Huaneng Jinggangshan power plant project has adhered to a high starting point from the beginning of preparation, and solidly implemented the project legal person responsibility system, bidding system, project supervision responsibility system, contract system and capital system. For the first time in the history of Jiangxi electric power construction, the national construction bidding was carried out and the project supervision responsibility system was implemented for the first time, which created a precedent in the history of Jiangxi electric power construction.
Huaneng Jinggangshan Power Plant adopts advanced environmental protection treatment equipment to ensure that all pollutant indexes meet the environmental protection emission standards-electrostatic precipitator is used for flue gas, and the dust removal efficiency reaches 99.67%; Centralized treatment of production wastewater, ash flushing and recycling, to achieve zero discharge of production wastewater; Noise at factory boundary is superior to environmental protection requirements. At the same time, on-line flue gas monitoring device (CEMS) and dry ash separation equipment are designed.