Buried integrated wastewater treatment equipment
1, buried integrated wastewater treatment equipment operators should first open the water inlet valve, outlet valve, start the equipment into the water to raise the water pump, the conditioning pool of sewage transported to the start of sewage treatment equipment. 2, when the water level reaches half the height of buried integrated wastewater treatment equipment to terminate the pump into the water, open the blower inlet valve and the Fan, slowly open the fan outlet valve, to the contact oxidation pool aeration for 48 hours and then start the water intake to raise the pump will be added to the sewage equipment 3/4, and then to the pool aeration for 24 hours. 3, buried integrated sewage treatment equipment operators should use their hands to contact the filler is not a sticky feeling, check the growth of microorganisms in the water body until the filler grows a layer of orange-yellow biofilm before the successive delivery to the equipment Sewage, the amount of water should be gradually increased to the planned amount of water. 4, regularly check the growth of microorganisms in the water, abnormalities found in time to control the amount of incoming water and adjustments.