Honghu City Wastewater Treatment Plant/Honghu City Venture Water Co., Ltd, located in Jingzhou City, Hubei Province, the plant is specifically located in
Daxing Village, Xindi Office, Honghu City (Honghu City Wastewater Treatment Plant), with a design capacity of 70,000 m3 of wastewater treatment per day.
The main construction content includes plant civil construction, process equipment, process piping installation, electrical, automatic control system installation, lighting, lightning protection and grounding, heating, ventilation, plant road construction and greening. Honghu Sewage Treatment Plant/Honghu Chuangye Water Co., Ltd. has been officially put into operation since June 2003, and the sewage treatment equipment has been running well, with a daily average sewage treatment capacity of 3.20 million cubic meters. The project adopts advanced sewage treatment equipment, the main process of the plant adopts oxidation ditch treatment process, and the treated sewage water quality discharge standard is "Pollutant Discharge Standard for Urban Sewage Treatment Plant" (GB18918-2002) Class I B discharge standard. Honghu City Sewage Treatment Plant/Honghu City Venture Water Co., Ltd. was built to greatly improve the city's water environment, the treatment of pollution, the protection of water quality and ecological balance of the local watershed has a very important role, and at the same time to improve the investment environment in Jingzhou City, Jingzhou City, the realization of sustainable economic and social development has a positive role in advancing the ?