Construction safety management agreement content 7

Construction Safety Management Agreement Content 1

Party A: ______________ Party B: ______________

In order to strengthen the standardized management of the construction site, the implementation of the responsibility system for safe production work, to ensure that the safety, civilized construction, environmental protection and hygiene Work to achieve the desired goals. By the A and B sides of equal consultation, voluntarily signed this safety agreement, and *** with compliance.

First, the safety management objectives

1, to eliminate the occurrence of large and small accidents, the rate of rectification of hidden dangers must reach 100%;

2, must meet the standards of production safety inspection;

3, no major safety casualties.

Second, the responsibility of both parties

(a) Party A's responsibility

Responsible for Party B in the construction process of safe production, civilized construction, the use of labor to supervise, coordinate, inspect, the right to punishment. Violation of the project management system to exercise the right to financial penalties and dismissal.

(B) Party B's responsibility

1, strict implementation of safety and technical delivery. Strictly implement the quality of the process operating procedures, to ensure that the day of work is completed, the area of responsibility for the materials stacked neatly, environmental safety and clean.

2, the strict implementation of the project developed by the Department of production safety, civilized construction rules and regulations. Have the right to refuse unauthorized command, put an end to unauthorized operation. No personal injury, machinery, fire accidents.

3, when injured due to work violation, immediately report to the Party manager and the person in charge of the building number, and accept the Party personnel to investigate, 24 hours after the supplementary report, inadmissible. Outside the site, non-Party A arrangements for the operation, the accident, Party A inadmissible.

4. If Party B violates the agreement and causes an accident, it shall be fully responsible for the casualties and property losses.

Third, the specific requirements

1, to comply with the working hours, leave, not to leave the workplace.

2, love of work, high work enthusiasm, law-abiding, hard-working.

3, efforts to learn safety and technical knowledge, familiar with a variety of safety and technical measures, proficient in safety and technical operational requirements, familiar with the project department rules and regulations, management standards.

4, resolutely stop illegal operation, according to the rules. In case of danger, stop the operation and report immediately.

5, into the construction site must wear a good helmet, work at height must fasten the safety belt, must be familiar with the safety and technical operation procedures of this type of work.

6, actively participate in safety activities, conscientiously implement the safety delivery. Do not violate the rules of operation, obey the guidance of safety personnel. Do help each other and supervise each other in safety production. To newcomers to actively teach production safety knowledge. Maintain all safety equipment and protective gears, and do not dismantle or alter any safety technology facilities without authorization. To actively comment on unsafe work and have the right to refuse unauthorized instructions. Casualties and attempted accidents should be protected at the scene and reported immediately.

7, do not unauthorized operation of construction machinery, mechanical and electrical equipment used by others.

8, conscientiously implement measures to protect finished products, prohibit damage and pollution of finished products.

9, pay attention to hygiene, is strictly prohibited in the construction site with urine and feces.

10, the dormitory should be kept clean and orderly. Around the living area should be kept hygienic. Dirt and sewage, living garbage should be centralized piles of timely cleanup. Strictly prohibit the use of electric stoves, electric rice cookers and all electric heaters. It is prohibited to connect the power lines privately.

11, special operators must be licensed, and strictly comply with the relevant safety and technical regulations.

12, abide by the laws and regulations of the country, do not fight, brawl, gambling, hooliganism into the construction site before the operation, you must first hand over a copy of the ID card to the Ministry of Safety for the record, and accept the safety education, sign a safety agreement, or else not allowed to enter the site construction.

14, strict compliance with the construction quota, according to the contract, is strictly prohibited in the settlement of wages and unreasonable complaints and other phenomena.

Fourth, for one of the following cases, Party A to give a fine or make it stop working, the circumstances are particularly bad clear out of the construction site.

1, a serious violation of safety regulations, serious hidden accidents directly endanger the lives of others.

2, violation of rules and regulations more, after the education pointed out that do not change, causing accidents or affecting the safety of production evaluation, to achieve the standard.

3, unauthorized use of construction machinery, electric equipment used by others and cause accidents.

4, violation of labor discipline, illegal operation, brutal construction and non-compliance with rules and regulations.

V. This agreement on production safety in duplicate, each signed by both parties to take effect.

Party A: ____________ Party B (signature): ________

Project Manager: ________ Type of Work: ________ ID Card No.: ________

____ ____ ____ ____ ____ ____ ____ ____ ____

strong> Content of Construction Safety Management Agreement2

I. Name of Project: _______________

II. Purpose

In order to safeguard the ****same interests of A and B, to ensure the quality of construction and safe production, and to maintain good working order and sanitary environment of the construction site, after equal consultation between A and B, the two sides

Third, the content of the agreement

(a), Party A production safety management responsibility

1, Party A must strictly implement the national and provincial laws, regulations and norms and standards related to production safety, the development of the unit production safety regulations and operating procedures, the establishment of a sound safety management system, the implementation of the requirements of the safety and technical measures to ensure that the project construction and safety production inputs. The effective implementation of the project construction safety production investment.

2, Party A should provide Party B with the existing technical information required for construction.

3. The design documents provided by Party A should meet the safety and health requirements of construction workers.

4, Party A should be Party B construction site safety supervision and management work into the unit's safety system within the unified management, the development of production safety accident emergency rescue plan must have Party B construction safety content.

5, Party A shall not put forward Party B requirements that do not comply with the laws, regulations and mandatory standards of work safety, and shall not arbitrarily compress the contract period.

6, Party A shall provide rescue and medical facilities for Party B's injured workers.

(B), Party B's responsibility for production safety management

1, Party B shall establish a construction safety system, the implementation of construction safety job responsibility system, the implementation of production safety target management and standardization of construction site operations.

2, Party B should be the project leader by obtaining the appropriate licensing personnel, responsible for the production safety of mining projects, the implementation of production safety rules and regulations and operating procedures, to ensure the effective use of production safety inputs.

3, Party B shall designate the person in charge of on-site construction safety, and the number of safety supervisors shall meet the production requirements and supervise the whole process of on-site construction safety.

4, before the start of the project, adhere to the "one project, one measure, first reported measures after the construction" principle, approved by the competent authorities of Party B construction organization design, operating procedures, safety and technical measures must be reported to the Party for approval after the implementation.

5, Party B shall implement the labor production education and training system, strengthen the unit's production safety education and training of personnel, truthfully inform the workplace and the workplace of the existence of dangerous factors, preventive measures and emergency response to accidents, to ensure that employees are familiar with and strictly implement the relevant rules and regulations on production safety and safety regulations and procedures, to master the post of the safe operation of the skills, with the necessary safety precautions. Knowledge of safety precautions. The special operators shall be given special training by the relevant departments organized by the state, pass the examination and obtain the induction certificate before they are allowed to work on the job. The project department should establish the staff training file, and report to Zhonghe Coal Company and Supervision Company for record.

6, Party B according to their own needs to organize their employees to participate in the construction unit arranged by the safety education and training and other activities, and bear the relevant costs incurred.

7, Party B must participate in social insurance for work injuries in accordance with the law, and pay insurance premiums for its employees.

8, construction personnel must wear documents to enter the field, uniform work clothes, according to the provisions of the correct use of qualified safety protection tools, to prevent the occurrence of object strikes, falling accidents. Construction team safety protection equipment must be configured in place, the safety measures are effective, or not to start operations; construction unit must be the safety production license, project manager qualification certificate, special types of operating certificates in accordance with the requirements of the Party reported to the Department of Safety Supervision for the record.

9, Party B should conscientiously implement the provisions of Party A's safety management, strengthen safety management. If Party B violates the rules or Party A's management regulations, Party A has the right to stop Party B's work, resulting in certain consequences, Party B to pay full responsibility.

10, Party A has the right to carry out inspections at any time, the right to stop illegal operation, the right to violate the safety provisions of the act of punishment or order the construction team to stop work for rectification. The hidden safety hazards identified by Party A shall be rectified and completed within the specified period, and the rectification situation shall be promptly fed back to Party A in writing.

11, Party B shall sign a production safety management agreement with the third party operating in the same operation area or the same production system. If a safety accident occurs, the consequences are borne by the responsible party, and when both parties are responsible, they shall bear the corresponding responsibility in terms of the size of the responsibility.

12, in the event of a disaster, Party B personnel, materials, equipment, etc., should unconditionally obey the scheduling, the costs incurred, the accident is dealt with after a separate agreement.

13, strict implementation of the accident reporting system. Party B occurs safety production accidents, in strict accordance with the accident reporting procedures and requirements, in addition to reporting to the unit's higher departments, but also must be timely to the Zhonghe Coal Company report.

14, other outstanding matters to be resolved by the A and B parties.

(C), safety production management responsibility penalties

1, Party B won the bid, in the signing of the contract and safety agreement must pay 20 ~ 1 million yuan as a safety and quality deposit, the safety effect, the quality of the project as an important basis for acceptance of the project, due to the management responsibility of the outsourcing unit caused by the accidents, quality failures or violations of the relevant agreements in this agreement, in accordance with the provisions of the fines given. The fine is deducted from its safety and quality deposit.

2. Party B will subcontract or subcontract the contracted contract or subcontract or subcontract to a third party in any disguised form, and will be ordered to make corrections within a certain period of time and be fined 50,000 yuan.

3, Party B did not carry out, assess and sign the safety technology measures for construction personnel, ordered to make corrections within a period of time, and imposed a fine of 1000 yuan.

4. If Party A checks out that Party B arranges untrained employees to work in the well, it will give a fine of 5000 RMB/person.

5, Party B shall follow the requirements of the Special Provisions, there must be a management and technical personnel to lead the shift at the construction site every shift, and empty shifts are strictly prohibited. Found empty shift a fine of 500 yuan.

6, because of Party B management is not in place or because of illegal operation caused by Party B personnel casualties, the responsibility borne by Party B.

The occurrence of minor accidents, party B 20,000 yuan fine;

The occurrence of serious injuries and accidents above the second level of non-personal injury and death, party B to the project part of the person in charge of the management of the person in charge of the direct person in charge of the dismissal and termination of the labor contract, while giving party B a fine of 100,000 yuan / person;

1 death of one person in the responsibility of the accident, party B to give the project manager, the person in charge of the dismissal and demotion Disposition; at the same time give party B a fine of one million yuan / person.

For a death of 2 people or cumulative death of 2 people responsible for the accident, Party B to give Party B to terminate the construction contract;

6, Party B is responsible for the safety management of other personnel into its operating area, causing casualties to other people, the responsibility borne by Party B, the penalties are the same as Article 5.

7, due to Party A's management is not in place or due to illegal operation caused by Party B personnel casualties, the responsibility is borne by Party A, according to the implementation of the document Zong coal security 20xx1.

8, Party B management personnel and Party A management personnel have the responsibility and obligation to **** with the implementation of the various rewards and penalties stipulated in the document Zong coal security 20xx1.

(D), this agreement in two copies, Party A and Party B, each signing a copy, effective from the date of signing.

Party A (official seal) __________ Party B (official seal) __________

Party A's legal representative: __________ Party B's legal representative: __________

_____ year _____ month _____ day _____ year _____ month _____ day

Construction Safety Management Agreement 3

A:

B:

To ensure the smooth completion of the project and the physical and mental health of all workers, to strengthen the safety awareness of the various types of personnel, special safety agreement as follows:

A, all construction workers must ensure that the ID card is really in place and introduced to me through the I introduced to its specifics to fully understand, to ensure that no record of bad behavior and criminal suspicion. And is responsible for the supervision of their behavior.

Second, into the construction site operations must wear a good helmet, wear good personal protective equipment, two meters above the height of the work must be fastened with a safety belt.

Third, the site of a variety of protective facilities non-professionals are not allowed to dismantle, enter the construction area should be the first to check the environment in place to protect whether the effective, found unreliable to make a proper solution before entering the operation.

Fourth, the work is not allowed to wear slippers and slippery shoes with nails, not barefoot bare bladder, prohibit loud noise and whistling.

Fifth, before the shift and work time shall not be drunk, trouble, fighting and fighting Europe, work shall not gather joking and joking. Smoking and unproven fire are prohibited.

Sixth, strictly abide by the site working hours and regulations, not forcibly crowded meals, not, not pass to see obscene audio and video publications, not to stay at home with others, not go out without a matter of fact, leave to go out and not cause trouble.

VII, found that physical discomfort timely treatment, can not be forced to hold on, or accidents bear the responsibility themselves. Colleagues help each other, take care of each other at work and in life, and find colleagues in the work environment there are unsafe factors timely reminder to reduce the occurrence of untoward events.

Eight, the dormitory does not pull and connect the power lines, prohibit the use of electrical facilities and mechanical equipment. Get along with others, and improve indoor and environmental hygiene.

Nine, not unauthorized use of site firefighting equipment and non-designated machinery and equipment for this type of work, do not go AWOL, do not waste materials.

x. Eliminate unauthorized and unlicensed operation, against unauthorized command, workers have the right to refuse to work in unsafe environments, shall not be allowed to stay around the building for no reason, to prevent accidents.

xi. No one shall be free to steal and take other people's and collective property, and it is strictly prohibited to deliberately destroy public **** property and machinery and equipment.

The above item by item is expected to be implemented seriously, if any violation of personal injury or death caused by the accident, the project department is not responsible. This agreement is effective from the date of signature of both parties.

Party A: xxxx company's second project management department safety group

Party B:

year month

construction safety management agreement content 4

Leasing unit: (hereinafter referred to as Party A)

Rental units: (hereinafter referred to as Party B)

Engineering Name:

In order to strengthen the construction site construction machinery leasing use management, in accordance with the "Chinese People's *** and the State Safety Production Law", "Chinese People's *** and the State Construction Law", "Construction Safety Management Regulations" and other relevant provisions, so that the use of machinery and equipment leasing is in a safe and controlled state, the two sides in the spirit of equality, the principle of voluntariness, the signing of this agreement. Both parties shall, in accordance with their respective responsibilities, supervision and management of construction site machinery and equipment, strict compliance with the rights, responsibilities and obligations set out in this agreement, to ensure the safe operation of construction site machinery and equipment.

I. Rights, responsibilities and obligations of Party A

1. Implement the relevant provisions of the state and Beijing and the Group on the leasing, use and management of construction machinery, is responsible for the comprehensive supervision and management of the leasing of machinery and equipment on the construction site. Have the right to safety supervision, inspection and guidance of construction site machinery and equipment.

2. Provide Party B with the necessary conditions for the entry and exit of mechanical equipment in accordance with Party B's requirements.

3. Provide Party B with underground and above ground obstacles and related information, and assist Party B in safety protection.

4. Have the right to stop illegal command, illegal operation behavior. Have the right to punish those who violate the requirements of safety and civilized construction.

5. Party A shall not operate Party B's machinery and equipment, and shall not force Party B to work against the rules, and Party A shall be responsible for any accidents.

Second, the rights, responsibilities and obligations of Party B

1. must strictly abide by the state and Beijing and the Group on the lease of construction machinery, the use of construction machinery, management of the relevant provisions. It is responsible for the overall management of the machinery and equipment provided.

2. Comply with the provisions of Party A's construction site machinery and equipment management, comply with Party A's management, shall not damage the site safety protection facilities, really need to be moved or dismantled due to the construction, must be agreed by the Party A, the work is completed and immediately restored.

3. Provide Party A with qualified inspection (truck cranes, crawler cranes also need to provide the validity of the test report) good technical performance of machinery and equipment, and to ensure that the mechanical equipment is in good condition during the construction period.

4. Responsible for the daily inspection and maintenance of mechanical equipment. Responsible for the operator's entry education and safety technology briefing.

5. Responsible for the mechanical equipment operators with full valid certificates, on duty with a license, strictly comply with the operating procedures and management of machinery and equipment, is strictly prohibited to operate machinery and equipment under the influence of alcohol.

Party B does not fulfill the above duties in the event of accidents by Party B is responsible.

Third, additional terms:

Supplementary provisions are as follows:

This agreement is in duplicate, signed or sealed by both parties immediately effective. Each save a copy. This Agreement shall be effective from the time of signature until the termination of construction.

Leasing unit: (seal) Leasing unit: seal)

Signature of the person in charge Signature of the person in charge

Month and year

Construction safety management agreement content 5

Party A: ______

Party B: ______

In order to Strengthen the work of production safety , the effective implementation of the system of responsibility for production safety and safety and technical measures to ensure that the joint unit operators of occupational health, machinery and equipment safety, temporary power safety and other work, clear A and B in the safety management of the responsibilities and obligations of the two sides, and to formulate this agreement.

I. Party A's responsibilities and obligations

1, the establishment of construction project safety production organization, with full-time safety management personnel.

2, supervise the joint unit personnel to seriously study and implement the safety of technical regulations, norms, standards; supervise the joint unit of production safety education of operators, check the special types of licenses.

3, in view of the characteristics of construction, do a good job of practical `safety technical briefings, to fulfill the two sides to sign the procedures and strict implementation of safety technical briefings, the implementation of safety measures, and supervise their implementation.

4, adhere to the regular and frequent safety inspections, on the detection of hidden safety hazards, timely rectification advice to Party B or issued a time-limited rectification notice, and supervise the implementation.

5, supervise the associate unit electrician and mechanical equipment maintenance personnel in accordance with the "construction site temporary electricity safety technical specifications" JGJ46-20xx requirements.

6, the unsafe factors put forward by the joint venture unit, we must give attention to the responsibility for the timely resolution, can not be resolved, we must report to the higher units in a timely manner, to put an end to the risk of taking risks with hidden dangers and unauthorized construction.

7, check and supervise the implementation of safety measures for the joint venture, and improve the site of the safety protection work.

Second, the responsibilities and obligations of Party B

1, the joint venture should establish and improve the production safety organization, with a good full-time and part-time safety officer, the implementation of safety education system.

2, all operators should comply with the "construction safety and technical regulations", "construction temporary electricity safety technical regulations", "construction safety technical regulations for work at height" and other relevant aspects of the implementation of civilized construction, put an end to barbaric construction.

3, all operators should comply with Party A's management system and standards in production safety, and obey Party A's management; conscientiously implement the national and governmental guidelines, policies and regulations on production safety.

4, the construction site should focus on the following aspects of work:

(1) according to the provisions of the use of helmets, safety belts, safety nets and other safety protection equipment (equipment);

(2) mechanical equipment protective devices must be complete and effective, all machinery should be timely maintenance, prohibit the "sick" operation. "

(2) The protective devices of machinery and equipment must be complete and effective.

(3) site electricity must be in line with the "construction site temporary electricity safety technical specifications" JCJ46-20xx requirements, must be used in three-level distribution three-level protection, the use of standard electric boxes, fixed distribution boxes should be set up fences, and rain and smash prevention measures. Electrical equipment must adopt TN-S system, set up special protective zero line, electric machinery and electric hand tools should be set up leakage protection device, a machine, a box, a gate, a protection. Maintenance and inspection of machinery and power tools should be the responsibility of professionals.

(4) welding machine should use a special gate box, the length of the primary line should be less than 5 meters, the length of the secondary line should be less than 30 meters. Welding machine wiring on both sides should be crimped firmly, and install a reliable protective cover. Welding handle line double line in place. Welding handle line should use special cable, the line should be well insulated, no damage, bare. Welding machine equipped with special anti-electrocution protection device.

(5) scaffolding materials and scaffolding must be built in accordance with the code requirements and construction programs, so that the mobile operating platform, operating platform to have a certificate of conformity.

(6) It is strictly prohibited to enter the construction site barefoot or wearing high-heeled shoes, slippers; aerial work is not allowed to wear hard-soled and slippery shoes and boots, and it is strictly prohibited to work after drinking or taking drugs.

(7) electricians, electric welders, scaffolding workers, drivers of various motor vehicles and other special jobs, must be licensed, and according to the job needs regular physical examination.

(8) adhere to the system of pre-shift speech, safety daily inspection, with the inspection system, and timely elimination of hidden safety hazards.

(9) Cooperate with Party A's various safety inspections, and rectify the problems raised as required.

Third, Party A and Party B shall consciously fulfill the terms specified above, and strictly supervise and inspect the duties assigned by this agreement to ensure that the construction production safety and smooth progress. Any violation of the provisions of the above agreement, failure to fulfill their duties and obligations, resulting in casualties, the responsible party to bear all the responsibility.

Fourth, this agreement is signed by the person in charge of A and B (on behalf of), the unit seal.

Party A (seal): Beijing Kejian Electronic Technology Party B (seal):

Limited

Signature of the representative of Party A: Signature of the representative of Party B:

Year Month Day Year Month Day

Construction Safety Management Agreement 6

A: Guangxi Wuzhou Cenwu Expressway Ltd. (hereinafter referred to as Party A)

Party B: Shandong Highway Construction (Group) Limited, Guangxi Wu Gui Expressway, the first contract section of the Project Manager Department (hereinafter referred to as Party B)

In order to conscientiously implement the "safety first, prevention first" approach to strengthen the Cenwu Expressway construction safety and quality management, to ensure that the passing vehicles, to ensure that the construction safety and quality management. Quality management, to ensure that passing vehicles, construction personnel, equipment, safety and road traffic, through consultation between the two sides, party B in Wuzhou to Cenxi Expressway construction operations, reached the following agreement:

Article B in addition to comply with the "Work Safety Law", "Chinese People's Highway Act," "Chinese People's Highway Act," "Chinese People's Road Traffic Safety Act," and other relevant safety production laws, Laws, regulations and rules, in addition to comply with Party A's management system.

Article 2 Party A is responsible for supervising, inspecting and providing technical guidance on safety protection and safety quality management in Party B's construction work area; and providing Party B with environmental conditions to ensure safe production.

Article 3 Party B must actively cooperate with Party A and other supervisory units on safety, civilized construction and other issues, and implement them seriously.

Article 4 Party B shall apply for the Construction Permit in accordance with the procedures stipulated in Party A's "Measures for the Management of Road-Related Construction", and implement the safety and quality management measures in accordance with the "Safety Construction Technical Guarantee Measures" approved by Party A.

Article V. Before the construction work, Party B should strictly follow the "Road Traffic Signs and Markings" (GB5768-1999) and the Ministry of Transportation, "Highway Maintenance Safety Regulations" (JTG H30-20xx) and the "Guangxi Expressway Maintenance and Construction Safety Standardized Management Provisions" to set up and place the safety signs; only after the acceptance of Party A's road management department can the construction be carried out.

Article 6 If Party B violates one of the following circumstances, Party A has the right to order Party B to stop work and rectify the situation, and the resulting economic losses will be borne by Party B. If Party B violates one of the following circumstances, Party A has the right to order Party B to stop work and rectify the situation.

First, during the construction period, the arbitrary removal, change the location of safety signs, expanding or reducing the scope of the operation safety zone cloth control by 1000 yuan / time to be punished.

Second, the construction work area is not set up a person responsible for construction site safety and civilized construction and directing traffic, or personnel are not on the scene by 200 yuan / person to be punished.

Third, during construction operations, personnel should be in accordance with relevant national and local regulations to wear safety equipment; construction vehicles, machinery with a valid license, driving, operation should be set up standardized, obvious safety signs. If the construction personnel are not in accordance with the provisions of wearing safety equipment, vehicles or machinery do not hold a valid license, driving, operating safety signs do not meet the technical specifications of the 200 yuan / person to be punished.

Fourth, construction workers, vehicles, machinery and construction materials must be controlled in the construction work area, unauthorized departure from the work area, once found according to the 1000 yuan / times to be punished.

Fifth, Party B must comply with the highway central isolation zone, guardrail, the use of isolation fence, during construction, if you need to open, must be reported to Party A for approval in advance, is strictly prohibited to open without authorization, once found to be 10000 yuan / time to be punished.

Six, Party B vehicles are not allowed in the non-security area of the fabric control range of arbitrary turnaround, retrograde, once found will be handed over to the high-speed traffic police department to deal with and from the risk of collateral according to the 1,000 yuan / times to be deducted.

VII, did not take effective measures to prevent or timely removal of construction spills by 10000 yuan / time to be punished; for the manpower can not be handled falling objects, should be immediately reported to the Party, so that the Party to take contingency measures to assist Party B to deal with.

Article 7 If Party B causes damage to the highway and its ancillary facilities during the construction process, Party A shall be compensated in accordance with the "Compensation Standards for Highway Road Properties".

Article 8 Party B should clean up the site in time after the completion of the construction, after Party A together with the relevant departments acceptance before removing the construction safety control area.

Article 9 Party B should strengthen the management of the construction right-of-way, such as Party B's negligence in the management of vehicles using the construction right-of-way to avoid tolls, Party B shall bear all the responsibilities arising therefrom.

Article 10 In case of traffic jam, traffic accidents, etc., should be timely channeling, and at the same time report to Party A, so that Party A can take measures to ensure the normal passage of vehicles.

Article 11 Party B must ensure that the construction work at K 2791 + 630 km to K 2793 + 670 km of Wuzhou-Cenxi Expressway (left and right sections) will be completed within the effective construction period from December 15, 20xx to February 28, 20xx.

Article 12 Party B shall voluntarily pay to Party A a construction safety and quality deposit*** of RMB 100,000.00 as a guarantee for the fulfillment of this Agreement and construction safety and quality. Party A will take regular and irregular ways to inspect the safety and quality management of the construction section and feedback the inspection results to Party B. Party B will not be responsible for the safety and quality management of the construction section. As needed, Party B will be penalized by issuing a Notice of Deduction for Default in accordance with the Measures for Safety Management of Road-Related Construction, and the penalty will be deducted from Party B's construction safety and quality guarantee. One year after the completion of the road construction section, no construction safety and quality accidents, the remaining construction safety and quality deposit will be refunded.

Article 13 Party B will pay the construction safety and quality deposit of RMB 50,000 to Party A within three days after the signing of this agreement (?50000.00), and the remaining part of the construction safety and quality deposit will be paid off before January 15, 20xx.

Article XIV of this Agreement in duplicate, Party A and Party B each a copy, effective from the date of signature and seal, the two sides **** with the consultation.

The person in charge of Party A The person in charge of Party B

(Signature) (Signature)

Year Month Day Year Month Day

Construction Safety Management Agreement 7

Party A: Taiyuan Tiger Forest Stone Wall Material Co. Construction, in line with the "who builds, who is responsible for" principle, by the A and B parties signed a negotiation "construction work safety management agreement" is as follows:

First, Party B should be in accordance with national laws, regulations and company rules and regulations, and submit to the company's safety supervision and management.

Second, Party B shall carry out safety education and training for construction personnel, equip necessary labor protection supplies and safety equipment, and formulate safety technical measures to ensure the safety of the project.

Third, Party B should implement safety measures after entering the work site to ensure that all kinds of casualties do not occur.

Fourth, Party B personnel into the production area of construction work, only to go to the specified work area for construction activities, without permission shall not enter other dangerous areas and places, if an accident occurs, the consequences of their own responsibility.

Fifth, work at height must be fastened with safety belts, electrical equipment to use safe voltage, leakage protection settings, rain and moisture-proof facilities, is strictly prohibited indiscriminate power supply, access to restricted space must wear the necessary protective equipment, there must be a safety guardian before entering the operation.

Sixth, the production of vehicles to do safe driving, enter the work site to obey the leadership, follow the instructions, in the designated area for the operation, the driver should pay attention to the surrounding geological environment at all times, in order to ensure the safety of the premise of the operation, due to illegal operation of the damage and accidents caused by Party B.

VII. Due to Party B's unauthorized operation, caused by the company's property and personnel casualties, Party B is responsible for the investigation and treatment, resulting in economic losses and accident costs borne by Party B, Party A to assist in the investigation and treatment.

Signature of the responsible person of Party A:

Signature of the responsible person of Party B: