What type of copywriting should this belong to

This should be called Project Subcontract (or Agreement). Lots of information on the internet.

To provide you with a model:

-------------------------------------------------------------

Project contracting contract

2008/5/14

Party A:

Party B:

Party A, due to the needs of production and operation, will be XXXX project contracted to Party B. In order to clarify the rights and obligations of the two parties, according to the "People's Republic of China *** and the State of the Contract Law" and the provisions of the relevant laws and regulations, on the basis of equality, after friendly consultation, to reach agreement on the following, by the two parties *** with scrupulous observance:

Article I Contracting time and place

This contract shall be signed by A and B on XXXX, XX, XXXX at XXXXXX.

Article 2 Content and location of the contracted project:

1 Content of the project:

2 Location of the project:

3. Duration of the contract: from XXXX, XXXX to XXXX, XXXX.

Article 3 Rights and Obligations of Both Parties

1 Obligations and Rights of Party A

1.1 Party A provides Party B with a working site, and provides Party B with free water and electricity in the course of on-site construction.

1.2 Provide Party B with a list of persons in charge, so that the two sides of the relevant personnel to connect the work.

1.3 Pay Party B's contracting fee according to the time agreed in the contract.

1.4 Party A has the right to issue operation plans and arrange temporary projects to Party B, and has the right to inspect, supervise and assess the quantity and quality of projects completed by Party B.

1.5 Party A has the right to deduct the corresponding contracting fee if Party B fails to complete the assigned tasks or meet the quality requirements according to the completion of production quotas, quality requirements and performance of Party B's personnel.

1.6 If Party B's production is affected by Party B's responsibility, and quality, equipment and personal injury or death accidents occur, causing economic loss to Party A, Party B shall compensate Party A for the loss.

1.7 Party B's personnel in Party A during the work, due to irresponsible work, violation of the contract or violation of Party A's labor discipline and social order, the circumstances are serious, causing losses to Party A, Party A has the right to terminate the contract in advance, and from the contract fee deducted from the corresponding damages, the shortfall shall be borne by Party B.

1.8 Party B in the process of engineering fraud, Party A has the right to terminate the contract at any time. Party A has the right to recover damages from Party B if the damages are caused to Party A.

2 Rights and Obligations of Party B

2.1 Party B must have the corresponding project contracting qualification, and submit the qualification certificate to Party A for examination and keep a copy for record. If Party B causes any personal or property loss to Party A due to the operation beyond the business scope by providing false qualification certificates, Party B shall bear the full responsibility.

2.2 Party B appoints the person in charge of the site and the list of related personnel, responsible for the performance of the contract. If the person in charge of the site is incompetent, Party A has the right to suggest replacement.

2.3 Party B shall arrange personnel to work in a timely manner according to the operation plan and arranged projects issued by Party A, and complete the projects within the time specified by Party A, and ensure the quality.

2.4 Party B shall educate the staff assigned to Party A in strict accordance with Party A's safety knowledge and operating procedures, and organize the work according to Party A's regulations and requirements. If Party B causes economic loss to Party A due to Party B's responsibility, Party B shall bear all the economic loss.

2.5 Party B shall strictly manage the staff assigned to Party A. Party B shall bear full responsibility for any injury or death of its personnel caused by Party B's management responsibility or safety responsibility.

2.6 The large-scale equipment required by Party B to complete the project can be provided by Party A after negotiation, and the small tools will be provided by Party B itself.

2.7 Party B shall issue uniform work permit to the personnel assigned to Party A, and those who enter or leave Party A's factory shall show it to Party A's gatekeeper and cooperate with Party A's management.

(The rights and obligations of both parties can also be agreed by each industrial department depending on the project)

Article IV Contracting Fee and Payment Methods

1.The total contracting cost of the project is:

2.Payment Methods:

3.Payment Time;

Article V Changes to the Contract

During the fulfillment of the contract for the specific content needs to be changed, the two sides to negotiate separately and agreed in writing, additional content as an integral part of this contract.

Article VI Termination of Contract

1. Party A has the right to terminate the contract unilaterally under any of the following circumstances:

1.1 Party B provides Party A with false qualification certificates;

1.2 Party B violates Party A's rules and regulations on safety or fails to complete Party A's tasks in a timely manner;

1.3 Party B fails to meet the agreed quality standards during the construction process. quality of the construction process does not meet the agreement of both parties, resulting in Party A's interests suffered losses.

2. Party A does not pay the contracting fee to Party B as agreed, Party B may unilaterally terminate the contract.

Article 7 Responsibility for breach of contract

1. Party B shall be responsible for compensation if its construction fails to meet Party A's quality requirements, resulting in loss of Party A's interests;

2. Party B shall be held fully responsible for injuries or deaths caused by Party B's management responsibility or safety responsibility;

3. Losses caused by violation of the agreement of the present contract by either party shall be compensated by the defaulting party to the contracting party for economic losses. Party A shall be liable for the economic losses caused by the breach of contract;

4. Party A shall be liable for the corresponding breach of contract if Party A does not pay the contracting fee to Party B according to the agreement.

Article 8 Subcontracting

In order to ensure the quality and progress of the contracted project, the Contractor cannot subcontract the project to a third party for completion.

Article IX Settlement of Disputes

Disputes occurring in the course of the fulfillment of this contract shall be settled by the two parties through consultation, and if the consultation fails, the disputes shall be resolved in the following ways:

(1) Submission to the Arbitration Commission of Handan for arbitration; (2) Sueing to the People's Court in accordance with the law.

Article X Others

1 Matters not covered in this contract shall be resolved through supplementary consultation between the two parties, and the supplementary agreement shall have the same legal effect as this agreement.

2 This contract is in six copies, three copies for each party, with the same legal effect.

3 This contract shall enter into force after being signed and sealed by both parties.

Party A: (seal) Party B: (seal)

Legal Representative/Authorized Representative: Legal Representative/Authorized Representative:

Party A's bank account: Party B's bank account:

Account: Account:

Year Month Day