The infrastructure of the hospital is well equipped and complete, with reasonable layout of outpatient building, ward building, imaging center, etc. The modern multi-functional comprehensive ward building, which was put into use in 2003, has a floor area of 23,000 square meters and is equipped with 6 elevators, central air-conditioning, centralized oxygen supply, negative pressure suction, call system, centralized monitoring, and other advanced functions, with excellent facilities and elegant environment. The wards implement hotel-style management and services, with three grades of high, medium and low to meet the needs of different patients. The laminar flow purification operating room covers an area of 1,500 square meters, which is built according to the international advanced aseptic isolation technology and equipment, and the cleanliness can be more than one million, and 10 operating rooms can be operated at the same time; the 4,000-square-meter Imaging Center occupies four floors, which is innovative, practical, functional, and equipped with advanced equipments, and it is at the leading level of Chinese medicine hospitals of the same level in the country.