According to Article 12 of the Regulations on the Reporting and Investigation of Production Safety Accidents, a report on an accident should include the following:
(1) a general description of the unit in which the accident occurred;
(2) the time and place of occurrence of the accident, as well as the accident scene;
(3) a brief account of the accident;
(4) the number of casualties (including the number of people unaccounted for) and preliminary estimates of direct economic losses that have been caused by the accident;
(5) measures that have been taken;
(6) a preliminary estimate of direct economic losses. (d) the number of casualties (including the number of people unaccounted for) and the preliminary estimate of direct economic losses;
(e) the measures that have been taken;
(f) other circumstances that should be reported.
The model is as follows:
×××× Accident Report
I. A Brief History of the Accident
Time, place, person, gender, department, type of work, incident, and results of injuries
II. Analysis of the Cause of the Accident
1. Direct Causes (Intuitive Causes Leading to the Accident)
1)×××××× ××××××.
2, indirect causes (eliminating factors other than intuitive causes)
1)×××××××××××××××××××;
2)×××××××××××××××××××.
3. Main causes
1)×××××××××××××××××××.
2)×××××××××××××××××××.
3. Rectification and preventive measures (countermeasures for each of the above major causes)
1)×××××××××××××××××××;
2)×××××××××××××××××××;?
Four, the results of the accident
1)×××××××××××××××××××;
2)×××××××××××××××××××;
Extended Information: Example Sample: I. Accident Overview XX, 20xx, 13:15 pm or so, in the four sides of the Jinshui copper smelting plant wind pressure machine room, the new air compressor seat column concrete pouring construction, vibrator coupling cable leakage touched the incident, the injured Pang FARONG had a midday meal, ready for construction, when his hand touched the vibrator coupling cable, was struck down by the electricity on the spot, when the site of the construction workers immediately disconnect the power switch. Pang Fahrong fell to the ground at this time has been unconscious, then workers immediately Pang Fahrong lifted to the outdoor ground lying down, observe his heart pulse beating slowly, and immediately on his artificial respiration, while organizing the vehicle will be Pang Fahrong rushed to the hospital for resuscitation treatment after two hours after sobering up in the hospital after six days of treatment, discharged home to recuperate. Two, accident analysis 1, through the 6:11 electric shock accident, the occurrence of this accident, the company, although the construction team employees have been into the field of production safety education, but the lack of effective operating procedures and safety inspections coupled with Pang FARONG self-protection awareness is weak is the main cause of this accident. But the company in the safety management of its own shortcomings, the company is not equipped with the construction site to designate a person and full-time electrician and technician to strengthen the construction site safety production operation supervision and management. 2, quality control and safety department did not send a full-time safety officer to the entire construction site inspection, management work, the construction team did not have a good safety knowledge propaganda and education, the management of the construction site, follow the work less than the implementation of the Safety production and technical measures and inspection and management work is not in place; did not understand and convey the company's concept of development of safety production management As a quality control department did not seriously put the "safety development, prevention first" as the first any to grasp, did not fulfill as a quality control safety officer's work attitude and responsibility that led to the accident. 3, the project department: in the field management technicians on the usual details of the work of negligence and carelessness, the team staff safety education is not in place, the usual tracking and implementation of the work is not enough, did not seriously foresee the occurrence of things that happen in the normal course of events, seedling treatment in the state of nip in the bud, according to the characteristics of the environment of the construction site, the ideological high attention to the construction of production safety management system. 4, team leader: as a construction team leader, the lack of production safety education, on-site management is not in place, supervise the team construction personnel safety production awareness is not enough, safety awareness is weak, the implementation of the front-line staff safety management education is not in place, the joint guarantee mutual insurance, three do not hurt is not in place. Three, summary and requirements 1, through the occurrence of this accident, exposed managers in the work of production safety paralysis of thought, poor safety awareness, the requirements of the future work, to put an end to the occurrence of such events. 2, to strengthen the awareness of safety knowledge of the various functional departments, must strengthen the construction site inspection efforts, while the discovery of hidden security problems immediately removed. 3, the quality inspection department must often organize staff safety education and learning, construction safety and production operating procedures on the joint security and mutual self-prevention awareness to speak y and thoroughly, must be tracked and managed. 4, the person in charge of each project must always be at the work site to seriously fulfill the duties of guardianship, when the work point is scattered, guardianship is difficult, each work point to set up a special guardian. 5, adhere to the people-oriented, safety knowledge education, especially to strengthen the work of the person in charge of the safety responsibilities of education, improve employee safety awareness and self-protection awareness. Four, the accident processing recommendations: The first responsibility, safety and quality inspection department of the safety work supervision, implementation of the fulfillment of duties are not in place, the penalty Yang Fu 600 yuan, Liu Fayang 200 yuan, Li Xingmin 200 yuan, Zhou Xinghong 200 yuan. Second responsibility: the project department, the construction site supervision is not in place to fine 300 yuan. Legal Information Network - Production Safety Accident Reporting and Investigation Regulations