Warehouse meeting minutes model 6

Minutes of the meeting is a special kind of official documents, designed to record the transmission of the company's meeting situation and agreed matters. This article is a warehouse meeting minutes sample, for reference only.

Warehouse meeting minutes model:

Acceptance of the foundation branch project meeting minutes

Meeting time ___ year ___ month ___ at three o'clock in the afternoon

Meeting address: the project site office

Participating units and personnel:

Hunan Dadi Chinese Medicine Drinks Co., Ltd Guo Guowei Hu Bingkun

Yuanjiang City Architectural Design Institute Liu Jingan

Zhongyu Supervision Company Cao Zhen Guo Jia

Makongpu Construction Company Wu Yuexian

Municipal Construction Engineering Quality Supervision Station Sun Jianhua Huang Hui

The foundation and foundation division of the Dadi Traditional Chinese Medicine Warehouse Project started from August 18th 2010 to September 9th 2010, when the construction work began. Started on August 18, 2010 to September 10, 2010 completion, today the parties involved in the construction of the section acceptance. The meeting was presided over by Cao Zhen of Zongyu Supervision Company.

Cao Zhen: Just now we have viewed the project entity, but also reviewed the inspection information of the division of the project, and now ask the parties involved in the construction of the project foundations and foundations of the division of the quality of the assessment. First of all, please construction unit to introduce the construction and self-assessment.

Wu Yuexian (Muchuan Jianji): the earth's traditional Chinese medicine warehouse project construction area of 993 square meters, row frame structure. Independent foundation, the project started on August 18, 2010 to September 10, 2010 foundation completed. Base trench according to the design drawings and ground survey data, brazing data excavated in place and self-check qualified, by the ground survey, design, supervision, construction, quality supervision **** with the foundation bearing capacity, axis and geometric late inch acceptance. The hidden works such as column base tendons, column insertion tendons, floor beam tendons, floor ring beam tendons, etc. were constructed after checking by relevant parties. Before the concrete construction, sand and stone tests and concrete ratio were done respectively. All raw materials are tested before use, and witness samples of raw materials and concrete are taken according to regulations. During the whole construction process of this division project, we constructed the project in strict accordance with the design drawings, design changes, construction acceptance norms, mandatory standards for engineering construction and Unified Standard for Quality Acceptance of Building Construction (GB50300-2001). Relevant technical information to achieve a true, synchronized, complete, standardized, self-inspection of the six sub-projects **** 54 test batch, all test batches are qualified. Comprehensive construction, information and entity self-inspection, in accordance with the "Unified Standard for Quality Acceptance of Building Construction" (GB50300-2001), the division of self-assessment as a qualified division.

Liu Jing'an (geological survey unit): the foundation form of the project adopts independent column foundation, all pits are excavated to the holding layer, and the holding layer reaches the bearing capacity value provided by the geological survey report, and meets the design requirements. The embedment depth and geometric dimensions are in accordance with the design and specification. Agreed to assess the division as a qualified division, agreed to acceptance.

Wang Huizhao (design): the foundation division of the project, the site inspection, the construction unit in strict accordance with the design drawings, design changes and design requirements for construction, to meet the design requirements, agreed that the division is qualified division, agreed acceptance.

Cao Zhen (Supervisor): The foundation holding layer of this project is clay, using independent column base. Independent column base concrete, ring beam floor beam concrete are C25 reinforced concrete. During the construction process, in strict accordance with the supervision specifications and the supervision procedures, the raw materials, components and equipment used in the project were carefully inspected and signed, and all raw materials were tested before use. The construction of the key parts of the project, we are the implementation of side supervision, the construction of other parts of the project to do a regular or irregular inspection, once the problem is found, immediate rectification. Through the *** with the cooperation of all parties involved, the quality of the division of the project is guaranteed. We have inspected the sub-projects of the engineering entity, which are in line with the design requirements and meet the relevant specifications. Technical information is true and complete, according to the "Unified Standard for Quality Acceptance of Building Construction" (GB50300-2001), the division is assessed as a qualified division, agree to acceptance.

Zhou Lifei (Planning Unit): the project according to the planning map put the sample, in line with the planning design requirements, agreed to enter the decorative part of the construction.

Chen Yonghong (Archives): information please synchronize the perfect.

Guo Guowei: in the construction of the division of the project, survey, design, supervision, construction and other units of management is very responsible, the service is very in place, in the cooperation of all parties the division of the project to ensure the quality and quantity of the completion of the project on time, our company is very satisfied. The division of the foundation groove, reinforcement and other hidden works by the relevant parties to check and pass before the next step in the construction process, all raw materials are first tested and then used, the entity quality is good, complete information, agreed to assess as a qualified division, agreed to acceptance.

Sun Jianhua (Municipal Quality Supervision Station): the division of the pit bottom soil condition is good, the holding layer to meet the ground investigation and design requirements, geometric dimensions of the sampling qualified. Raw material information is complete, are first tested and then used, the supervision party in accordance with the provisions of the raw materials and concrete test blocks to do witness sampling, test are qualified. Pile foundation, concrete strength and reinforcement protective layer test are qualified. Frame columns, beams and slab reinforcement were sampled and conformed to the design requirements. All concealed works are checked and approved by relevant parties before entering the next step. The civilized construction on site is poor. The project entity is basically no problem, the technical information is basically complete, as the project responsible for the quality inspector, agreed that the division is assessed as a qualified division, agreed to acceptance.

Huang Hui (Municipal Quality Supervision Station): All parties involved in the construction can conscientiously fulfill their responsibilities. Test batch division meets the requirements. Technical information is basically complete, as the project quality supervisor, agreed that the division is assessed as a qualified division, agreed acceptance.

Signature of participants:

Warehouse meeting minutes model article:

Meeting content:

The meeting was chaired by the superintendent, the A side of Diao manager summarized speech.

At the beginning of the meeting, Dongyu construction company technical director Shang Gong: report on the implementation of the recent work plan and the current facing the need to solve the problem and the next week's construction plan arrangements.

At present, the steel structure warehouse constructed by Dongyu Construction Company has basically completed the shale backfill work, and the quality has basically reached the stipulated requirements, and the recent weather is getting better and better, and the site has reached the construction requirements. Today contact excavator into the site to excavate the foundation earth.

Supervisor Meng Gong: mainly emphasize the quality issues and the next process of supervision of the delivery. Emphasis on the importance of supervision procedures, hoping that Dongyu strictly in accordance with the requirements of the construction specifications to control the quality of the project, to put an end to the occurrence of some quality problems, to strengthen internal coordination and organization and management, to mobilize all the enthusiasm of the workers, and to do a good job in engineering and construction. The next step is to pour the concrete bedding and independent foundation, the construction side is required to strictly control the quality in accordance with the construction program, and the C10 concrete bedding in the design is changed to C15. Now the construction of the independent foundation reinforcement according to the procedures of the first self-test qualified and then reported for inspection before the next process, do a good job of measuring the concrete ratio, vibration and compactness.

Supervisor Ma: reiterated to emphasize that we will strictly in accordance with the supervision procedures to monitor the construction, good quality. Through the previous groove treatment, part of the graded gravel bedding and C15 concrete bedding construction, found that there are still some problems, the construction unit should pay great attention to strengthen the quality management, the following mainly focus on six aspects of the problem:

(1) Reiterated to grasp the inspection of the report before the concrete pouring.

(2) Concrete bedding elevation control is not strict and laying operation is not standardized.

(3) Strict implementation of the inspection procedures, standardized operation and construction, the project to do a good job of self-inspection, mutual inspection, process handover inspection ADDRESS: Linyi City, Yimeng Road, No. 136, eighth floor TEL: 0539-8202135 FA_: 0539-8211915 POSTCODE: 276002

Warehouse meeting minutes example strong> Warehouse meeting minutes sample article three:

In fact, this meeting has long been planned, why today suddenly called everyone to a meeting? It is because some small problems are not allowed to expand again and affect the whole group. We have to pay attention to the detailed places.

1, to reiterate the three warehouses (packaging warehouse, hardware warehouse, insulated wood grain warehouse) work arrangements. Now that the packaging warehouse, hardware warehouse, insulated wood grain warehouse has canceled the evening shift, you several warehouse managers to do a good job of the daily work. Why have the hours not been reduced? Although we have canceled the night shift, the production plant is a two-shift system, and it is most likely that the material will come to be collected at the time of shift handover. You must stick to your positions during this time. Now you have three off-duty times, if you are off-duty at 17:30, you have to do the handover procedures, and if you are off-duty at 19:30, you have to be at your post before you go off-duty, because this is the handover time of the production workshop, and there may be a lot of collaterals. This is why I arranged for one of the warehousemen to stay off duty until 20:00. Let's not jeopardize production by eliminating the night shift.

2. Emphasize the vacation system. As the end of the month to inventory, in principle, the first and the end of the month do not rest, usually rest to write a leave, but also can call me first after the leave to make up. You should communicate with each other before taking a break to avoid taking a break at the same time. I will arrange for someone to cover the shift when the leave slip reaches me. When handing over a shift, both parties should explain some details or precautions of the work. If you leave your post during working hours due to non-working factors, you must tell me, so that I can properly organize the work; in addition, if you want to leave the warehouse to collect goods outside, you must indicate on the small blackboard where you are going, and approximately when to come back. If it is found that there is AWOL, the implementation of the assessment points system. If repeated, repeated repeated offenses, the implementation of transfer processing. Because we are a group, we have to be united, so that we can do a good job, and I do not allow a person to affect the whole group, and work progress.

3, work attitude. Usually if there is any problem in the work, to reflect to me in time. If there are any suggestions or comments on the work, you can talk to me, it is best to reflect in writing, to avoid the possibility of forgetting because of too busy. in March I played an application to give Chen Cong 100 yuan reward. Although I came to the time is not long, only two months over two days, but each of you is how to do things, I heart is very clear. It's not that those who don't have rewards are not doing well. In fact, our group in general is still good. In these two months of contact, the most opportunities to communicate with Chen Cong. In the process of communication, I also found a lot of problems, but after I put forward, Chen Cong will also put forward a lot of suggestions to me to improve and methods, it can be said that we are progressing together, in the process of communication about the work of some of the loopholes slowly filled. So this 100 dollars is also an encouragement to Chen Cong. In fact, as long as you know how to identify problems and then find ways to solve them, this is also a kind of progress. Speaking of which, I am most sorry for the aluminum bar warehouse and aluminum ingot warehouse, which I usually have very few opportunities to communicate with them. Their working environment is the worst among several warehouses. However, I am most assured of their work. I will take more time to communicate with them in the future.

4, the warehouseman must lock the door when leaving the post, especially the powder warehouse. In addition, the lights must be turned off after work, last night Mr. M found that the receiving warehouse and hardware warehouse did not turn off the lights.

5, powder warehouse in the evening shift when the material, if there are abnormalities, for example, the normal procedure is to send the old powder and then send the new powder, if the workshop for fear of affecting the quality of the old powder and do not dare to receive or other reasons, you must reflect with me, you can write down the next day to me the report, and then I communicate with the director of the workshop. In addition, do a good job in the evening shift of other warehouses to collect material records.

This month's tasks in the warehouse

1, receiving warehouse: the receipt of goods should be clear specifications, models, checklist, billing should also be consistent. Strictly according to the requisition number of goods. After receiving the goods, timely transfer to other warehouses, and the documents must be accompanied by the same goods. If the delivered materials are immediately taken away, the person who receives the materials must sign on the delivery note, so that the warehouses can be issued accordingly. The workshop materials for registration (mainly packaging and chemical), in order to facilitate the other warehouseman to check and issue a receipt.

2, packaging warehouse: As most of the packaging materials are in the receiving warehouse or the scene, after receiving the delivery note, to proofread the goods, put the second barrier, found that the problem is immediately raised and resolved. At present, there is no problem with the inventory transfers, the next thing is to match the account, there is a good tracking of goods to be handled by the collaterals, and make a good record.

3, powder chemical warehouse: entry orders according to the powder code input, tracking the 'force' and 'love Yue' powder collaterals, make a good record. Whether and how to amend the previous code to be studied and then decided.

4, hardware, insulated wood grain warehouse: good marking, different products to be disposed of (including accounted for unavailable, unaccounted for available or unaccounted for unavailable materials) to make a different labeling or marking. (Such as with different colors or charts), warehousing orders and material receipt to be issued in a timely manner to avoid omissions, resulting in the account does not match, but also affects the review of requisitions need to be checked when the amount of inventory.

5, aluminum ingot warehouse, aluminum bar warehouse: do a good job of marking at the same time, as far as possible in accordance with the specifications of the large and small regular placement. In addition, the long bar placed in the area of the pad bar in a timely manner to organize, as well as in the warehouse road waste and pressure residue material in a timely manner to pick up, do not help us clean the warehouse cleaner inconvenience.

6, mold warehouse: do a good job of the new mold, issued outside the processing mold receipt, issue work, as well as the preparation of mold plans.

Afterword:

If you usually have any problems need to assist in solving, please take the initiative to put forward. Let us work together to do a good job in the department, so that the warehouse to a new look! Our goal is: to reflect the standardization of warehouse procedures, material visualization, data clarity and solvability. Thank you all!!!

Warehouse Meeting Minutes Sample Article 4:

Meeting Time: 20__ Year ___ Month ___ Day 14:00

Meeting Place: the company's General Manager's Office

Presiding Officer: __

Participants: all employees

Record Keeper: __

Meeting Topic: on the operation of the company and its market development issues and staff job allocation, the current major issues, etc.

Meeting content:

At 2:00 p.m. on ___, 20___, a meeting of all the staff was held in the company's General Manager's Office, the company's general manager ___ and the deputy general manager ___ attended the meeting. The main agenda of the meeting: ___ mainly talked about the establishment of the company's operations, and emphasized the allocation of staff positions and the current major issues, ___ mainly on the need to be careful when sending information or reports to customers, must determine the accuracy of the information, reports; and CNAS application issues, employees need to be trained.

First, the establishment of the company and its operation (__ )

1, March this year, the shareholders to discuss the preparation of the company's affairs, the rapid establishment of the April. From the current point of view, the single development are still good, but still need to continue to expand the market business, the establishment of a strong marketing department is also a priority; colleagues get along with each other is also relatively cordial, mutual friction is almost, the work coordinated more smoothly; recently the company has done a large single main ___ Limited, the cooperation has been reached agreement, so we must do our best to do a good job in this case, both the case, we must do a good job of things. Case, we must do a good job of things, encounter problems to find a solution path, rather than find the problem but do not solve it; on the report on the issue of the need to pay attention to its accuracy and professionalism, the report is my company's products, is the company's facade, the low-level error should never occur, for the terminology related to the technical staff must be more discretion to ensure that there is no error can be issued, of course, all of these are in the process of continuous learning, so you can look at the ___. Learning, so you can look at ___, ___ issued some reports in English and Chinese;

2, the company's initial intention to establish because of the prospects for this industry is relatively good, and in the company slowly into the right track at the same time, the fight to become a publicly traded company, so that the development of the company will be of great benefit; in the work of the hope that all employees to the basic duties of the position to do a good job for the ___ put forward the problem, the company will be resolved! The company is expected in October will be equipped with computers and their corresponding equipment, for the number of samples of the number of figures have been let ___ procurement, the future we have any questions or suggestions can be put forward, as to whether to adopt based on the leadership of the instructions.

Second, the employee job division of labor description

1, the Ministry of General: the Ministry of General ___ a person, mainly responsible for personnel, wages, assessment, finance, contract costing, the company's daily trivial matters, such as the need to hope that we *** with the collaboration to complete;

2, the Ministry of Marketing:? __ As a business assistant, to assist the ___ total sales business, for its recent performance is very good, for the safety of the laboratory is more concerned about the issue of doing things also responsible; in addition to market business development, but also responsible for outsourcing cases, in the reliability of the analysis of many years of experience, the other personnel do not understand, you can consult the Zhouchao, like more of its learning; in the report audit, need to be carefully audited, especially the technical aspects of the problem, need to be more careful! In the report review, need to carefully review, especially the technical aspects of the problem, need to be more cautious, to ensure that the report is issued;? __ As a sales assistant in the marketing department, mainly responsible for the laboratory assignment process, contract review process, sample receiving and sending and other issues, and to do the corresponding registration, to be careful and thorough, electronic capacitance, physical experiment need to continue to learn, do not know can ask the ___ total advice, at the same time in the audit report, can not be due to the final auditor ___ total audit and some slack audit content;

3、Technical Department: __ Mainly responsible for the laboratory machinery and equipment. __ Mainly responsible for laboratory machinery and equipment operation, maintenance, management, storage, etc., for important things to be reported in a timely manner, you can contact the Ministry of __ or property department;? __ specializing in physical and chemical interviews, play their own corresponding specialties, the preparation of a good report, for professional translation, grammar and other aspects of the word need to continue to learn, there are reasonable suggestions can be put forward; __ responsible for the quality system in this regard, the future of the quality system. __ Responsible for the quality system in this regard, the future of the laboratory equipment increased, the need for its supervision and management of the laboratory operation process, in accordance with the corresponding standards or guide book to complete the experiment, the guidance of the application for CNAS ___ teacher to come over, we need to learn, there are problems need to report the situation in a timely manner.

Third, the current major issues

1, ___ equipment maintenance issues, ___ and the other party to maintain appropriate contact;

2, CNAS application, tomorrow to guide the application of the ___ teacher to come over, to give you training;

3, the market business development issues, the need for a great deal of effort, despite the more arduous and difficult, but the difficulties will be overcome. So for the single received, can not be because of the negligence of all the problems, in this regard, you need to be careful and conscientious to do things.

Finally, ___ said two points: 1, in the mail to the customer, information, reports, etc., must ensure that it is correct, so before this to be more careful; 2, tomorrow we have to training, so please put the two days of work organized.

Warehouse Meeting Minutes Model Article 5:

Time: 20__ Year _ Month _ Day

Location: Hefei University of Technology expert guest house meeting room

Participants:

Construction unit: Li diary, Hong Wei

Expert group: Cha Songting, Yang Xudong, Zhang Shihan Mr. Li Rizhi, Mr. Hong Wei

Expert group : Mr. Cha Songting, Mr. Yang Xudong, Mr. Zhang Shihan, Mr. Jiang Zewei, Mr. Yang Chengbin, Mr. Wang Buxian, Mr. Chen Wanli Design unit : Mr. David Wang

Survey unit : Mr. He Xing

Supervision unit : Mr. Wang Zhanghu, Mr. Deer Zhongshan, Mr. Lin Hui, Mr. Toh Hengqing, Mr. Wu Haiying

Construction unit : Mr. Wu Gaoquan, Mr. Zhou Shengping, Mr. Xiao Jiangping and Mr. Wang Hongzhi

The meeting was presided over by Mr. Hong, Chief of Infrastructure Department of Hefei University of Technology. First of all, Mr. Li, Chief of Infrastructure Department and Mr. Hong

briefly introduced the general situation of Yifu building, and explained the content and purpose of the meeting, due to the urgent requirement of the construction period, the university would like to exempt the static load test. Then, the design representative briefly explained the main points of pile foundation design and answered the questions raised by the experts, the pile foundation construction project manager introduced the construction progress, quality control measures and self-checking results, and the supervisor representative introduced the main points of pile foundation construction process tracking supervision and inspection report. On the basis of listening to the speeches of all parties and reviewing the relevant information (design drawings, investigation reports, supervision reports, construction records, etc.), the participating experts analyzed and argued comprehensively around the theme of the meeting and related issues, and achieved *** knowledge, which is summarized as follows. This summary can be used as one of the basis for pile foundation design and construction acceptance.

1 According to the structural characteristics of the "Yifu" building and the foundation conditions of the building site, the use of manually dug holes embedded rockfill piles

The design program is reasonable, and the design proposes to do a single-pile static loading test is responsible for the requirements of the project.

2. The main reasons for exempting the bored piles of "Shaw" building from static load test:

(1) The safety class of the pile foundation of the building is Grade II, and the code of practice for piling allows to determine the bearing capacity of a single pile according to the experience of the region.

(2) The ground condition of the pile foundation construction site is simple, plus the pile foundation construction unit has rich construction experience,

The supervisors are very serious and responsible, and the process quality check and acceptance are in place, so that the quality of pile foundation construction can be ensured.

(3) Hefei area has accumulated some similar pile foundation project static load test results, settlement observation of high-rise buildings

data and nearly 300 high-rise buildings practical experience, verified the similar pile end of the holding layer of the qpk is 6000kpa is safe and reliable, and the actual design of the project qpk is 5000kpa, so in terms of the single pile bearing capacity, the safety of the pile foundation is high.

(4) At present, there is a lack of high tonnage static load test equipment for pile foundation in our province, and the existing equipment can not simulate static load test of single pile to reach the stage of ultimate load, and the test result is lack of engineering significance, and at the same time, it needs more than 150,000 RMB testing fee and delay more than 45 days.

3 In view of the lack of comparative data between static load test and high strain dynamic test for similar pile foundation projects in Hefei area, the error of high strain test for single pile bearing capacity of this kind of piles is too large, it is recommended that high strain test for single pile bearing capacity should not be adopted in this project.

4 This project is a high-rise building with one column and one pile, and all 94 piles should be subjected to low strain testing. 5 In order to ensure the safety of the project, accumulate the observation data of regional pile settlement, and provide necessary basis for the project to achieve excellence, it is recommended to carry out the settlement observation, and require the unit with engineering measurement qualification to undertake the observation task, and at the same time, in order to ensure the completeness and reliability of the observation data, please ask the civil construction unit to try its best to do a good job in the protection of the observation point.

6 The expression of the design value of single pile bearing capacity in the description of pile foundation design drawings is not precise enough, and it is recommended that the design institute review the pile strength and load of the main pile types.

7 In view of the inadequacies of the investigation report, the survey institute is requested to revise and improve the report.

Finally, the design representative, Mr. Jun Wang, agreed with the experts to carry out formal settlement observation of the building.

Infrastructure Department of Hefei University of Technology

20__ Year ___ Month ___ Day

Warehouse Meeting Minutes Sample Article 6:

Time:

Place:

Attendees:

Topic of the meeting:

Content of the minutes:

This regular meeting was called by ___, chaired by ___, and recorded by ___. The whole meeting *** lasted for __ hours. The meeting listened to __ reports, studied and discussed __, deployed __ work, and the minutes are as follows:

The matters decided are as follows:

1. _______________.

2. _______________.

3. _______________.

4. _______________.

Attachment: __ Regular Meeting Priority Tasks Directive

__ _

__ Year __ Month ___

Cc: __, __, __, __, __,__, __

Attachment: __ Meeting Priority Tasks Directive

No.: Date:

No. Name of the task Responsible person Responsible department Co-ordinating department Deadline for completion Remarks

1

2

3

3

Tabulation: Audit: Approval:

The instructions are as follows: 1. Layout requirements: A4 paper, title in boldface type, text in small four-pointed imitation Sung font, line spacing of 25, and the page number is placed in the right side. 2. "__ will focus on the task instruction" form, just do the minutes of the meeting can be.

Warehouse Minutes Model 6 Related articles :

★ Warehouse Minutes Model 6

★ Warehouse Minutes Model 6(2)

★ Logistics Minutes Model 3

★ Symposium Minutes Model 6

★ Departmental Minutes

★ Office meeting minutes sample 6

★ Quality meeting minutes sample 6

★ Procurement meeting minutes sample 6

★ Commonly used minutes sample 3

★ Work meeting minutes sample 3