2. Pre-qualification includes the establishment of a qualification examination committee, preliminary examination, detailed examination, clarification, examination and preparation of an examination report.
3. Problems that should be paid attention to in writing project bidding documents A. The characteristics and requirements of engineering construction projects should be reflected; B, must be clear about the content of the bidder's substantive response; C. Prevent illegal and discriminatory clauses from appearing in the bidding documents; D, ensure that the format of the bidding documents is consistent with the specifications of the contract terms; E, the language of the tender documents should be standardized and concise.
4. According to the Measures for Tendering and Bidding of Construction Projects (Order No.30 of seven ministries and commissions such as the National Development and Reform Commission) and the Measures for Tendering and Bidding of Construction Project Goods (Order No.27 of seven ministries and commissions such as the National Development and Reform Commission), the bid bond generally does not exceed 2% of the total bid price, with a maximum of 800,000 yuan.
5. The next step is "bid opening, bid evaluation and winning the bid". A. bid opening: A 1, bid opening preparation A2, bid opening procedure A3, matters needing attention in bid opening b, bid evaluation B 1, bid evaluation committee B2, bid evaluation preparation B3, bid evaluation principle and discipline B4, bid evaluation procedure B5, detailed bid evaluation B6, clarification, explanation and supplement B7 of bid documents.
For reference only! !