Inspection staff work summary

Inspection staff work summary sample (General 6)

A period of time inadvertently has come to an end, after the accumulation of the past period of time and precipitation, we have had a great promotion and change, it is time to carefully write a work summary. But how to write a job summary to be outstanding? The following is my work for you to organize the inspector summary sample (generic 6), welcome to learn and reference, I hope to help you.

inspector work summary 1

Time like a reflection in the water, a wink of a school year has passed. The picture of the beginning of the school year seems to be still in the brain wandering, and now a new school year is coming to us, looking back, a lot of feelings. When I first entered high school, everything seemed to be new to me, so I was eager to try everything, but I hit a lot of walls as a result. However, "learn from the mistakes, long a wisdom", the first year of high school in addition to my efforts to complete their own learning goals, but also the use of a variety of activities to enrich their lives and enrich themselves. Now I will summarize the last academic year as follows:

First, in the study.

Learning is the basic student, in addition to personality and specialties, the minimum is to have knowledge of the cultural heritage, so I have always put learning in the first place, and strive to solidify their own cultural heritage, and resolutely to do not absent from class, not leave early, not late, and cherish every cultural class. After school, I can make full use of the limited resources around me to improve and consolidate my professional knowledge.

Second, in the life

I basically can and students friendly, harmonious **** with each other, help each other love, their own things to do, the formation of independent self-care and self-reliance of good habits. The dormitory is a large collective, eight people live in the same space, but their habits are not the same, which requires mutual understanding and accommodation, only so that we can live together peacefully, for our studies to create a good learning and rest environment. As a 407 dormitory head, it is a great honor in the counselor Mr. Li's careful help and care so that all the members of the dormitory have developed a hygienic, strong sense of collective honor of the good students.

Three, in practice:

(1) as a class cadres in the class, in the counselor and the class with the help and support of all students, basically to complete the tasks entrusted by the teacher to improve their own resilience in dealing with a variety of issues.

(2) as the school newspaper secretary deputy minister, e-commerce association deputy minister of the organization department, the department of organization department members, e-commerce entrepreneurial studio members, I can better grasp and use these platforms, efforts to forge self, achievement self, enrichment of self to enhance their own interpersonal skills and work coordination ability.

(3) actively participate in various activities organized by the school. In this semester has participated in the "high school career planning contest," "reading and speech contest," "Department of the first skit competition" and so on, although not won the prize, but I have benefited greatly from it. I have benefited a lot, so that I firm up their confidence to break forward, cast my determination to go forward and "in the competition to learn, in the learning of progress," the belief of the competition.

Fourth, the use of the remaining time to do volunteer work outside the school

The most important thing is that through the social practice, I realized that when getting along with strangers, equality is the first place, and in the interaction with people to remove some of the identity, status - this is not only conducive to interaction, but also respect for others. Interaction, but also respect for others.

Summary of the work of the inspector 2

I entered the sacred medical school at the moment, I would like to solemnly swear: I volunteer to dedicate myself to medicine, love of the motherland, loyal to the people, abide by the medical ethics, respect for teachers and discipline, hard work, tireless, excellence, comprehensive development. I am determined to do my best to remove the human disease, help the health of the perfect, to maintain the sanctity and honor of the medical profession, to save lives and help the injured, tireless, persistent pursuit of the motherland for the development of the cause of medicine and health and the physical and mental health of mankind to fight for life."

With a hope and a bewilderment stepped into the district hospital laboratory to study. Although I only spent two short weeks here, but also this short two weeks so that I have a more comprehensive understanding of their own professional learning, and further professional knowledge of the future laid a more solid foundation, but also for the future employment to do a good job paving the way.

First of all, the hospital made a relevant introduction and relevant regulations, and its personal image in the hospital, service attitude. In which I felt the hospital's brilliant achievements and the degree of strictness. The first thing I did was to ask for a little bit more information about the hospital, and I was told that the hospital would be able to help me with the rest of my life.

Medicine is all about care and responsibility. At first, I just feel like I'm in the way, I don't know what I can do to help, but it's only in a short time, in the director and the teacher's help has made a lot of progress. Among other things, understanding the use of many reagent test tubes and ways to test for certain ingredients. Thankfully, I gained a greater understanding of blood testing. In the blood clinical examination, looking at the flow cytometer that automatically did the profiling gave me an advance understanding of the specialized knowledge that would come afterward. And in the body fluid clinical examination, the teacher will often let me come to see the sample medical testing, and these samples from different people, or positive or negative body fluid samples is what I have to face in the future. I got a general understanding of how to collect specimens, what to do, how to collect specimens, how to separate them, and how to test them. After that I learned how to collect blood from a vein. In the venous blood collection in a but the precautions, how to do fast and accurate blood collection. In this way, should do a few points: choose the obvious blood vessels, tie, site disinfection, 30 degrees into the needle, back to the blood after the other end connected to the test tube, untie, pull out the needle, with a cotton swab and gently pressure. With that, take off the cap of the test tube and put it under the instrument will be automatically analyzed, and finally just print out the results. Although the form is simple, to be effective and skillful, it is necessary to practice more, to achieve quality touch on the results.

Feel the rigor of this medicine, so as to cultivate their own rigor. The patient's pain as their own pain, with the heart to experience the patient's bewilderment and overwhelmed, as long as you reach out a pair of warm hands in time, the patient will be able to feel the power from the palm of your hand, perhaps they will get a victory over the devil's determination and confidence, the disease is not broken. Patients in the hands of a report, seemingly simple, in fact, this is after a teacher of quality control, experiments, testing, inspection, review, this step by step careful operation of the results, each step are not sloppy. Certainly in the eyes of outsiders inspectors do the same work every day, but when the unexpected or special diseases, only to find that the accumulation of day after day is meaningful, which is why the inspectors not only request the professional learning in mind, but also more need for a large number of practical experience.

Test personnel work summary 3

I seriously completed the undergraduate stage of professional knowledge during the school period, dabbled in many medical books and literature, skilled grasp of the basic theoretical knowledge and operational techniques, have a strong sense of responsibility and dedication, professional knowledge, a strong desire for knowledge, a wide range of hobbies, a strong concept of time; strict self-discipline, hard-working; team affinity, have a strong environmental

Two years of experience in the field of computer science.

With two years of internship experience, I have accumulated a lot of clinical experience, familiar with and mastered the diagnostic and treatment routines of common diseases in various disciplines and principles of treatment, able to formalize a comprehensive and systematic physical examination, timely completion of medical documentation, understanding of commonly used drugs, dosage and usage; many times to participate in the rescue of critically ill patients, professional "three basic" training, during the internship period can be used as the basis of the "three basic" training. "training, during the internship can independently complete the test task, can with the teacher to reach **** knowledge, the hospital leadership and teachers of the affirmation. Can skillfully complete the basic operation of clinical testing and so on. So I hope to find a job related to their own knowledge structure, such as medical testing technology can have a greater space to prove themselves and develop themselves!

Male, 39 years old, director of the hospital neurology department, deputy chief physician. 19xx graduated from Henan Medical University medical department, bachelor's degree, bachelor's degree. After graduation, he gave up the opportunity to stay in the big city and took the initiative to return to his hometown to serve his folks. He has been to Henan Provincial People's Hospital, Guangzhou General Hospital and other places for further study, and has been to Beijing, Xi'an, Jinan, Zhengzhou, Guangzhou and other places to participate in academic activities for many times, and has been awarded the third prize of the Provincial Scientific and Technological Achievement Award, and has written more than ten theses.Over the past sixteen years, he has been conscientious and meticulous, and has seriously studied his business and strived for excellence, and under the premise of standardizing the treatment of neurological diseases, and based on his years of clinical experience. According to the patient's different conditions, to take the standardization of the individualized treatment under the individual treatment, according to the person, the therapeutic effect is remarkable, to many patients brought the gospel.

Over the years, he did not seek to become rich, and focus on the cause of saving lives, down-to-earth, silent dedication to the cause of health care, extremely responsible for the patient, want to think of the patient's thoughts, anxious patient's urgency, especially very difficult for the people, he always try to make the patient spend less money to treat the glass of the difficult and critical patients, he is always sleepy and eaten, detailed questioning of the history of the disease, serious physical examination, close observation of the condition of the patient, the patient's health, the patient's health, the patient's health, the patient's health, the patient's health, the patient's health, the patient's health, the patient's health. For the difficult and critical patients, he always sleeps and sleeps, asks for detailed medical history, carefully examines their physical condition, closely observes the changes of their conditions, and reads a lot of information to make the best treatment plan. He often said: "human life is the most precious, is money can not buy, I have to do my best to save the patient's life.

He specializes in the treatment of cerebrovascular disease and vertigo, encephalitis, epilepsy and other neurological disorders, he also has a handful of "masterpiece", that is, the treatment of "vertigo neck. Now due to people's work fatigue, tension, unexplained "vertigo neck," headache neck a lot, committed the disease, the pain is unbearable, and even thought of suicide, to a number of hospitals, the effect is poor; as long as you find him, he always has a magic formula to make you instantly, lifting the pain, people call him "vertigo disease People call him "the nemesis of vertigo". He is not only knowledgeable and comprehensive, but also kind and homely. He not only cured a lot of patients with common diseases, but also cured a lot of difficult patients like "acute myelitis", "Green Barre" and so on.

His life has no other request, just want to be a common internist, he only thought in the future for the people of his hometown to treat a few more patients, save a few lives, to bring them health, bring happiness, he is such a person.

Inspection staff work summary 4

In the project department of the `leadership, test center support and business guidance under the XX project department of metal inspection staff to work hard, keep abreast of the times, strict implementation of the inspection standards, quality, quantity, and timely completion of the site of the metal inspection tasks. Now summarized as follows:

First, the production completion

(a) non-destructive flaw detection: the completion of the boiler heated surface weld nondestructive testing of 4,466, of which the completion of the ray flaw detection of 2,512; ultrasonic inspection of 1,954;

(b) Physical and chemical inspection: the completion of the spectral analysis of 79150 (pieces) ; completed thickness test 48 pieces, hardness test 196 pieces (points).

Second, production safety,

(a) to strengthen the management of subcontracted personnel and safety training

The focus of the work is to strengthen the supervision and management of subcontracted units of personnel on-site safety. Because the metal inspection is outsourced, the inspection staff of the company's management of the moment can not adapt, for this reason, on the adoption of a flexible and diverse mode of safety education, regardless of time and place for safety education and training, so that they quickly adapt to the site conditions. Adhere to the station will be "three teachings, three checks" management system; adhere to carry out every Monday afternoon safety activities and safety learning. For the actual development of the site "site radiation accident emergency disposal plan". The various types of inspectors to the site of the safety supervision department organized by the entrance examination.

(B) to strengthen the protection of personnel ray detection operations

in the ray detection work before the ray, the ray operator, operating time, location, the scope of the control area, ray safety precautions, protection, etc. in the form of notification posted to the boiler expansion end of the main corridor, the site of the office wall and other personnel can easily be observed location; in the ray detection operations site, according to the specific site conditions Delineation of the control area and supervision area; in the ray operation supervision area set up special guardian, to ensure that the inspectors and the public from the hazards of radiation. From September metal inspection has not occurred since the start of a safety violation of the phenomenon of operation.

(C) to strengthen the daily management of the ray night work and radio sources

anti-habitual violation of the work as the basis of flaw detection safety. The prevention of falling at night, anti-electrocution, anti-night lighting poor tripping over objects on the ground as the focus of safe work.

Third, the inspection quality and progress:

Strictly in accordance with the power industry and the relevant standards for inspection and evaluation, the completion of the inspection project, according to the system and the components of the categorization and organization, so that the inspection project and the installation of the synchronization. In the ray inspection process, found that the outsourcing unit ray flaw detection darkroom processing there are certain problems, we have problems with the negatives to analyze the causes, put forward the treatment program, the unqualified negatives to re-photographing, in order to ensure that the quality of the inspection, and put an end to the miscarriage of justice and omission of inspection. At the same time, the evaluation of the film there is a leakage of evaluation, misjudgment problems pointed out in a timely manner and re-processed in accordance with the provisions of the adherence to the evaluation of the film audit system. The high-temperature superheater, screen superheater and high-temperature reheater are the key parts of supervision. Communicate the problems found in the flaw detection with the welding commissioning department in time. Welding quality is good as well as abnormal information exchange in a timely manner, good quality to continue to maintain the existence of quality problems to find the reasons for timely correction. Ensure that the welding quality is always in a good state, in order to improve the welding quality, to ensure that the hydraulic test and equipment into commercial operation to provide the necessary technical support.

Fourth, there are problems, difficulties and improvement measures

Preventing the installation of boiler burst and leakage of metal inspection work is a difficult task, the solution is to prevent the material with the wrong and found that the welding defects and to maintain the cleanliness of the tube. Requirements for metal inspectors to have a strong sense of responsibility and a positive attitude to work, and at the same time to have a high level of inspection and practical experience.

(a) the problem

The project outsourcing unit, there are not enough inspectors, technical level is not high, ray detection of the negative evaluation there is a "misjudgment, miscalculation, omission" when the phenomenon occurs; ray detection equipment γ-ray source is not in place, there is a tube can not be detected, will affect the follow-up work in a timely manner. affect the follow-up work in a timely manner.

(B) the existence of difficulties

If the boiler pressurized equipment will soon arrive, the boiler tail of the heating surface pressurized equipment lifting there will be 24 hours of work, will inevitably reduce the ray flaw detection operations into the time, there is a lack of time to test, there is a test task can not be completed on time to affect the boiler hydrostatic testing.

(C) Improvement measures

For the inspector's technical level is not high, the number of cases enough, should be increased through the skilled, high level of inspection, strong sense of responsibility inspectors to enrich the construction site, increase the detection surface to ensure that the hydrostatic test schedule requirements; γ-ray source has not been implemented in the case of the use of γ-ray source leasing to solve the X-ray can not be detected to meet the hydrostatic test schedule. Meet the hydrostatic schedule.

V. Suggestions

The company developed a number of management methods and management rules and regulations, the system should be combined with the actual, in order to fully mobilize the staff's enthusiasm for production. Now disorganized, some employees do not want to go to work because of the low wage income. Enterprise annuity canceled, and brother units and other units of society can not be compared. In the last 10 years, the gross national product increased by nearly 4 times, its income is still stuck at the level of 10 years ago, and the whole society's level of development. Caused the company to undertake projects are subcontracted to the technical strength of the construction unit is not strong, its management and construction costs are not low, the company's profitability is very difficult, which will inevitably form a vicious circle, is not conducive to the development of the company. Therefore, good management practices should be adhered to, not conducive to the development of the company, not conducive to the interests of employees should be improved.

inspectors work summary 5

Great efforts to grasp AIDS, tuberculosis, human avian influenza, atypical pneumonia, cholera, viral hepatitis, malaria and other major infectious diseases prevention and control work. In accordance with the 200x xx City, the main points of disease prevention and control work, the first half of the work of the Laboratory is summarized as follows:

First, strengthen the ideological and political work, the implementation of scientific management, and fully mobilize the enthusiasm of the staff to comprehensively improve the level of disease prevention and testing work.

(a) adhere to the people-oriented, strengthen incentives, is a good management to promote the work of the fundamental way, the human factor is to determine the success or failure of the work of the key to do a good job of the ideological work of the staff, to strengthen the quality of the staff education and ability to cultivate is particularly important. In the usual work, we actively promote and carry forward the spirit of teamwork, there are work tasks together. In the life of any difficulties we take the initiative to help solve, so that everyone reflects the warmth of a big family. Combined with Comrade Hu Jintao's "Eight Honors and Eight Shames", we guide the majority of workers to establish a socialist concept of honor and shame, and cultivate patriotism and collectivism. Efforts are made to shape the spirit of dedication, so that employees consciously develop a diligent, conscientious, hard-working, hard-working work attitude. Vigorously advocate the spirit of learning, encourage workers to self-learning, in the weekly centralized learning, so that every employee can be in the ideological, political, work and style of work to improve.

(2) According to the "provincial, local, county-level CDC laboratory construction guidelines" proposed standards, in order to speed up laboratory construction, improve the utilization of instruments, and constantly improve the detection and testing capacity and level, the provincial government invested a lot of money in the north of the Soviet Union, five cities and 34 counties for the instrumentation, the laboratory section of a one-time equipment, equipment, equipment, equipment and equipment 34, valued at more than one million yuan. In order to ensure that these devices are put into use as soon as possible, the provincial CDC jointly with the manufacturer of our two training sessions, we require active participation of inspectors, and strive to learn the technical level. And in the study back to the knowledge and skills learned to pass on to everyone, learn from each other, and promote each other.

Second, do a good job of infectious diseases, endemic diseases, public **** health emergencies emergency sampling and all the testing work, for the prevention and control of major infectious diseases and strengthen the public **** health work to provide assurance.

(a) in order to strengthen the prevention and control of cholera, the CDC held a special intestinal outpatient diarrhea patient testing work conference, the retrieval of cholera pathogenic bacteria to implement the delivery system, *** issued more than three hundred sampling tubes, and currently **** detection of diarrhea patients 228 copies.

(b) in order to fully implement the government's "four free and one care" policy, AIDS testing laboratory to implement free testing work, the area of entertainment services personnel tested 900 people, prison detainees 565 people, 11 patients seeking medical attention (detected a positive patient), the city people's hospital STDs Outpatient 400 people, *** counted 1876 people.

(c) in order to do a good job of iodine deficiency disease prevention and control, daily salt iodine monitoring work is a monthly monitoring of salt iodine in processing enterprises, *** test salt 36 copies, 288 copies of salt in residential households.

(d) in order to do a good job of emergency sampling and testing of public **** health emergencies, prepared an emergency sampling kit, which is equipped with common food poisoning, water contamination, diarrheal diseases, respiratory and intestinal infectious diseases, such as sampling with the items and on-site rapid detection with reagents.

(e) in order to strengthen the food and drinking water hygiene testing, to protect people's health, the food service industry workers to carry out physical examination, *** physical examination of 2909 people. Detection of various types of food 159 copies, 510 copies of tableware, 50 copies of water quality, public **** place (air, public utensils, bathroom water) 463 copies.

(F) in order to strengthen the protection against occupational diseases, the jurisdiction of the lead workers to receive occupational disease physical examination, *** physical examination of the lead workers received 237 people.

(vii) hospital disinfection quality testing work in the area (air, surgical instruments, hand surfaces, disinfectants, disinfectant pots, sewage, etc.) *** test samples 973.

Third, strengthen business learning, and actively participate in the national, provincial and municipal CDC system organized by the laboratory quality control and proficiency testing activities

Improve the standard of detection, and strive to successfully pass the measurement of authentication in the first half of this year, we *** participated in all levels of the CDC system organized by the business of learning 4 times, their own organization to learn 11 times in the learning of everyone's knowledge has been broadened, and the level has been Improvement. In the daily testing work, from the receipt of samples, testing, original records to issue a complete report, we have always been in accordance with national standards, technical specifications, in accordance with the requirements of measurement and certification, from beginning to end to do a good job of testing each sample. In order to ensure the accuracy of the test results, we actively participate in the laboratory quality control assessment at all levels of the CDC system. In the first half of this year, we participated in the 20xx provincial iodine deficiency disease laboratory quality control assessment organized by the provincial CDC. Also participated in the 20xx Yangnan Xu town CDC system physical and chemical microbiological testing inter-laboratory comparison test.

Fourth, in order to adapt to the new era of disease prevention, testing still need to broaden the business

A variety of public **** health emergencies, which may cause a serious impact on public health and social stability of infectious disease outbreaks can still not be ignored to strengthen the laboratory is essential to the construction and management, which requires us to do a good job of our daily work at the same time but also to be prepared for emergencies, at any time to respond to the Emergencies. In addition to the people's health considerations, make full use of existing instrumentation resources, should actively develop new businesses, broaden the scope of business, improve the CDC in the minds of the people's visibility, for disease prevention and control work to make greater contributions.

inspector work summary 6

20xx As of now, my county registration authority 20xx annual inspection of legal persons of institutions has been basically completed, now the annual inspection work is briefly summarized as follows:

First, the annual inspection situation

As of now my county 20xx annual inspection of legal persons of institutions has been The basic end of the county **** registered institutions 315, should be 210 annual inspection of institutions, has been 201 annual inspection of institutions, the annual inspection rate of 95.7%. Among the 201 units that have been inspected annually, 200 legal persons have passed the annual inspection, and 1 has failed the annual inspection (not carrying out business in accordance with the purpose and scope of business, and a rectification notice has been issued). No annual inspection of 9 units, including, for the time being, the appointment of the head of 2 units, due to institutional reforms to be restructured unit 2, should be canceled but did not do the cancellation of the registration procedures 3, to provide not out of the annual inspection of the material, issued a letter of supervision unit 2. At the same time in the annual inspection work, through the reported material validation, timely supervision of the change of registration unit record 31, change the registration matters 32.

Second, specific practices

(a) vigorously publicize and create a good working atmosphere. In order to increase the publicity of the annual inspection of legal persons of institutions, improve the annual inspection rate of institutions, in January issued the "XX County Institutional Preparation Committee Office of the 20xx annual inspection of legal persons of institutions on the work of the notice of the relevant issues" (XX编办20xx1号), the notice will be sent by a special person to the institutions and their competent departments, in the notice, the time requirements for the annual inspection, the annual inspection of the annual inspection The notice was sent to all the institutions and their competent departments, in which the time requirements for annual inspection, the scope of annual inspection, the content and procedures were detailed.

(2) Strictly audit the pass, to ensure the quality of annual inspection.

First, the establishment of the admissibility of the initial review, reviewers review, the person in charge of the final review of the "three review system" to ensure the authenticity of the annual inspection of the legal person of the institution, accuracy and legality.

The second is to put a good material off, strictly require the institutions to submit the annual inspection materials are complete, the content is true, the data is accurate. The fourth is to put a good audit. Requirements of the business units to carry out business work in the previous year to seriously summarize the situation, does not meet the requirements of timely changes, falsification, the responsibility of the relevant personnel to be held accountable. In the annual audit, the audit of a failure to carry out business in accordance with the purpose and scope of business units issued a deadline for rectification supervisory notice.

(C) Improve efficiency and provide quality services to participating units.

In view of the annual inspection of institutions time-sensitive, heavy workload characteristics, in order to ensure the timely completion of the annual inspection tasks, take effective measures, always adhere to the principle of grasping the quality of the work of the annual inspection first, and proactive for the annual inspection of the institutions to provide quality services to promote the annual inspection of the service. First, the annual inspection notice will be sent door-to-door unit by unit. The second is to take great pains to urge the phone. Third, patience and meticulous guidance and explanation. Fourth, the submission of unqualified units try to allow on-site changes to reduce the number of times. Fifth, the annual inspection of qualified units issued on the spot annual inspection of qualified labels, the need to replace the certificate of the site to print the replacement of the certificate of legal person of the unit, no delay, no backlog. Through a full range of quality services, not only vigorously promote the smooth progress of the annual inspection work, but also establish a good social image of the registration and management department.

(D) seriously organize, and do a good job in a timely manner to file the annual inspection materials.

In accordance with the Provincial Registration Bureau of the relevant provisions of the registration file management of legal persons, the use of the side for the annual inspection while organizing the annual inspection material archiving, to ensure that the archive material is complete, clear and traceable.

Third, there are problems

First, individual institutions do not pay enough attention to the annual inspection work, the "Certificate of Legal Personality of the Institution" is not high, the autonomy of their own legal person status is not strong, that the certificate can be inspected without inspection.

Secondly, the coordination between some departments is not enough in place, the future to take the initiative to strengthen the coordination, to obtain the registration of the work of cooperation and support.

Four, the next step in the work of the intention

First, to further increase the "Provisional Regulations for the Administration of Registration of Institutions", "Provisional Regulations for the Implementation of the Provisional Regulations for the Administration of Registration of Institutions," and other relevant laws and regulations, and the propaganda of the business. Strengthen the training of legal representatives of institutions, in order to enhance the awareness of institutions on the registration of active participation.

Secondly, for the institutions do not actively create the conditions for registration so that the county registration rate is low this outstanding problem, we will take the initiative to take measures to further expand the scope of registration.

Thirdly, we will innovate the method of managing the registration of institutions, further strengthen the coordination and communication with the authorities, and obtain the support of the registration work.

Fourth, we will continue to strengthen the construction of the cadres of the registration and management of institutions, improve their own quality, and achieve the administration in accordance with the law.

Fifth, the use of registration and management of institutions, improve the research work of institutions, and further regulate the supervision and management of institutions in accordance with the law to speed up the pace of reform and enhance their own vitality, so that the "Regulations" and "Implementing Rules" of the regulations to the registration of the work of the real.

;