Hainan Decoration Class House Decoration Instruction Manual

Hainan Decoration Class House Decoration Instruction Manual

Part 1: Regulations on Comprehensive Community Management

1. What is the basis for the residential decoration management of the community management office? ?

Article 83 of the General Principles of Civil Law of the People's Republic of China: Neighboring parties to real estate shall correctly handle the disputes in the spirit of conducive to production, convenient life, solidarity and mutual assistance, fairness and reasonableness. Adjacent relationships in terms of water, drainage, traffic, ventilation, lighting, etc. If it causes obstruction or loss to neighboring parties, the infringement shall be stopped, the obstruction shall be removed, and the loss shall be compensated.

Article 8 of the Ministry of Construction Order No. 33 "Measures for the Management of New Urban Residential Quarters" "The rights of property management companies: (2) To manage residential quarters in accordance with the property management contract and management measures;" Article 14 “Real estate owners and users who violate these Measures and commit any of the following acts shall be stopped by the property management company, criticized and educated, ordered to restore the original status, and compensate for losses. (1) Changing the use of land in the community without authorization; (2) Changing without authorization The purpose, structure and appearance of houses and supporting facilities, damaging facilities and equipment, endangering the safety of houses; (3) Building privately and randomly, parking and parking vehicles indiscriminately, piling up in the most used parts of the house, occupying and destroying green spaces at will , polluting the environment, affecting the landscape of residential areas, and disturbing residents with noise; (4) failing to pay various fees in accordance with regulations."

2. What do you think of the "Resident Handbook" signed between you and the property management office? What are the legal effects of the "Renovation Management Regulations" and what are your rights and obligations?

The property management office of our company is an enterprise legal person agency entrusted by the owners' committee to provide paid management services for housing equipment in residential areas. The "Resident Handbook" signed with the residents is mutual. In a civil agreement, both parties must perform the agreed rights and obligations.

The "Decoration Management Regulations" in the "Resident Handbook" are based on the "General Principles of the Civil Law", "Administrative Measures for New Urban Residential Quarters", "Building Decoration and Decoration Management Regulations", "Fire Protection Management Regulations" and other laws and regulations , and is formulated based on the actual situation of the residential community. Its role is to safeguard the common interests of all residents in the community and standardize home decoration and reconstruction work.

You have the right to consult the community management office about the relevant regulations on decoration management, and you have the right to modify the layout of the room and change various finishes according to your own wishes without violating the relevant provisions of the "Decoration Management Regulations" , select decoration companies, choose decoration materials, and have the right to participate in and supervise the management work of the management office.

Your obligations include: abiding by community management regulations, paying management fees as required, and not hindering managers from performing their duties.

3. What is the scope of decoration and modification that you can renovate or renovate the house you buy or rent? Why?

1. The scope of decoration and alteration in the house you purchase is the indoor parts of the house that are not public facilities. Construction should be carried out carefully without harming the interests of others in areas that are of interest or interest to neighbors or public facilities.

If you need to renovate or remodel a rental house, the scope of renovation or remodeling in the house is the same as above, but the construction should be carried out with the authorization of the owner of the house.

2. Parts belonging to public facilities: (1) Sanitary equipment: such as main defecation risers and ventilation pipes. (2) Water supply part: main water supply riser, pipes connecting the main water supply riser to the water meter, and water meters. (3) Kitchen equipment: such as flues, sewage pipes, pipe wells (excluding elbows connected to them). (4) Gas supply facilities: pipelines between the gas pipeline network and the gas meters (including gas meters). (5) Power supply facilities: such as electricity meters, distribution lines between the power supply pipe network and the main switch (excluding the main switch, leakage protection facilities, etc.). (6) Others: electronically controlled door intercom devices, etc.

3. Parts of the house you buy or rent that have interests or relationships with neighbors and public facilities: partition walls, floor slabs, roof panels, partition doors, windows, etc. .

The 2nd floor manager handles the decoration application procedures, publicizes and explains the regulations on decoration management, guides and helps residents solve problems in the decoration according to this manual, and prevents illegal similarities during the decoration process. In a community with a building manager, the building manager's duties are exercised by the director

3 The water and electricity class is responsible for inspecting and supervising the decoration of water and electricity pipelines and electrical equipment

4 The security class is responsible for the decoration Security inspection, supervision and reporting during the construction process

5 The cashier is responsible for collecting the renovation fees payable

2. How do you go through the renovation and renovation procedures?

1. Go to the community management office to get the "Decoration, Construction and Maintenance Application Form";

2. Fill out the "Decoration, Construction and Maintenance Application Form" (in triplicate) based on the above requirements. , and attach a decoration plan, submit it to the management office, which requires clear handwriting and accurate dimensions;

3. After receiving the application form, the management office should generally give an approval within 4 working days in accordance with relevant regulations, but will not be responsible. Construction technology approval (those that require construction technology approval should be reviewed by a unit with design qualification entrusted by the owner);

4. After the "Decoration, Construction and Maintenance Application Form" is approved, the management office will proactively notify the owner. After receiving the notice, the owner should work with the person in charge of the construction project to bring the "Construction Enterprise Qualification Certificate" (copy with official seal) and the construction personnel's "Job Certificate" and "ID Card" (original and one copy) to the community. The management office receives the "Application Form for Decoration, Construction and Maintenance" and goes through the following procedures (a letter of authorization signed by the owner is required to handle decoration on behalf of the owner):

(1) Sign the "Decoration Guarantee";

(2) Pay the elevator fee for decoration;

(3) The construction unit needs to pay the decoration deposit and the cost of applying for various certificates;

(4) Apply for the "Decoration Pass" for construction personnel 》, 1 person, 1 certificate, bring your own small one-inch photo without crown;

(5) Receive the "Decoration Construction Permit";

(6) If necessary, perform fire work If you are planning to perform operations, go to the management office to fill out the "Application Form for Temporary Hot Work" one day before the operation. Construction can only be carried out after approval from the management office.

5. The person in charge of the decoration and the management office shall agree on a time (usually the day before the decoration), and the community management personnel will make a safe and civilized construction briefing to all personnel who enter the community for decoration work;

6. Decoration work can be carried out.

Part Three Engineering Technical Guidance

How to ensure the quality standards of your decoration and reconstruction projects are safe, reliable, practical and frugal? I hope you will pay attention to the following points:

1. Construction part

1. Relevant laws: Article 126 of the General Principles of Civil Law: Buildings or other facilities and shelving on buildings If an object or suspended object collapses, falls off, or falls and causes damage to others, its owner or manager shall bear civil liability, except for those who can prove that they are not at fault;

2. How to ensure the safety of the building Structurally safe?

The main structure of a house includes the foundation, columns, beams, slabs, walls, roofs and other load-bearing components of the house.

Removing and modifying foundations, beams, and columns; drilling holes in beams and columns or damaging the protective layers of steel bars on beams and columns will affect structural safety.

3. How to change the original design interval?

When you are confidently preparing to remodel your home, do you first consider changing the original partitions to meet your functionality? If this is the case, please note: At present, all residential buildings are frame structures, and the partition walls within the units can in principle be dismantled and modified. However, since the design of floor slabs mostly uses beamed floors, all indoor partition walls in the design have beams to bear the load, and the floor slabs do not bear the concentrated load under the action of the partition walls. If solid bricks are used to build walls directly on the floor slabs, it may cause The floor slabs are cracked, water is leaking, and the lower retaining layer is falling off.

Therefore, lightweight structures should be used for floor partitions (such as aluminum alloy partitions, plywood partitions, gypsum board partitions, lightweight brick partitions, etc.)

4. If you need to install partitions between walls, floors, What should you pay attention to when working on floor panels? Why?

According to the above mentioned, household walls, floors and floor panels are special parts. If you do not pay attention to the construction methods during decoration and reconstruction, it may infringe on the civil rights of others. .

Among them, the walls and floor of the house are divided into two households or 5. Things to pay attention to when renovating kitchens and toilets:

Home decoration and renovation are most likely to cause neighborhood disputes: renovating the kitchen There were leaks in toilet walls, floors and pipe openings. So what should you pay attention to when renovating the kitchen and toilet? Usually kitchen and toilets are divided into two types: ordinary type and caisson type. Caisson type is the most likely to cause leakage and it is difficult to find the source of the leakage after leakage. The repair time is long and causes the greatest direct economic loss to the owner. To prevent kitchen and toilet leakage, the following links should be dealt with during the decoration process:

(1) Prevent water leakage caused by the destruction of the original waterproof layer of the upper unit due to the construction of this unit. Vibration is the main cause of this situation. To avoid this situation, the correct construction method is: when constructing kitchen and toilet ceilings, do not directly use impact drills or cement nails to fix decorative materials on the ceiling. Instead, first fix load-bearing wooden squares (or other materials) on the surrounding walls, and then arrange the skeleton for hoisting the ceiling vertically and horizontally. Fixing the ceiling on this skeleton will not cause damage to the upper waterproof layer;

(2) For rough houses or kitchens and toilets that need to replace the original wall or floor tiles, they should be chiseled by hand instead of directly hitting the ground or wall with a hammer. Otherwise, adjacent buildings will inevitably be damaged. The wall or floor panels are cracked or even falling off. After cutting out the surface layer, attention should be paid to keeping the floor dry, because at this time the floor has no waterproof function, and any water source may seep into the lower layer;

(3) When shoveling away the original facing layer , due to vibrations causing countless tiny cracks in the floor, the original waterproof layer no longer exists, so the process standards for waterproofing treatment are higher than those for construction directly on the rough surface: A. Loose structures in the base layer should be completely removed; B. Penetration Leave grooves for the water supply and drainage pipes of the floor slab at the joints with the concrete, and fill them with sealing materials; C. Use synthetic polymer waterproof paint to paint the entire slab surface, usually 20CM above the wall; D. Test the water. Negotiate with the residents on the lower floor in advance to ensure that the entire level is soaked in water for no less than 24 hours; E. Level the walls and floor with 1:2.5-1:3 cement mortar. The thickness of the leveling layer is generally 1.5-2CM; F. The ground slope should be leveled in the direction of In the direction of the floor drain, the slope is 1-3. The elevation of the floor drain outlet should be no less than 20MM lower than the ground elevation: G. When applying decorative tiles with pure cement mortar, note that the finished ground elevation should be no less than 20MM lower than the ground elevation outside the door.

2. Doors and windows

1. Can the position, shape and material of the window be changed? Why?

Window is an important element in the appearance of a building. Changing the position, shape, and material of the window will destroy the neatness and beauty of the building, affect the preservation and appreciation of the building's value, and harm the public interest.

2. What should you pay attention to when installing anti-theft doors? Why?

When installing anti-theft doors, you should consider whether they will hinder the convenience of neighbors when they are opened. Otherwise, they will be complained by neighbors because they affect fire safety, and they will not pass the acceptance of the management office;

3. Water supply and drainage

1. According to Article 6 of the "Administrative Regulations on Urban Adjoining Houses with Different Properties", "The owners and users have the right to own and use the entrance halls, balconies, roofs, and corridors." , kitchens, toilets, as well as courtyards, water supply and drainage facilities, etc., must be jointly used reasonably and bear corresponding obligations; unless otherwise agreed, no party shall occupy or monopolize the property. Any use of parts shall not harm the interests of other parties.”

2. What matters should be paid attention to when laying water supply pipes secretly?

Concealed water supply pipes will be corroded by moisture to a large extent. If you do not pay attention to the selection of materials, water leakage will inevitably occur in one or two years, or in ten or eight years.

Among the current decorative materials, you'd better choose new aluminum-plastic pipes. The biggest advantage of this pipe is that it is corrosion-resistant, and the inner pipe surface is smooth and corrosion-resistant.

3. What problems will be caused by changing the water supply and drainage pipe wells?

When the wall of the water supply and drainage pipe well is removed, it is likely that the main riser will be vibrated, causing the joints of the upper or lower floors of the pipe to loosen, and water leakage will easily occur. In addition, removing the tube well will destroy the entire waterproofing system of the walls and floors. Some households have also made the main standpipe well smaller, which will not only cause the above-mentioned hazards, but also make future maintenance difficult or even impossible.

4. What is the function of the drainage pipe well inspection port?

The main drainage riser is a public facility. It is designed to have an inspection port every two floors to facilitate the inspection and dredging of the pipeline in the future. If the residents seal it by themselves, problems will occur in the pipeline. , cannot be inspected and processed quickly, causing damage to the interests of residents.

5. Can water supply and drainage pipes without masonry wells be sealed by themselves? Why?

In principle, water supply and drainage pipes without masonry wells cannot be sealed. This is because sealing the pipes will make future pipeline inspections and repairs difficult and increase maintenance costs. If you really need to seal the pipeline, you should make a written commitment to the management office: agree that the management office will inspect and repair the pipe at any time when necessary, and be willing to bear the increased costs caused by sealing the pipeline.

IV. Gas pipeline network part

1. Relevant legal basis:

(1) According to Article 123 of the General Principles of Civil Law: Engage in high-altitude , high pressure, flammable and explosive, extremely toxic, radioactive, high-speed transportation and other operations that are highly dangerous to the surrounding environment and cause damage to others, you shall bear civil liability; gas is flammable and explosive, and the correct use of gas is not only for you and The guarantee of the safety of your family is also related to the safety of the lives and property of all owners. Therefore, you should pay attention to the following points when decorating or rebuilding involving gas:

(2) According to Article 24 of Chapter 4 of the "Chengdu Urban Gas Management Interim Regulations" "Gas facilities, The manufacturing, installation, maintenance, use and safety protection of gas appliances and gas measuring instruments shall comply with the relevant regulations of the state and this city on gas management."

2. Chengdu Gas Company stipulates that without the approval of Chengdu Gas Company, no unit or individual may modify, dismantle, seal off or activate gas supply equipment; users can dismantle pipes and connect without permission. Using gas from a meter, or using a blocked pipe (meter) without permission is an act of gas theft. Once discovered, the gas supply will be stopped immediately, and whether to resume the gas supply can only be considered after investigation, conclusion and handling according to the circumstances.

3. Users who privately relocate gas meters, pipes, valves and other gas facilities and install water heaters shall not only bear the labor and material costs required to restore the facilities to their original condition, but shall also be fined according to the violation.

4. Users who "ignite" privately are serious violations of gas safety management and metering and charging regulations. In addition to being punished, they will be held legally responsible for safety accidents caused by this.

5. If the user needs to modify or dismantle the indoor gas supply equipment, he must submit a written application (fill in the form) to the municipal business office. After review and approval, the business office will organize the construction and the user will pay for the work. , material fee.

6. Users who fall into one of the following circumstances should apply for modification of gas supply equipment;

(1) House renovation or relocation of living units requires modification of gas supply equipment;

(2) Updating or adding gas appliances requires changing pipes and gas meters;

7. Applications for modifications that fall under the following circumstances will not be approved:

(1) Does not comply with safe gas use;

(2) The gas appliances used are not approved by Chengdu Gas;

(3) The house that needs to modify the gas supply facilities is Illegal construction;

8. When the community management office is inspecting your home decoration and reconstruction, if it is found that you have not performed the operations according to the above requirements, it will not be approved.

5. Electrical installation part

1. Precautions for modification of power supply pipelines:

The installation requirements of power supply pipelines are highly technical, and you must entrust a professional Technically qualified units and individuals carry out design and installation, and supervise construction personnel to strictly abide by industry standards. Generally speaking, matters that should be paid attention to are:

(1) Pipelines that are concealed are susceptible to water and insects. , nails, drilling, etc., so the pipelines should be cased when laying (iron pipes are preferred, synthetic plastic pipes can also be used);

(2) Check whether the specifications of the wires to be used are consistent with Match the electrical load;

(3) It is best to classify and design electrical circuits in zones, so as to avoid damage to other electrical appliances when a short circuit occurs somewhere;

(4) When When the indoor electrical load exceeds the design load of the unit, if the outdoor power supply line is not modified, it may cause a fire due to overloading. Therefore, a report should be made to the management office to change the outdoor line. The owner is responsible for the modification costs.

2. What matters should be paid attention to when using electricity for decoration tools?

The electricity consumption of decoration tools should not exceed the indoor electricity load of the residence (generally 20A), because overloading electricity will not only damage electrical facilities and cause circuit failures, but in severe cases, it can easily cause fires and damage the building circuit system. Therefore, When the electricity consumption of decoration tools exceeds the indoor electricity load of the residence, the owner should apply to the management office three days in advance. After approval, go to the designated power supply for wiring and bring his own cables.

VI. Communications

1. Basic situation introduction: According to the requirements of the "Chengdu Telecommunications and Communications Management Interim Regulations", new residential communities have preset communication lines and pipes. Rising pipes for communication lines have been preset, and communication line pipes have been reserved for each floor to the entrance of each unit. Generally speaking, before handing over to households, the construction unit has laid communication pipelines according to the standard of one household and one line, and the cost of laying communication lines is borne by the construction unit.

2. If you need to lay two or Section 7 cable radio and television facilities

1. Cable radio and television facilities in residential areas refer to the optical cables used in cable radio and television systems. Amplifiers, branch distributors.

2. Cable radio and television facilities are state property and are protected by law. No unit or individual may appropriate or destroy them.

3. The act of moving, transferring and installing branch distributors and user terminal boxes without authorization is an act that damages the performance of cable radio and television facilities. According to Article 9 of the "Chengdu Cable Radio and Television Facilities Protection Regulations", is prohibited.

4. Usually cable TV antennas are designed and installed according to the standard of one line for each household, and the signal of each line is only suitable for one TV. If you need to install two or eight, anti-theft facilities

1. According to the "Notice on Rectification of Anti-theft Networks": From December 1, 1999, new anti-theft networks shall comply with the following regulations:

(1) Structural safety, The appearance should be beautiful, and similar materials, colors, and styles should be used in the same building;

(2) It should be installed on the inside of the window sash and have a movable fence or at least one movable opening for safe evacuation of people;

(3) Anti-theft nets shall not be installed on balconies, outer corridors and their railings. If the balcony or outer corridor really needs safety protection, an anti-theft net or fence shall be installed at the door frame where it enters and exits;

9. Fire prevention facilities and fire safety

1. How to store and transport flammable, explosive and corrosive items? Why?

According to the provisions of Article 123 of the General Principles of the People's Republic of China and the Civil Law (Article (4) above has been quoted), as well as the "Fire Protection Regulations of the People's Republic of China" and Chengdu The city's relevant fire protection regulations state that flammable and explosive materials such as bottled petroleum gas, banana water, gasoline, paint, fireworks and firecrackers cannot be transported in elevators because people in the elevator car cannot escape when an accident occurs. In addition, since there are many power tools used in home decoration places, sparks are easily generated especially at sockets. If you do not pay attention to the stacking of flammable and explosive materials, it is easy to cause a fire. Therefore, flammable and explosive materials should be stacked in a cool place and away from power sources and fire sources. For everyone's safety, please strictly abide by these regulations.

2. What are the problems with piling decoration debris and garbage in corridors and lobbies?

Corridors and lobbies are public spaces and fire exits. According to the national fire regulations and the relevant fire protection regulations of Guangzhou City: fire escapes must be kept clear and unobstructed, and no unit or individual may occupy or block them. Therefore, for everyone’s safety, no decoration units or individuals are allowed to pile decoration debris and garbage in the corridors and lobbies.

3. What matters should be paid attention to when doing hot work? Why?

(1) Arc welding is an operation method that uses high-temperature arc generated by electrode short circuit to weld and cut metal. Since most of the materials used in decoration projects are flammable and explosive, if fire safety is ignored during welding operations, it is very likely to lead to fire and explosion accidents. Precautions for hot work include:

(2) Check whether the switches, fuses, distribution line cross-sectional area, network power supply power, voltage, etc. of the power distribution system match the power and voltage of the welding machine. ;

(3) The welding machine should be placed in a dry and sheltered place, and the welding machine should be grounded when in use;

(4) Inflammable and flammable materials should not be stored around the welding machine when in use. Explosive dangerous goods cannot be placed together with oxygen cylinders, acetylene cylinders, and liquefied gas cylinders. During operation, check whether there are flammable and explosive items in places where the welding flame may fall;

(5) Welding machine , electric welding pliers, and welding wires should comply with safety standards;

(6) Operators should hold certificates to work, fire extinguishers should be provided within the operating range, and there should be no less than three staff members (one or two people working) Guardianship);

10. Choosing a decoration company

1. What are the requirements for choosing a decoration company?

According to Jianjian (1997) No. 92 "Trial Measures for the Management of Family Room Decoration and Decoration", Article 6 stipulates that any unit that undertakes a family room decoration and decoration project must hold a certificate issued by the construction administrative department. "Construction Enterprise Qualification Certificate" for the scope of contracting of building decoration and renovation projects.

For individual decoration practitioners who undertake home decoration projects, they should hold a certificate from the local township. In order to ensure the quality of your home decoration project and protect the legal rights of all residents in the community from infringement, please You must choose a qualified decoration company.

2. How should you sign an entrustment contract with the decoration company?

Signing an entrustment contract with a decoration company is an important step in self-protection. The decoration entrustment contract should contain the following contents:

(1) Project content;

(2 ) Project cost and payment method;

(3) Liability of both parties;

(4) Liability for breach of contract;

(5) Warranty period;

11. Decoration materials

1. How to select and store decoration materials?

Relevant laws are based on Articles 122 to 126 of the General Principles of the People's Republic of China and the Civil Law: If product quality is unqualified and causes damage to other people's property or personal life, the manufacturer of the product shall Authors and sellers shall bear civil liability in accordance with the law. If the transporter or warehouse is responsible, the product manufacturer or seller has the right to claim compensation for losses.

2. What should be paid attention to when stacking materials?

(1) Relevant laws are based on Article 126 of the General Principles of the People's Republic of China and the Civil Law: Buildings or other facilities, as well as objects placed on the building and suspended objects collapse or fall off. , if the fall causes damage to others, its owner or manager shall bear civil liability, except those who can prove that they are not at fault;

(2) If the piled debris is too heavy and the height exceeds the balcony guardrail Not only is it unsightly, it may also cause cracks on the floor, causing water seepage and the lower floor barrier to fall off. In severe cases, it may cause the overhanging balcony to collapse, posing a threat to the personal safety of the owner. Some decorative materials are flammable (such as paint, rosin water, etc.). If someone throws cigarette butts or does welding upstairs, it may cause a fire. Therefore, flammable and explosive materials cannot be piled on the balcony.

(3) If items are placed on the balcony guardrail, they may easily fall or be blown down by strong winds and injure pedestrians downstairs. Therefore, the height of the items stacked on the balcony guardrail should not exceed the railing. .

12. Suggestions on project payment

There are many hidden projects in home decoration that are difficult to find, especially the construction of waterproof layers in kitchens and toilets and water and electricity installation projects. , therefore, it is recommended that you pay the construction unit in three stages when paying for the project:

The first stage: Within one week after the decoration entrustment contract is signed, 30% of the total project payment can be paid;

p>

The second stage: when the project progress reaches 50%, an additional 30% of the total project payment can be paid;

The third stage: after the project is completed and accepted, an additional 30% of the total project payment can be paid;

The fourth stage: One month after the project passes acceptance, if there are no project quality problems, the balance can be paid.

13. Project Acceptance The quality of the home decoration project directly affects the safety and comfort of your home. For this reason, we provide the following acceptance standards for your reference. We hope it will be helpful to you::

p>

1. Floor surface

(1) The surface layer and the foundation must be firmly adhered without hollowing. The solid-surface house should be smooth, and defects such as cracks, peeling, and sanding are not allowed; the block-facade house should have a smooth surface, even and straight joints, and no missing edges or corners.

(2) The floors of bathrooms, kitchens, and balconies should be 1-1.5CM lower than the adjacent floors, and there should be no accumulation of water. Flooding and leakage are not allowed.

(3) The surface of the wooden floor should be flat and firm, with tight joints.

2. Decoration

(1) The wood decoration project should have a smooth surface, straight lines, tight seams, no nail caps exposed, and must be nailed firmly to the base house.

(2) The surface of plastering should be smooth and there should be no defects such as hollows, cracks and blisters.

(3) The surface of the facing tiles should be clean, the adhesion should be firm, the yin and yang corners and moldings should be straight, and there should be no missing edges or corners.

(4) Paint and grout should be consistent in color. There should be no peeling or missing brushing on the surface.

3. Electrical

(1) The installation of electrical lines should be smooth, firm and straight. There should be conduits passing through the wall. The wire connections must be tight. Aluminum wires must not be connected by splicing or splicing. Binding. When using pipe wiring branches, the connection points must be tight and reliable so that the pipelines are structurally and electrically connected as a whole and have reliable grounding.

(2) The installation bracket of low-voltage electrical appliances of lighting equipment must be firm, with complete components, good connections and correct position.

(3) The leakage protection device should be tested to be intact and effective.

4. Water, sanitary and fire protection

(1) Pipes should be installed firmly, with control parts that can be opened and closed flexibly and without leakage.

(2) Floor drains, sewage pipe interfaces, and inspection ports must not leak, and pipe drainage must be smooth.

(3) The sanitary appliances are of good quality, the interfaces must not leak, and the installation should be straight and firm, with complete components and flexible braking.

Relevant Provisions of Chapter 4

We hope that you can work with us *** to manage your living and working in peace and contentment. If you violate the "Resident's Handbook" or the "Application Form for Housing Equipment Decoration and Renovation" "According to the agreement, if illegal decoration causes direct economic losses or infringes on relevant interests, the property management will dissuade and complete the correction within a time limit. We hope that you can support the measures that the property management office may take:

1. Reference to the law:

Chapter 6 Civil Liability of the General Principles of Civil Law

Section 1 General Provisions

Article 106 A citizen or legal person violates a contract or Those who fail to perform other obligations shall bear civil liability.

Article 109: If one is harmed by preventing or stopping the infringement of state or collective property or other people's property or person, the offender shall be liable for compensation, and the victim may also pay compensation Appropriate compensation;

Article 110 If a citizen or legal person who bears civil liability needs to be held administratively responsible, the administrative liability shall be held; if a crime is constituted, the legal representative of the citizen or legal person shall be held accountable in accordance with the law. Hold people accountable for their actions.

Section 2 Civil Liability for Breach of Contract

Article 111 If one party fails to perform its contractual obligations or the performance of its contractual obligations does not meet the agreed conditions, the other party has the right to demand performance Or take remedial measures and have the right to demand compensation for losses;

Section 3 Civil Liability for Infringement

Article 117 Misappropriation of state or collective property or the property of others If the property cannot be returned, the property shall be compensated at a discounted price. If the property of the state, the collective, or the property of others is damaged, it shall be restored to its original condition or compensated at a reduced price. If the victim suffers other major losses as a result, the offender shall compensate for the losses.

2. Possible measures taken by the property management office

Chapter 6, Section 4, Ways to Bear Civil Liability, Article 134 of the "General Principles of Civil Law" The main methods are:

(1) Stop the infringement;

(2) Eliminate obstacles;

(3) Eliminate danger;

(4) Return of property;

(5) Restoration to original condition;

(6) Repair, replacement, replacement;

(7) Compensation for losses;

(8) Pay liquidated damages;

(9) Eliminate the impact and restore reputation;

(10) Apologize;

People When hearing civil cases, in addition to applying the above provisions, the court may also admonish, order repentance, confiscate property and illegal gains from illegal activities, and may impose fines and detention in accordance with legal provisions.