Negotiation meeting minutes classic

On the negotiation meeting minutes classic template 7

Minutes of the meeting is based on the purpose of the meeting, the agenda, the relevant documents, minutes of the meeting, as well as the material provided by the people who attended the meeting reported to the meeting, with accurate and concise language, general and comprehensive reflection of the meeting overview and key points of a document. The following is a classic template of negotiation meeting minutes I organized for you 7, I hope it can help you!

On the negotiation meeting minutes of the classic template chapter 1

Time: August 26, 20__ 9:00 a.m.

Location: Mafang Township People's Government, third floor conference room

Moderator: Zhou Gaoyou (Mayor)

Participants: Cao Ziyi (Deputy Secretary of the Party Committee, Chairman of the People's Congress) Cao Ling (Deputy Secretary of the Party Committee, Secretary of the Commission for Discipline Inspection) Zhang Daoyuan (Party Committee member, Secretary of the Political and Legal Committee) Liu Tianhe (Deputy Branch cadres, village leaders of the village of Bai Nai) Zhang Qingfu (Bai Nai village branch secretary), Xiong Jian (Director of the land) Shen Shiming (village building station) Li Daoyu (mass representatives) Liu Dunrong (mass representatives) Liu Dunxue (mass representatives) Wu Hao (Hubei Yinzu Ancient Architecture and Landscape Architecture Engineering Company Limited) Lv Shihua (generous technology) Horticultural farm) Huang Anshun (Guizhou Zhonglong civil engineering labor services Co., Ltd.) Li Longzhong (Guizhou Qizhong traffic construction engineering Co., Ltd.)

Record: Luo Bing

The meeting:

a. The competitive negotiation is carried out strictly in accordance with the principle of "fairness, impartiality and openness" by the town of Cao Ling, secretary of the Discipline Inspection Commission and three representatives of the masses throughout the supervision, to ensure that the results of the competitive negotiations objective, fair and true.

Second, at the meeting, the contractors involved in this competitive negotiation qualification review, and by the bid evaluation team through similar project performance, design program evaluation and bidding price of three elements of the unit for a comprehensive score, the final 'score results for: generous science and technology horticultural field 99.99 points; Hubei Yinzu ancient gardening engineering limited company 95.95 points; Guizhou zhonglong Civil engineering labor services limited company 91. 77 points; Guizhou qi bell traffic construction engineering limited company 91. 47 points. The big square science and technology horticultural farm with 99. 99 points honored first, become the first successful bidder of this project.

Third, in order to ensure that the project can be carried out in an orderly manner to ensure the quality and quantity, the successful bidder should be paid to the owner of the total project price of 10% as a deposit, to be returned to the completion of the project after acceptance of a one-time interest-free.

Fourth, if the first successful bidder abstained, automatically according to the current scoring ranking for replacement.

On the negotiation of the minutes of the classic template Chapter 2

Invitation to bid No.: Content:

Date: January, Location:

Participants: Party A:

The two sides clarified and negotiated on the scope of the work of the project, the service standards, acceptance procedures, the contract price and other content

2, the two sides on the scope of repair works, construction technology requirements and quality standards agreed.

3, the duration of the project: from the date of signing the contract to 40 days after the date of signing the contract

4, the quality of the project warranty period of 12 months.

5, the contract price: the contract to the actual amount of work for settlement, the settlement amount shall not exceed the total cost of 10,000 yuan.

6, payment: the contractor confirms the completion of the settlement report within 7 days from the date of the contractor to pay the contractor 95% of the total price of the completed project settlement . The remaining 5% as the project warranty, one year after no project quality problems returned.

Party A: Bohai Petroleum Property Management Company Party B: Tianjin Binhai Yanfa Construction and Decoration Engineering Co. Technician:

Business Person:

Classic Template for Negotiation Minutes Part 3

Negotiation Time: __ June 21

Negotiation Venue: E Hotel

Negotiation Time: __ June 21

Negotiation Venue: E Hotel<

Negotiation parties: united media (party A)

camden football club (party B)

Negotiators: party A:

party B:

Negotiation content: united media and camden football club negotiation cooperation

Party A chief: Good morning, Cheng manager, nice to see you.

The team manager: Hello, Mr. Liu.

A chief: see the recent reports, this year you again in the European Cup achieved very good results, congratulations. I hope you will create a higher record in the future.

Team manager: where where, are the result of the efforts of the players, and, our players are quite responsible, will always be to the highest honor challenge.

A chief: I believe that you will be successful. Well, now let's start our topic today. Before this, we have understood the basic situation of your club, know that this year, your team in the European Cup to achieve a quarter of the final qualification, the strength is quite strong, there is a very good prospect for development. Therefore, we are willing to cooperate with your team, for you to do a variety of special reports.

Team Manager: Thank you very much, it's an honor for our whole team.

Chief of Party A: Where, Mr. Cheng is modest. Our company after many considerations, decided to fund 30 million pounds to buy your team four years of sponsorship rights, the specific situation is to pay 7.5 million pounds in June each year, if encountered in our company's financial turnover difficulties, can be postponed for one month to pay. Moreover, since our company has higher requirements for the grade, if your team is downgraded during this period, this sponsorship agreement will be renegotiated. On the other hand, if your team wins the European Cup, we will increase the sponsorship fee by 10 million pounds, what do you think? Team Manager: Mr. Liu, don't worry, our team's ability is there for all to ****, the players have been working hard, we can guarantee your side's grade requirements, so I'm afraid the price of thirty million pounds is not too reasonable. Our team is asking for a contract value of £40 million with no strings attached. Of this, £20 million is payable in the first year as we need this money to expand the seating capacity of the ground. The total value of the contract is based on our previous sponsorship deal, the valuation of the team and the current general soccer market. And we think the value is quite worthwhile in terms of our current profile and recognition.

Chief A: Well, as far as our understanding of the soccer market is concerned, this price is very appropriate for a team that has won the European Cup, however, your team, although it has achieved quite a lot at the moment and has a very good development prospect, after all, it hasn't won a European Cup yet, so we still insist on a sponsorship fee of 30 million pounds. Moreover, our side has also said that as long as you achieve the championship, we will increase the sponsorship fee by 10 million pounds.

Team manager: please give us a little time to think about it. Allow our staff to discuss it 。。。。。 After discussion, we reject this additional condition. Our team's estimated sponsorship fee is £40 million, a quarter of which, if additional conditions are attached, will affect our financial policy decisions. We can take a step back and reduce the total value of the contract to 38 million pounds, taking into account the flow of funds from your side and our expansion needs, the payment of 15 million pounds in the first year will be sufficient. This is already our minimum bottom line.

Chief of Party A: Seeing that your party is so sincere in cooperation, then we should also be your party's request to increase the sponsorship fee of five million pounds, that is, thirty-five million pounds. At the same time, agree to the terms of your side to pay 15 million pounds in the first year, but the terms of payment of the balance of the payment is decided by us, how about paying at the expiration of the contract?

Team Manager: According to our team's revenue and expenditure, the total value of the contract is less than 38 million can not meet the needs of the team, can not guarantee the interests of the players and the club, which will seriously affect the long-term development of our team. In addition, the conditions of payment of the balance of the due date, we can not accept, the team's flow of funds affects the player's salary, the cost of various competitions, the payment of player training costs, the due date of payment there is no possibility of acceptance, the balance must be paid in the back of the average of three years.

Chief A: Well, we thought about it, £ 38 million is also acceptable, the balance payment conditions can also be, just, we hope you accept the conditions. In the stadium around the hanging of four giant posters to publicize our company, and in all the stadium entrances inserted marked with the logo of my company's flag, the main stand should be marked "The United Media Stand" at the same time all the players' shirts to be printed on my company's logo; the club team's clothing using my company blue background The club's team shirts will have our logo on them; the club's team shirts will have our blue background; the team's two main players will be given at least 25 days of publicity per year, and the other players will be given 15 days. In addition, at the end of each game, to our company to carry out a certain amount of publicity. Club team as a whole for publicity no less than 10 times a year.

Team Manager:

Chief of Party A:

Team Manager:

On the negotiation of the minutes of the meeting of the classic template chapter 4

Meeting subject: __ business hall expansion of the housing lease

Meeting time: April 18, 20__

Meeting Place: __ Company 5 floor small conference room

Host: Lu Jie (B)

Recorder: Fu Peng (B)

Negotiation between the two sides:

Lessor (Party A):

Lu Wangda, Li Ming

Lessees (B):

Negotiation of the meeting:

A, Party A, the __ Company 5 floor small conference room

Negotiation of the meeting:

First, Party A Statement of opinion: Party A will Xiaochang County, Jingshui Town, Jingshui Avenue, No. 225, four door stalls (210 square meters) rented to Party B; four door stalls annual rent of 280,000 yuan, the subsequent rent annual increment of 10%, the lease period of five years, and require the United States to assume part of the original tenant renovation losses and relocation costs.

Second, party B statement: because of the surrounding single door stall (40-50 square feet) rent is generally 50,000 yuan (excluding taxes) up and down, our company believes that we should refer to this market, asking the rent down to a single door stall annual rent of 60,000 yuan and the party to provide tax stamps, the annual rental increase of 6% is appropriate; due to the original tenant to withdraw from the renovation losses caused by the loss of and relocation costs, Unicom did not accept to bear the customary.

Third, A and B **** the same opinion:

After many rounds of frank consultation between A and B, reached the following agreement:

1. housing rent is settled on an annual basis, from 2014.6.1 to 2014.12.31 rent of two million yuan (lowercase 200,000 yuan), from 2015.1.1 to 2015.12.31 rent of two million yuan (lowercase 200,000 yuan). The rent is two hundred and fifty thousand nine hundred and twenty two dollars (lower case 259200 yuan), and the rent in the next three years will be increased by 8% of the base of the previous year;

2. Any other disputes arising from the withdrawal of the original tenant will be dealt with by Party A on its own, and Party B will not be responsible for it;

3. Party A is required to hand over the room on time, which shall not affect the renovation of Party B. If Party A fails to hand over the room in time, it shall not influence Party B to enter into the decoration of the room. If Party A can't hand over the room in time, Party B should be compensated according to twice the daily rent.

Fourth, the negotiation minutes as an annex to the contract, and the contract has the same legal effect.

Signature of party A:

Signature of party B:

Classic template of negotiation minutes Article 5

Time: July 26, 20__

Place: conference room on the second floor of the company's office building

Host: __

Participants: members of the restructuring team

Recorder: __

Content of the meeting:

This meeting is the first restructuring work conference held after the adjustment of the company's leadership team. The meeting briefed on the company's restructuring research and made arrangements for the next step.

First, the meeting first informed the original group company directly under the unit - ___ Survey and Design Institute restructuring.

The meeting concluded that ___ Survey and Design Institute restructuring began in 20__, lasted 2 years, in September 20__ officially listed, which has a lot of **** with my company. At present, the retired retired personnel treatment is the company's restructuring of the biggest constraints, we have to learn from the ___ Survey and Design Institute of the placement of such personnel, and actively strive for the support of the Group and the construction of the company's policy concessions, to properly solve this problem.

Second, the meeting decided to strengthen the company's internal management.

With the restructuring as an opportunity to carry out their own refining, and constantly improve the ability of enterprises to survive in the market.

Third, the meeting decided to further increase the cleanup of assets.

To be in the previous assets clearance 'based on the deep level of refinement of the cleanup, listed in detail. For the more difficult to deal with to obtain a legal basis, justified to deal with. The meeting made specific work requirements to the relevant ministries and departments on related matters:

1. The meeting instructed the Finance Department to complete the following tasks:

(1) In the principle of "easy before difficult, near before far", clean up the accounts receivable and bad and dead accounts as soon as possible. The ___ is responsible for coordinating the cleanup work among departments and offices.

(2) Drawing bad debt reserve.

(3) Improve the basic information of provisional construction.

(4) Clean up long-term investments and improve related procedures.

(5) Clean up unfinished construction.

2. The meeting instructed the Human Resources Department to complete the following tasks:

(1) Conduct a mapping of the situation of personnel to be assigned.

(2) To carry out the collection of information on the age of retired and retired personnel and the number of years they have worked in the enterprise.

3. The meeting instructed the Asset Management Department to complete the following tasks:

(1) Further increase the cleanup of equipment. There are inventory difficulties in the implementation of the equipment "a report" system, to do a discussion, to speed up the clean-up of off-book equipment and legacy issues.

(2) further property cleanup.

4. The meeting charged the Ministry of Business Planning to complete the following tasks:

(1) Accelerate the settlement of subcontracts. Requirements for project-by-project cleanup, such as problems with the project being cleaned up immediately transferred to the next project to continue to clean up.

(2) Clean up receivables.

5. The meeting instructed the General Office to complete the following tasks:

(1) Clean up office equipment and office supplies.

(2) Empty the west garage by July 5th.

Fourth, the meeting decided to clean up the bank account of the outbound project.

The bank account of the foreign project shall be canceled simultaneously with the withdrawal of the project department. All the construction personnel of the project department are all evacuated as the withdrawal of the project department. Can not be canceled for the time being the foreign bank account, in principle, a small balance (less than 100 yuan) can be left. The meeting instructed the Ministry of Finance to prepare a "notice of liquidation of bank accounts of foreign projects".

The meeting called for the convening of various types and levels of personnel seminars on the restructuring of the work of the majority of employees to seek advice and opinions.

On the negotiation meeting minutes of the classic template Part 6

Time: September 18, 20__.

Place: __

Participants: __

Wanba Village: __

Construction companies: __

The meeting was chaired by Comrade Gao Biyu, Village Director, and Liu Dairong, Village Clerk, served as the minutes of the meeting.

Agenda:

Liaochang Township, Wanba Village style shaping project invitation for bidding and negotiation than the election negotiations. In order to accelerate the pace of village-level public welfare and infrastructure construction, increase the strength of the comprehensive management of urban and rural environments, in accordance with the "Mingshan County, village-level public welfare construction of a financial subsidies for the implementation of the pilot program" of the relevant requirements of the village of Wanba Village in the village territory of the implementation of the project of shaping the appearance of the project, the project by the owner side of their own purchase of cement, sand and gravel, vase columns and green trees, etc., the construction side is responsible for the construction of the construction, the package does not include the materials, the project Single package price (including taxes).

In order to speed up the construction speed of the style shaping project, Liaochang Township Wanba Village in September 10, 20__ to September 17, 20__ on the project to invite bids than the selection of the program was open publicity, introduced the project's relevant circumstances and registration requirements. Village Committee on September 17, 20__ on the deadline for registration of the relevant enterprises to verify, after verification of the Wangu Township Shahe Village Liu Shuqiong, Liao field village of Wanba Village Zheng Shuhua, Wu Changsheng and other three enterprises to register, according to the relevant provisions of the state and the village of Wanba style shaping project project leading group opinion of the project to take the form of invitation to bidding than selection to determine the construction unit.

When inviting construction companies to negotiate, while the owner invited representatives of the parties concerned and the person in charge to the meeting to supervise. In the bidding negotiation, the Village Council to the construction company introduced the basic situation of the project, the amount of work and construction of the specific requirements of the project, the project point a wide range of sub-projects are more, the construction of decentralized. Participate in the bidding of the three companies according to the above conditions, the offer provided by the project and the construction organization plan only Wangu Township Shahe Village Liu Shuqiong meet the conditions.

The Liaochang Township, Wanba Village style shaping project project evaluation committee of the enterprise to provide engineering quotations, construction organization program evaluation unanimously agreed that: Wangu Township, Shaxiang Village, Liu Shujiong engineering quotations and construction organization program in line with the actual, in principle, determined by the Wangu Township, Shaxiang Village, Liu Shujiong for the construction of the construction of the project construction unit, the result will be publicized for three days after the issuance of a notice of award. Attachment: Liu Shujiong engineering quotes: engineering single package price (including taxes) were: vase post fence 50 yuan / m, *** 3500 meters flower platform; flower platform (pool) construction 27. 8 yuan / square meter (including filling, planting trees), *** 1350 square meters; yard dam and entry road hardening 25 yuan / square meter, *** 2350 square meters. Total contracted labor price of 271260 yuan, this price includes taxes.

On the negotiation of the minutes of the meeting of the classic template Chapter 7

________________________ Limited Minutes of the meeting

Issue 20__ year

Document No.

Subject of the meeting: ______________ Contract Negotiation

Meeting Time: April 28, 20__

Meeting Host: ____________

Organizer:

Main Contents:

On April 28, 20__, at __________, in relation to the matter concerning the project of the natural gas utilization project of the City of ____ under the Beijing-Guangzhou Railway. Company and ________ Architectural Survey and Design Institute ____ Branch (hereinafter referred to as the Design Institute) to discuss matters relating to the general contracting of the crossing project.

The meeting was attended by ______________

At the meeting, first of all, the Design Institute made a presentation on the construction design, project cost and general contracting offer, and the Company and the Design Institute negotiated on the design scheme and general contracting cost, and the meeting reached the following matters:

1. For all the fees involved in the project cost, the Design Institute shall provide the Company with the corresponding supporting documents on the fee standard. Charging standard supporting documents.

2, the payment of supervision costs in the project, determined by the general contractor to pay.

3. Considering the connection of the works on both sides of the railroad, the design institute is requested to complete the temporary requisition map as soon as possible and submit it to the company.

4, due to the top of the culvert is longer, construction and installation costs are higher, it is recommended that the design institute to further with the railroad management to implement the possibility of shortening the length of the culvert, saving project investment.

5, about the departure well, receiving well and both sides of the pipeline laying, construction technology coordination issues.

6, about the construction of right-of-way, please design institute as soon as possible to do a few more programs, reported to the company.

7, the preliminary determination of the total contracting costs (including design, construction, supervision, excluding right-of-way) does not exceed ________ million yuan, equivalent to 82,200 yuan / cross-length meter, due to individual cost calculation based on the problem, it is recommended that the confirmation of the fee documents, and then again for negotiation.