Enterprise safety hazards, always let a lot of leadership worry, but there are some people deliberately illegal not to correct the safety hazards, which need to be notified, the following is my compilation of the enterprise safety hazards situation report, welcome to everyone's reference!
Part I:
To March 15, the District Safety Supervision Bureau in the hidden trouble investigation, found that 16 production and management units there are 155 violations of the law or accident hidden trouble, the inspectors of these hidden trouble may be caused by the safety of the production of accidents on the spot to the people present to persuade the propaganda. At the same time as the issuance of the deadline for rectification instructions, the person in charge of the enterprise was served with a written ? Safety development friendly reminder? and? Sunshine Safety Supervision Tracking Supervision Card? to accept the supervision of service recipients. In order to give full play to the role of social forces to supervise the correction of safety hazards, according to the "Chinese People's Republic of China *** and the State Information Disclosure Regulations," the provisions of the inspection of the violations found in the accident or hidden trouble to be notified.
1. There were 11 safety hazards such as unsealed bottom cover of gas masks and no regular weighing records in Jiangsu Boli Biological Products Co. (Development Zone)
2. Jiangsu Jiangfen Electric Analytical Instruments Co., Ltd. there are fire fighting equipment channel blockage, fire fighting equipment expired without inspection, a fire extinguisher failure and other 9 hidden safety problems. (Development Zone)
3. Taizhou Zhongyu Fire Equipment Co., Ltd. there are 12 safety hazards such as weaving workshop safety channel blockage. (Development Zone)
4. Taizhou Dajin Sealing Material Factory has 12 hidden safety problems, including failure to file emergency rescue plans for production safety accidents. (Daren Town)
5. PetroChina Company Limited Zhejiang Oilfield Branch Subei Oil Extraction Plant Dafeng well area there are four safety hazards such as incomplete site safety warning signs. (Baimi Town)
6. Jiangsu Shuguang Huayang Drilling Tools Co., Ltd. there are 11 hidden safety hazards, such as the paint is not cleaned up in time after the maintenance of the equipment, and placed randomly. (Baimi Town)
7. Jiangsu Sunrise Chemical Co., Ltd. there are 7 hidden safety hazards (Baimi Town)
8. Jiangsu Tianhao New Building Materials Co., Ltd. there are 8 hidden safety hazards, such as standardization of production safety has not been continuously running. (Suxi Town)
9. Taizhou Jinbao Lai Textile Co., Ltd. there are 10 hidden safety hazards such as damage to the door of the equipment electrical box. (Louzhuang Town)
10. Jiangsu Huachen Medical Instrumentation Co., Ltd. there are shrinking the throat of the workshop debris accumulation and other 6 potential safety hazards. (Louzhuang Town)
11. Jiangsu LISD New Material Co., Ltd. there are special operations safety management system has not been revised and other 5 safety hazards (Shen Gaozhen)
12. Taizhou City, Shuguang rolling fat Co., Ltd. there is not on the work of the practitioners of work safety education and training, such as the situation of 21 hidden safety hazards. (Yulan Town)
13. Taizhou City Best Molybdenum Products Co., Ltd. there is no hidden danger investigation and management of 10 safety hazards (Yulan Town)
14. Taizhou City Huan Yu Acetylene Gas Manufacturing Co., Ltd. there is a special operation safety management system has not been revised, such as 4 safety hazards (Yulan Town)
15. Taizhou City Wanxin tungsten and molybdenum products Co. Ltd. has not formulated a special operation safety management system and other 14 safety hazards (Yulan Town)
16. Jiangsu Yangzijiang Tianyue New Materials Co., Ltd. has special operation tickets have not been revised and updated, and other 11 safety hazards (Yulan Town)
Please strictly in accordance with the requirements of the rectification instructions to complete the rectification of hidden dangers in a timely manner; please relevant towns (streets) to strengthen the supervision, supervision and rectification. In order to protect people's lives and property safety, to prevent production safety accidents, the overdue rectification in place of the unit I will implement administrative penalties according to law, until ordered to suspend production and rectification.
Part II:
The county municipal housing bureau, high-tech zone construction management office, Gezhouba base management, the relevant units:
For the implementation of the main responsibility for production safety, effective prevention and containment of serious accidents, to ensure that the safety of the production trend is stable, according to the provincial Department of Housing and Construction, "on the further strengthening of the safety of production management of construction projects to strengthen the main responsibility for the notice", "the main responsibility for the management of construction projects to strengthen the notice". Management to strengthen the main responsibility for the pursuit of the notice "(E Jian [2015] No. 7)," "on the conscientiously carry out the implementation of the construction program of the hazardous parts of the project special action notice "(E Jianban [2015] No. 70)," "on the improvement of civilized construction standards of housing construction and municipal infrastructure to strengthen the site of the dust prevention and control work notice "(Yishihui City Housing Construction [2015] No. 84)) and other documents Requirements, the Municipal Housing and Construction Commission in the second half of 2015 organized the city's construction project safety inspection. The inspection is now reported as follows:
First, the basic situation
The inspection adopts the ? Four not two straight? The `inspection method, *** check 153 projects, with a total construction area of 7.87 million square meters, issued 143 notices of rectification of hidden safety hazards, 10 notices of suspension of rectification of hidden safety hazards. And the existence of major safety hazards of the project was reviewed to ensure the safety of engineering and construction.
Second, the progress of safety work
(a) the construction authorities in charge of safety supervision work in place. All counties and municipalities housing and construction departments can seriously implement the provisions of the government at all levels related to the safety management of construction projects, strengthen the construction field of safety special rectification and hidden trouble investigation and management, to achieve full coverage of the safety supervision work, the jurisdiction of the construction project safety in general is stable, civilized construction, especially dust prevention and control measures are in place.
(2) engineering construction parties to improve the safety and security system, the implementation of the main responsibility. Most of the construction, construction, supervision enterprises in accordance with national, provincial and municipal laws, regulations, norms and standards relating to production safety requirements, the implementation of the main responsibility, improve the safety management system, and actively carry out self-examination and self-correction, safety and civilization of the construction level steadily improved. Ltd. construction, Chongqing Engineering Management Company Limited supervision of the East Star Heart B 3 # building, C1-C5 # building and basement project, China Construction Third Bureau Group Limited construction, Yichang Hongyuan Highway Engineering Consulting Supervision Limited Liability Company Supervision of Yichang City, Xiling two Road Expressway Municipal Project, the construction of all parties involved in the project to establish and improve the safety assurance system, the implementation of the main responsibilities
(C) project participants to improve the standard of civilized construction, promote green construction. Green civilized construction focusing on the prevention and control of construction dust is effective, and the construction site is strictly implemented ? High standards of enclosure, exit without mud, site without dust, bare soil full coverage, dust reduction facilities full? The overall requirements for the promotion of urban green development to lay a solid foundation. Such as Yichang City Kunfa Construction Co., Ltd. construction of Dongchen Xinyin B 3 # building, C1-5 # building and basement project dust prevention and control of more innovative points, such as in the tower crane arm set up a spray system, the construction site to take the whole range of spray dust, masonry cutting with the installation of a dust removal device of the special cutting equipment, etc.; Hubei Guangsheng Construction Group Co. Ltd. supervised the Yichang Municipal Party School (Yichang City School of Administration) relocation project in civilized construction, green construction has a good demonstration.
Third, there are major problems
(a) industry supervision there are still loopholes. Individual counties and municipalities have not taken effective control measures for projects that do not have construction permits. Such as the intimidation jurisdiction of the Yichang City, the fifth hospital outpatient building project.
(ii) Some construction companies are disconnected from project safety management. Part of the construction unit of the project to contract instead of management, did not seriously organize safety inspections, safety management information can not reflect the site situation, the site situation can not reflect the actual management level of the enterprise, there are major safety hazards. Such as Wuhan City, the construction of the Eighth Construction Group Co., Ltd. Huaxiang modern trade and logistics center three (1) phase 26 #, 27 # project, Hubei Guangjian Construction Co., Ltd. construction of the central neighborhood of Danyang City, A 8 # building project.
(C) the safety management measures are not in place for dangerous projects. First, some companies do not pay enough attention to more than a certain size of the hazardous sub-parts of the project. Failure to seriously implement the requirements of the Provincial Department of Housing and Construction "on further strengthening the safety management of hazardous large-scale sub-parts of the project notice" (EJB [2014] No. 43), not according to the actual situation of the hazardous large-scale sub-parts of the project, the development of targeted safety hazards checking and rectification measures, the site there are major safety hazards. For example, the deep foundation pit and high slope project of Building 9 of Yichang Huaxiang Modern Commerce and Logistics Center Phase II, which was constructed by the First Construction Engineering Co. of China Construction Bureau and supervised by Yichang Pinghu Engineering Construction Supervision Co. Ltd, there were major safety hazards at the site, and the project was ordered to be suspended for rectification. Secondly, some enterprises are lax in the management of the construction of the more dangerous sub-parts of the project. Part of the project participating units of tall scaffolding, template support, construction of electricity and other hazardous sub-parts of the project does not pay enough attention to the preparation of the special program is incomplete or not strictly implement the special program, acceptance information is not true, there are major safety hazards on site. Ltd. construction, Hubei Dajing Construction Project Management Co., Ltd. supervision of the Yidu City Public Security Bureau of the new project of business and technical rooms of the special program is incomplete.
(d) Some companies do not pay enough attention to civilized construction work, dust prevention and control measures do not meet the relevant provisions of the Commission on Housing and Construction in Yishu City. Part of the project enclosure deformation, broken, the construction site did not implement the dust prevention and control responsibility system, did not take effective measures to reduce dust as a whole, or the equipment is not in accordance with the provisions of the use of the dust effect. Such as Hubei Hongxin Construction Group Co., Ltd. construction of BRT scheduling center and parking lot a project, Huashen Construction Group Co., Ltd. construction of Jiangshan Duojiao five phase of the first section of the 1 #, 3 # building and basement project of civilized construction measures are not in place.
(e) Some supervisors have weak safety awareness. Failure to fully fulfill the "Construction Safety Management Regulations", the Ministry of Construction "on the implementation of construction safety supervision responsibility of a number of opinions" (Jianshi [2006] No. 248) provided by the production safety supervision responsibility. Supervision units to fulfill their responsibilities are not in place, did not urge the construction unit to investigate hidden dangers and implement corrective actions. Ltd. supervised the Yidu City Public Security Bureau of business and technical housing new projects, supervision of responsibility is not in place.
(F) part of the project safety personnel can not be on duty to fulfill their responsibilities. Such as the construction of China Construction Bureau three companies Huaxiang Modern Trade Center Phase II 1-5 # project safety officer Liu Hao, Wuhan Seventh Construction Group Limited construction Hongyang. Lafayette town commercial housing project safety officer Li Tao, Huatai Construction Group Limited construction of Zhongxing Plaza project safety officer Xu Jie, Huashen Construction Group Limited construction of Jiangshan Duojiao five project safety officer Yan Jianbin, Yichang Huading Construction Engineering Company Limited construction of Wujiagang District Branch of the business and technical buildings and station police station project safety officer Li Hua are not on duty.
Fourth, the treatment of opinions
(a) praise
1, the safety management, dust prevention and control of effective work in Yichang City, Kunfa Construction Co., Ltd. and its project leader Wang Gongxue, Hubei Guangsheng Construction Group Co., Ltd. and its project leader Tu Chuanfeng, China Construction Engineering Group Co.
2, for the implementation of safety supervision responsibilities in place of Wuhan Weishi Engineering Supervision Co., Ltd. and its project director Luo Shibiao, Chongqing Municipal Engineering Management Company Limited and its project director Liang Qingdong to be informed of the commendation.
(B) notification of criticism
1, on the construction site safety management is poor, there are large safety hazards on the construction site of the project construction unit Huashen Construction Group Limited and its project responsibility Zhu Wenbo, Hubei Guangjian Construction Company Limited and the project manager Wang Man, Yidu Xingyi Construction Engineering Company Limited and the project manager Wang Fang, Wuhan Eighth Construction Group Co. Ltd. and its project responsible person Du Shuhua, China Construction Fourth Bureau First Construction Engineering Co., Ltd. and its project responsible person Liu Hao, China Construction Fourth Bureau Third Construction Engineering Co., Ltd. and its project responsible person Yang Guo, Hubei Yuanan Hailong Construction Co.
2, Yichang Pinghu Engineering Construction Supervision Co., Ltd. and its director Cheng Xiaoli and Chen Junping, Yichang three major engineering construction supervision company and its director Wang Changquan, Hubei Huarai Engineering Construction Supervision Co., Ltd. and its director Xie Ruigang, Hubei Dajing Construction Project Management Co., Ltd. and its project director Zhu Xuchun to be notified of the criticism, and credited to the integrity file.
3, not according to the relevant requirements to the post to fulfill their responsibilities of safety management personnel Liu Hao, Li Tao, Xu Jie, Yan Jianbin, Li Hua to be notified and criticized, and credited to the integrity file.
Fifth, the next step of the work plan
In 2016, the Municipal Housing and Construction Commission will combine the Ministry of Housing and Construction, "two-year action program for the governance of engineering quality" of the relevant requirements, to do the following main work:
1, the implementation of the responsibility to strengthen supervision. The implementation of the main responsibility of the participating units, strengthen the supervision of enterprises on the project, strengthen the concept of the general contractor's total responsibility for construction safety, and the implementation of the project manager's responsibility for quality and safety management.
2, the full implementation of production safety standardization. Comprehensive implementation of the newly revised "Yichang City, construction safety production management standardization implementation manual", in accordance with the requirements of the Provincial Department of Housing and Construction "on the in-depth construction safety production standardization of the implementation of the views of the work", to carry out the city's construction safety production standardization assessment work, to strengthen the safety standardization of building construction.
3, strengthen the supervision of dangerous large projects. Strictly strengthen the safety management of hazardous sub-parts of the project, y learn from the ? Shenzhen 12.20 landslide accident? Lessons learned, strengthen the safety inspection before and after the Spring Festival, increase the supervision of dangerous large projects, effectively curbing large and above the safety of production accidents; comprehensively carry out the safety of the production of hidden trouble investigation and management, and unremittingly, to promote the city's construction safety production situation continues to be steadily good.
4, strengthen the dust prevention and control work, promote the green development of the city. This year, the Housing and Construction Commission in a clear responsibility under the premise of the establishment of accountability mechanisms, dust remediation work into the target assessment tasks, to promote the city's green construction, urban green development work.
Annex: the second half of 2015 safety inspection project scoring summary table