2, business license of the enterprise legal person (copy), project siting advice or land use permit;
3, feasibility study report of the project;
4, floor plan of the project (with scale), rendering;
5, such as the absence of a (pre)feasibility study report, or Although there is a feasibility study report, but no information on the following, need to provide additional information:
① project name, construction scale (population, number of households), project location, nature, type;
② length of the project construction period, the date of commencement, date of completion;
③ total project investment, phasing of the investment, the construction unit, telephone, fax, contact person;
④ The amount of earth during the construction of the project, the place where it is piled up, the amount of earth backfilled, the amount of earth discarded, the place where it is discarded;
⑤ The number of construction personnel, the number of construction vehicles, the location of construction camps, the source of water and heating during the construction period, the direction of wastewater, waste gas, and solid wastes;
⑥ The maximum hourly consumption and annual consumption of water, electricity, and heating of the project; and the direction of the solid wastes solid wastes after the completion of the project;
⑦ project water supply pipe diameter, drainage direction (name of the sewage treatment plant), lightning and seismic levels;
⑧ project construction whether there is water facilities, if any water design and water station location;
6, such as Party A to build their own heating boiler room, then provide the boiler tonnage, number, boiler room size, location, furnace, chimney height, chimney outlet diameter, type of fuel, quantity, coal and other equipment. Diameter, fuel type, quantity, coal quality analysis;
7, the location, size and scale of the pump room provided by the project.
8, the project's various other relevant approvals: proof of water supply, proof of power supply, proof of heat supply, proof of gas supply, proof of sewage acceptance, proof of acceptance of garbage disposal, proof of protection of cultural relics, proof of land use for coastal defense forests.
9, the project construction whether the existence of water facilities, such as providing relevant information.
I hope this can help you! Learn about wastewater treatment knowledge on easy water purification network