamics, visit customers in the middle of the bridge, go down to the enterprise, the authorities, in-depth customer, no bus when the bus ride, sunny and rainy as always, every day, different customers daily maintenance, even a text message of blessings and greetings, are on behalf of the Bank of the customers of a miss. Enthusiasm, patience for customers to answer questions and solve puzzles, calmly with a relaxed posture and friendly smile to face the customer, fast, clear to the customer to convey the information they want to know, and good communication with the customer and achieve good results, to win the customer's general recognition of my work.
In the credit business, seriously do a good job in the pre-credit investigation, post-credit checks, tracking investigations, information submitted in a timely manner for review and archiving. 20_ years, the cumulative issuance of loans of more than 33.5 million yuan, on-time collection of loans of 6.41 million yuan, of which there is no one non-performing loans and bad credit produced in the quality of the acquisition of operating profits at the same time to realize the work of personal compliance, to ensure the safety of credit funds.
Second, there are problems
In the past year, although I have made certain achievements in various aspects, however, I also clearly see the inadequacy of their own.
1, learning is not enough, in the face of the deepening of financial reform and the diversification of the market economy, how to master the financial information and the city's development dynamics, sometimes can not keep pace.
2, on tapping existing customer resources, customer superiority, improve the number and quality of customers, to enhance the customer's greater contribution to the Bank and loyalty has yet to be strengthened.
3, further customer service young and impatient, to be down-to-earth, improve work initiative, more work and less talk, in practice to improve their own, the above deficiencies I am trying to correct.
Three, future efforts to
In the new year, I will continue to work harder, pay more attention to the new regulations, new business, new knowledge of the study of the research, improve the way and means of work, work hard and actively enhance the awareness of the purpose of the service, take out a lot of courage, take out the boldness of the pioneering, solidify the foundation of their own business, towards a higher and farther direction, with the "new" direction. The "new" work of the actual work of all kinds of difficulties encountered.
How to write a personal work situation report 3
A year's time has gone by like this, after a year of hard work, I can finally say that I have made more progress in the continuous growth. A year has gone by really fast. As a hospital physician I, a year of serious hard work, this year for me, but also a rather nostalgic year, I believe that as I gradually grow, I will have more progress, these are things I will do well, I believe that I can do well, I will continue to grow in the development that I get. In the coming year, continue to adhere to:
One, ideological and political always in line with the central government, closely around the hospital to carry out the theme of integrity and self-discipline
Engage in medical activities, keep up with the international and domestic situation, refused to bribe, bribery, strict requirements for their own; obedience to the leadership, unity of colleagues, love and dedication to their jobs, did not occur a medical errors and disputes; at work, everything is centered on the patient. Work, all patient-centered, wholeheartedly for the sake of patients, in line with the "saving, saving environmental protection, excellent effect" principle, choose a simple medical special method, make the most ideal medical special effect.
Second, under the leadership of the director of the department, the business adhering to the fine traditions and styles of the past
Serious study, diligently summarize the past experience, "to extract the essence of the past, to remove the false and keep the true, from the surface to the inside, to remove the dross, to take the essence". To improve and skillfully apply a variety of common methods and techniques for medical specialties, such as: nerve block in various parts of the body, regional block, various methods for systemic medical specialties and various puncture techniques, as well as the maintenance and use of various instruments and equipments. He guides and counsels interns, junior residents and attending doctors, combining theory and practice, learning and mastering the operation techniques and workflow of basic medical specialties, teaching them by example, and impregnating them with good medical ethics and medical skills, giving full play to the role that an associate physician should play.
Three, work performance compared to the previous year, the number of cases of medical specialization has increased
Daytime medical specialization level has improved; learning to master the medical specialization of the specific application of several new drugs; pediatric, the elderly medical specialization more comfortable. In the future, we should be more adept at learning and summarizing, advancing with the times, keeping up with the pace of the times, learning to master newer and better medical technology, benefiting society, benefiting the patient at the same time, perfecting and enriching their lives.
That's it, as a physician, you must have a high sense of responsibility. Saving lives and helping people is our vocation, and I believe that with the growth of time, my medical skills will be more improved. But these are not the most important, the idea is the first, as long as the attitude of serving the people, I will be able to do better, I believe I can do well. Physician's responsibility and vocation is this, I will work better in the coming year!
How to write a personal work report 4
Time flies, unconsciously has spent more than twenty years of architectural engineering construction worker's working life. I have been involved in construction work since ___ years to date, I have been in the project department through internships to work as a builder, over the years can be independent of the construction work of the construction workers, the completion of an orderly, so with the project department of the upper and lower management staff to get along with the deep trust. Recall that in these years of construction work both busy and harvest, the following I will do a brief summary of this year's work:
A, project quality management
As a project construction personnel, not only to use a lot of professional knowledge, but also need to have a certain field experience and the necessary business ability to dominate and coordinate the team. So many years of construction site quality management work has benefited me greatly. Do a good job of prior control work, prevention and elimination of construction hazards exist. Before the start of the project, fully familiar with the construction drawings, participate in the design institute's drawing review activities, combined with the actual project, the requirements of the national quality acceptance norms to participate in the preparation of special construction programs, quality and technical delivery card, serious, serious guidance to the team of workers work.
Do a good job in the supervision of the work, find and correct the problems in the construction, the quality of the project for a comprehensive inspection of the construction of the problems arising in a timely manner, correct. The construction of special procedures of the construction process of the construction of the whole process of tracking and inspection to ensure that each process is qualified, with the project department of civil engineering technicians to inspect and solve the concrete pouring process of various situations, timely rectification, to ensure that the quality of each link of the construction of the standard. Through my dedication to check and strict quality control, each construction link has been praised by the company's leadership, but also led the management of the brother project department to learn.
I have a construction problem in the aftermath of the summary analysis, in order to facilitate the continuous improvement of the work. Every day after the end of the construction process to find out the construction process is prone to future problems and construction process desirable, written in the construction diary; to participate in the weekly supervisory meeting, the project department meeting and the monthly owners of the coordination meeting, how to work to ensure that the substantive results of the summarization, and constantly improve the level of personal business; submit weekly reports to the company in a timely manner, monthly report, will be on-site quality problems and must be coordinated by the company to solve the problem seriously reflected. The company and the project department are organically linked together.
Through my own continuous learning, I have a clearer idea of the various aspects of site construction. In the _ hotel project, I am more conscientious work, give up personal rest time, dutifully check the management, timely correction of problems in the construction of this project to make an important contribution to the recognition and praise by the A party supervisor.
Two, engineering as-built drawing preparation
Familiar with the actual construction content of the site, to help the internal work group will produce changes (including drawing review issues, design change notification, engineering business contact list) of the content of the as-built drawings into the organization. As-built drawings can specifically reflect the actual construction content with traceability, for future settlement and completion of the information provided by the basis.
Three, study hard to improve their own cultivation
With the passage of time, technology continues to progress, I feel the lack of knowledge will affect the future effect of the work, I use my spare time to read a lot of professional books, to explore the learning of new technologies and new inventions, at the same time, I drive the project to other managers to learn the professional knowledge, from the basics of the basic knowledge, let the technicians and I learn together! At the same time, I drive the other management personnel of the project department to learn professional knowledge, starting from the basic knowledge, let the technician and I learn the new norms and standards of the new technology, and constantly improve their professional quality, so that the construction force of the project department and the technical force to develop and grow together.
Four, shortcomings and improvements
In the future construction management. I also y appreciate the existence of success and shortcomings. For this reason, in the future of the project management work, I will continue to seriously study the business, study with an open mind, improve business and diplomatic skills, master deeper knowledge and technology, the project department's humane management, focus on the training of staff skills, as well as the collective staff care about each other, a good corporate atmosphere, I believe that I will be in the development of the project department family, grow up to become a really good engineer!
How to write a report on individual work 5
In order to give full play to the effectiveness of the monitoring work to improve the economic efficiency of enterprises as an important means of action to promote the Xigu Thermal Power Company, "the year of efficiency" the realization of the objectives and tasks, and to improve the implementation of the system of management personnel of the various professions, we set up a project to carry out in April materials, procurement and engineering project management special performance monitoring, and the project management of the project is to carry out the work of the project. Procurement and engineering project management special performance monitoring work. Now the work carried out is summarized as follows:
One, the work of preparation
We carefully formulated the material procurement and engineering project management of special effectiveness monitoring implementation program, clear the effectiveness of the monitoring of the purpose, methods and steps, and organized and implemented in phases: purpose: vigorously implement the procurement of materials, "Sunshine Project Purpose: To vigorously implement the "Sunshine Project" of material procurement, plug the loopholes, reduce the procurement cost, put an end to disciplinary and illegal behaviors, and improve the economic efficiency of the company. Work method: through the establishment of sound material procurement rules and regulations, standardize the material procurement bidding procedures. Steps: April 3 - April 30 for the study and publicity stage; May 1 - May 31 for the self-examination stage; June 1 - August 15 for the inspection stage; August 16 - August 31 for the rectification stage; September 1 - September 15 for the summing up and improvement stage.
Two, the self-examination of the situation:
Materials Supply Department, the Ministry of Equipment and other functional departments in the self-examination phase in accordance with the requirements of the implementation of the program in earnest, the organization of departmental personnel to carry out thematic study. The relevant system based on the Group, Datang Gansu Company's systems and regulations to sort out the comparison. Departments combined with the actual revision of the company, the implementation of the system of loopholes and deficiencies in a timely manner to improve; can conscientiously fulfill the procurement of materials process management and the establishment of reliable quality, timely service, the supplier team information base, and signed a contract of good faith with the various suppliers. All of the above departments have submitted their self-examination reports to the Efficiency Monitoring Office on time.
Third, inspection:
After the self-inspection work, the Supervision and Audit Department, together with the relevant departments, inspected the management of material procurement.
1, first of all, a systematic basic inspection. The material department, equipment department in 2006 related to material and equipment procurement of basic information was inspected. Check all kinds of bidding, negotiation work in the program information and integrity assurance, scoring table and other related information is complete and standardized. Through the inspection, all kinds of information are more standardized, complete and meet the requirements.
2. The standardization of implementation procedures and systems was checked. According to the requirements of Datang Gansu Company's documents, more than 300,000 yuan should be tendered or authorized by Datang Gansu Company to organize tendering, and less than 300,000 yuan can be negotiated by our organization. In the bidding and negotiation work of each project of the Company, the Supervision and Audit Department supervised the whole process. Through the inspection, the functional departments can implement the systems as required and work according to the procedures.
3, we focus on the collective business negotiation program to carry out random checks. Through the spot check, the implementation of the procedures is better, but also found that there are individual shortcomings. For example: in the raw water pipeline valve replacement project in the procurement of metal hard seal butterfly valve, because at that time is in the whole company joint repair stage, the schedule is tight, heavy task, the sub-field requirements of the time is urgent. The Ministry of Supplies handled the project according to the urgency, and did not negotiate the bid in accordance with the company's collective business negotiation system. Afterwards, the material supply department made up the relevant bidding procedures in a timely manner.
4, the material material management system to check the implementation. We check the establishment of a sound management system related to the procurement of equipment and materials, check whether the management system is perfect, check whether the contract is standardized, and whether there is any incorruptible behavior of the relevant staff.
After statistical analysis, from January to October, the procurement of equipment and materials bidding and business negotiations*** counted 47 times, signed 47 contracts, saving the company 15.976 million yuan in procurement costs. Equipment overhaul, technical reform bidding and business negotiations *** 58, signed 58 contracts, saving 745,000 yuan for the company.
Four, monitoring recommendations:
1, the Ministry of Materials and Supply to standardize the implementation of the "bargaining collective business negotiation implementation rules", the procurement of lesser amounts of materials must be in accordance with the relevant provisions.
2, to learn to master the management system as a prerequisite to improve the implementation of the Department of personnel to study the relevant management system, to ensure that the work of the institutionalization and standardization.
3, to further improve the urgent work procedures, to strengthen the company's material procurement bidding management system to improve the understanding and conscientiousness of the work in strict accordance with the system. Continuously strengthen the integrity of the department personnel construction, strictly prevent and eliminate the occurrence of improper trading behavior.
V. Rectification and Improvement
Under the supervision of the performance monitoring and inspection team, the functional departments have seriously carried out rectification in response to the comments made and the existing problems.
1, Material Supply Department, Equipment Department seriously organize departmental personnel to learn the relevant management system, and constantly improve the system implementation of management personnel.
2, the Ministry of Materials and Supply, the Ministry of Equipment, the relevant management system of the department has been sorted out, the development and revision of a number of management systems. Material Supply Department revised and improved the relevant management system 10, 15 departmental job standards, Equipment Department revised and improved the power production contracting project management system.
3, through the continuous improvement of the construction of the system, the continuous standardization of the work procedures of the management personnel, plug the management loopholes, improve the management personnel to strictly implement the management system of procurement of equipment and materials consciously, to prevent and eliminate the occurrence of improper trading behavior